ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 54 more items below.
| Item | Quantity | R1Miller Contracting Group INC | R2Vtf Excavation LLC | R3Vernon Nagel INC | R4Mark Schaffer Excavating & Trucking INC | R5Miller Bros Const INC | R6Beaver Excavating Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 50,540 CY | $6.25 | $5.87 | $6.80 | $12.00 | $11.20 | $13.05 | 26% |
| 203E20000 EMBANKMENT | 53,853 CY | $4.75 | $6.36 | $10.00 | $6.00 | $11.20 | $15.25 | 21% |
| 452E15010 12" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 1,387 SY | $73.00 | $85.29 | $78.00 |
| Item | Quantity | R1Miller Contracting Group INC | R2Vtf Excavation LLC | R3Vernon Nagel INC | R4Mark Schaffer Excavating & Trucking INC | R5Miller Bros Const INC | R6Beaver Excavating Company |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,000 | $1,489 | $7,500 | $1,000 | $40,000 | $10,000 |
| 202E20010 HEADWALL REMOVED | 1 EACH | $265 | $199 | $250 | $150 | $225 | $82.44 |
| 202E32000 CURB REMOVED | 204 FT | $4.00 | $5.97 | $3.00 | $3.00 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $90.00 |
| $75.00 |
| $82.00 |
| 8% |
| 622E41000 PORTABLE BARRIER, 32" | 3,520 FT | $23.00 | $26.73 | $22.00 | $45.00 | $22.00 | $23.34 | 7% |
| 205E10300 LIME | 483 TON | $161 | $219 | $175 | $150 | $148 | $182 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $71,000 | $89,155 | $40,000 | $40,000 | $40,000 | $100,000 | 6% |
| 205E10050 LIME STABILIZED EMBANKMENT | 6,218 CY | $9.00 | $23.85 | $18.00 | $8.50 | $8.25 | $20.35 | 5% |
| 832E30000 EROSION CONTROL | 53,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 1,938 FT | $18.50 | $21.64 | $17.00 | $20.00 | $17.00 | $19.23 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $28,000 | $33,096 | $20,000 | $20,000 | $40,000 | $32,723 | 2% |
| 611E05200 12" CONDUIT, TYPE F, 707.05 TYPE C OR 707.21 | 298 FT | $80.00 | $49.79 | $64.00 | $50.00 | $90.00 | $65.15 | 2% |
| 659E10000 SEEDING AND MULCHING | 26,195 SY | $0.75 | $1.88 | $0.64 | $0.70 | $1.20 | $0.64 | 2% |
| 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2 | 356 SY | $53.00 | $57.03 | $52.00 | $100 | $55.00 | $72.36 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $18,000 | $11,996 | $15,000 | $20,000 | $13,000 | $10,135 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $18,000 | $9,547 | $25,000 | $8,000 | $10,000 | $18,947 | 1% |
| 605E06000 4" BASE PIPE UNDERDRAINS | 1,839 FT | $7.50 | $8.24 | $7.00 | $10.00 | $8.50 | $12.15 | 1% |
| 304E20000 AGGREGATE BASE | 330 CY | $41.00 | $57.03 | $54.00 | $100 | $55.50 | $60.73 | 1% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 41 CY | $290 | $382 | $265 | $300 | $300 | $265 | 1% |
| 607E15000 FENCE, TYPE 47 | 820 FT | $13.50 | $15.59 | $12.25 | $15.00 | $12.25 | $14.40 | 1% |
| 609E24000 CURB, TYPE 4-A | 1,825 FT | $5.50 | $6.36 | $10.00 | $6.00 | $6.55 | $8.50 | 1% |
| $2.13 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 1,957 FT | $1.75 | $4.07 | $2.80 | $1.00 | $2.00 | $6.88 |
| 202E38000 GUARDRAIL REMOVED | 2,273 FT | $2.15 | $2.55 | $2.00 | $1.50 | $2.00 | $1.40 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $190 | $199 | $250 | $500 | $225 | $133 |
| 202E75000 FENCE REMOVED | 820 FT | $1.65 | $1.91 | $2.00 | $1.75 | $1.50 | $1.60 |
| 204E10000 SUBGRADE COMPACTION | 1,884 SY | $1.00 | $1.96 | $1.00 | $5.00 | $2.25 | $2.79 |
| 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN | 250 FT | $21.25 | $24.95 | $19.60 | $24.00 | $19.60 | $23.10 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 3 EACH | $2,500 | $2,858 | $2,245 | $3,500 | $2,245 | $3,100 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 2 EACH | $525 | $605 | $475 | $1,000 | $475 | $1,000 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 7 CY | $150 | $104 | $60.00 | $130 | $281 | $109 |
| 659E20000 COMMERCIAL FERTILIZER | 3.54 TON | $450 | $955 | $400 | $450 | $750 | $400 |
| 659E35000 WATER | 141 MGAL | $0.15 | $1.27 | $0.10 | $0.10 | $1.00 | $0.10 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,650 | $1,878 | $2,500 | $1,000 | $1,500 | $1,475 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $4,235 | $10,693 | $1,500 | $4,000 | $4,000 | $4,200 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $8,500 | $10,590 | $7,000 | $3,000 | $8,500 | $8,320 |
| 602E20000 CONCRETE MASONRY | 0.6 CY | $1,350 | $4,607 | $4,010 | $4,000 | $3,400 | $2,081 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 30 FT | $18.00 | $11.48 | $19.00 | $16.50 | $35.00 | $16.26 |
