LAW-SR 7-00.66 Rockfall
LAW County · est $7.1M
Bid dateThursday, February 27—
LAW County · est $7.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 44 more items below.
| Item | Quantity | R1Cast & Baker Corporation | R2Eclipse CO LLC | R3Kanawha Stone Company Incorporated | R4Beaver Excavating Company | % of bid |
|---|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 457,501 CY | $10.25 | $13.40 | $13.79 | $14.45 | 71% |
| 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA | 2,816 FT | $115 | $93.90 | $110 | $110 | 5% |
| 208E15000 PRESPLITTING | 12,255 SY | $15.00 | $19.00 | $20.07 | $20.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $175,000 | $200,000 | $100,757 | $200,000 | 3% |
| Item | Quantity | R1Cast & Baker Corporation | R2Eclipse CO LLC | R3Kanawha Stone Company Incorporated | R4Beaver Excavating Company |
|---|---|---|---|---|---|
| 202E30701 CONCRETE BARRIER REMOVED, AS PER PLAN | 739 FT | $11.50 | $9.80 | $11.34 | $8.00 |
| 202E38000 GUARDRAIL REMOVED | 79 FT | $14.00 | $6.05 | $2.00 | $7.50 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH | $550 | $476 | $3,733 | $250 |
| 203E20000 EMBANKMENT | 6,767 CY | $1.20 | $2.45 | $3.77 | $8.00 |
| 204E10000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 201E11000 CLEARING AND GRUBBING | 1 LS | $150,000 | $119,947 | $384,517 | $265,000 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $150,000 | $31,000 | $80,000 | $100,000 | 2% |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 2,890 FT | $50.00 | $49.95 | $48.50 | $50.00 | 2% |
| 832E30000 EROSION CONTROL | 106,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 488 CY | $210 | $210 | $208 | $213 | 2% |
| 208E10000 PRE-BLAST CONDITION SURVEY | 1 LS | $85,000 | $175,000 | $95,992 | $150,000 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 960 HOUR | $80.00 | $65.00 | $60.00 | $65.00 | 1% |
| 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 783 SY | $98.00 | $84.00 | $89.90 | $90.00 | 1% |
| 659E10000 SEEDING AND MULCHING | 75,521 SY | $1.00 | $0.55 | $0.75 | $0.96 | 1% |
| 616E10000 WATER | 1,444 MGAL | $50.00 | $14.90 | $50.00 | $42.00 | 1% |
| 601E34200 ROCK CHANNEL PROTECTION, TYPE C WITHOUT FILTER | 809 CY | $80.00 | $84.70 | $56.27 | $80.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $42,000 | $146,282 | $43,587 | $50,000 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $1,800 | $927 | $1,600 | $900 | 0% |
| 614E11630 INCREASED BARRIER DELINEATION | 135 FT | $150 | $2.60 | $1.25 | $2.50 | 0% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $55,096 | $25,953 | $50,000 | 0% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(1 1/2") | 11,700 SY | $1.50 | $2.40 | $2.39 | $3.20 | 0% |
| 953 SY |
| $5.00 |
| $2.30 |
| $6.05 |
| $10.00 |
| 208E12000 BLASTING CONSULTANT | 1 LS | $5,500 | $40,000 | $15,000 | $20,000 |
| 208E13000 AIR BLAST AND NOISE CONTROL | 1 LS | $5,500 | $15,000 | $11,400 | $11,400 |
| 208E14000 VIBRATION CONTROL AND MONITORING | 1 LS | $16,000 | $15,000 | $11,400 | $11,400 |
| 208E16000 HYDROLOGIST | 1 LS | $1,600 | $77,250 | $1,500 | $20,000 |
| 606E15050 GUARDRAIL, TYPE MGS | 6.25 FT | $105 | $75.00 | $98.40 | $75.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 1 EACH | $4,000 | $2,500 | $3,570 | $2,500 |
| 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH | $3,500 | $2,750 | $3,280 | $2,750 |
| 622E10201 BARRIER TRANSITION, AS PER PLAN | 1 EACH | $4,000 | $7,000 | $4,310 | $4,310 |
| 622E25010 CONCRETE BARRIER END SECTION, TYPE D, REINFORCED | 1 EACH | $7,400 | $10,001 | $3,000 | $3,000 |
| 659E14000 REPAIR SEEDING AND MULCHING | 3,776 SY | $2.00 | $1.05 | $0.75 | $1.80 |
| 659E20000 COMMERCIAL FERTILIZER | 20.38 TON | $425 | $515 | $625 | $400 |
| 659E31000 LIME | 15.6 ACRE | $32.00 | $206 | $75.00 | $30.00 |
| 659E35000 WATER | 203.9 MGAL | $1.00 | $1.05 | $1.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,200 | $4,000 | $4,000 | $2,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $5,500 | $4,200 | $12,960 | $6,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $9,500 | $7,000 | $11,950 | $10,000 |
| 304E20000 AGGREGATE BASE | 157 CY | $85.00 | $78.75 | $106 | $130 |
| 407E10000 TACK COAT | 995 GAL | $2.00 | $1.90 | $1.85 | $190 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 1.2 MILE | $2,000 | $6,180 | $5,500 | $5,000 |
| 621E00100 RPM | 37 EACH | $115 | $72.10 | $108 | $106 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 37 EACH | $50.00 | $9.40 | $9.95 | $20.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 7 FT | $26.00 | $28.35 | $24.50 | $25.00 |
| 630E08000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W12X30 | 98.1 FT | $100 | $51.50 | $85.00 | $90.00 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 3 EACH | $1,100 | $2,833 | $1,025 | $1,100 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $101 | $155 | $95.00 | $100 |
| 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO | 1 EACH | $405 | $618 | $380 | $400 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 1 EACH | $375 | $618 | $340 | $640 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 1.2 MILE | $1,800 | $1,648 | $1,600 | $2,331 |
| 642E00204 LANE LINE, 6", TYPE 1 | 0.6 MILE | $1,800 | $1,725 | $1,675 | $1,517 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 1 EACH | $3,500 | $1,957 | $5,000 | $1,900 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 2 EACH | $160 | $191 | $150 | $185 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 58 EACH | $24.00 | $20.60 | $22.50 | $10.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 58 EACH | $27.00 | $20.60 | $25.00 | $13.00 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.57 MILE | $3,000 | $2,936 | $2,850 | $3,490 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.26 MILE | $9,200 | $8,858 | $8,600 | $6,700 |
| 614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I | 660 FT | $2.00 | $1.80 | $1.75 | $2.00 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 27 FT | $13.50 | $12.90 | $12.50 | $9.00 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 6 SNMT | $1,100 | $876 | $1,000 | $850 |
| 619E16000 FIELD OFFICE, TYPE A | 6 MNTH | $2,500 | $750 | $5,470 | $3,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E10000 EXCAVATION | 457,501 CY | $10.25 | $4.69M | 69% |
| 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA | 2,816 FT | $115 | $324k | 5% |
| 208E15000 PRESPLITTING | 12,255 SY | $15 | $184k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $175,000 | $175k | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $150,000 | $150k | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $150,000 | $150k | 2% |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 2,890 FT | $50 | $145k | 2% |
| 832E30000 EROSION CONTROL | 106,000 EACH | $1 | $106k