| 611E01400 6" CONDUIT, TYPE E | 10 FT | $25.00 | $33.41 | $6.00 | $36.00 | $20.00 | $11.07 |
| 611E01500 6" CONDUIT, TYPE F | 10 FT | $25.00 | $33.41 | $20.00 | $36.00 | $36.00 | $11.07 |
| 611E98180 CATCH BASIN, NO. 3A | 3 EACH | $1,925 | $2,849 | $2,500 | $3,800 | $2,650 | $2,298 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 2,274 FT | $2.15 | $1.29 | $1.50 | $2.00 | $1.65 | $2.90 |
| 407E20000 NON-TRACKING TACK COAT | 27 GAL | $2.40 | $1.27 | $2.20 | $2.20 | $1.00 | $2.20 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 21 CY | $400 | $541 | $375 | $385 | $425 | $375 |
| 609E24510 CURB, TYPE 4-C | 250 FT | $16.50 | $26.49 | $18.00 | $20.00 | $16.50 | $18.50 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 4 EACH | $8.25 | $14.00 | $8.00 | $8.00 | $7.55 | $7.55 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, ONE-WAY | 26 EACH | $8.50 | $12.73 | $8.00 | $8.00 | $7.80 | $7.80 |
| 630E07500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X22 | 49.9 FT | $45.00 | $50.92 | $45.00 | $50.00 | $41.00 | $41.00 |
| 630E08000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W12X30 | 61.3 FT | $49.00 | $69.37 | $45.00 | $55.00 | $45.00 | $45.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 285.5 SF | $30.00 | $34.37 | $27.20 | $33.00 | $27.20 | $27.20 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 4 EACH | $1,000 | $1,241 | $925 | $1,000 | $925 | $925 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $11.00 | $63.65 | $10.00 | $12.00 | $10.00 | $10.00 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 2 EACH | $100 | $191 | $185 | $225 | $185 | $185 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $5.50 | $76.38 | $10.00 | $10.00 | $10.00 | $10.00 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 0.11 MILE | $4,300 | $9,547 | $7,500 | $7,500 | $7,500 | $7,500 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.5 MILE | $4,400 | $3,182 | $2,500 | $2,500 | $2,500 | $2,500 |
| 642E00204 LANE LINE, 6", TYPE 1 | 0.5 MILE | $4,000 | $1,591 | $1,250 | $1,250 | $1,250 | $1,250 |
| 642E00300 CENTER LINE, TYPE 1 | 0.06 MILE | $4,600 | $19,094 | $15,000 | $15,000 | $15,000 | $15,000 |
| 253E02000 PAVEMENT REPAIR | 20 CY | $500 | $515 | $425 | $400 | $250 | $462 |
| 407E10000 TACK COAT | 20 GAL | $2.40 | $1.27 | $2.20 | $2.20 | $1.00 | $2.20 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 10 CY | $450 | $318 | $440 | $400 | $250 | $440 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $76.00 | $127 | $77.00 | $85.00 | $65.00 | $85.00 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 4 EACH | $1,955 | $2,291 | $2,160 | $2,500 | $2,160 | $2,500 |
| 614E12420 DETOUR SIGNING | 1 LS | $4,350 | $5,092 | $4,000 | $5,000 | $5,000 | $4,000 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 4 EACH | $275 | $318 | $250 | $280 | $250 | $250 |
| 614E12600 REPLACEMENT DRUM | 20 EACH | $66.00 | $76.38 | $60.00 | $65.00 | $60.00 | $60.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, 1WAY | 71 EACH | $6.75 | $7.64 | $6.00 | $7.00 | $6.00 | $6.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 71 EACH | $13.00 | $15.28 | $6.00 | $13.00 | $12.00 | $12.00 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 1.13 MILE | $2,475 | $3,182 | $2,500 | $2,500 | $2,500 | $2,500 |
| 616E10000 WATER | 40 MGAL | $1.00 | $1.27 | $20.00 | $0.10 | $55.00 | $34.99 |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $48.00 | $62.76 | $65.00 | $75.00 | $62.00 | $58.00 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 10 SNMT | $925 | $1,082 | $850 | $1,000 | $850 | $850 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,600 | $1,018 | $1,500 | $2,800 | $1,750 | $3,379 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E10000 EXCAVATION | 50,540 CY | $6.25 | $316k | 23% |
| 203E20000 EMBANKMENT | 53,853 CY | $4.75 | $256k | 18% |
| 452E15010 12" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 1,387 SY | $73 | $101k | 7% |
| 622E41000 PORTABLE BARRIER, 32" | 3,520 FT | $23 | $81k | 6% |
| 205E10300 LIME | 483 TON | $161 | $78k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $71,000 | $71k | 5% |
| 205E10050 LIME STABILIZED EMBANKMENT | 6,218 CY | $9 | $56k | 4% |
| 832E30000 EROSION CONTROL | 53,000 EACH | $1 | $53k | 4% |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 1,938 FT | $18.5 | $36k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $28,000 | $28k | 2% |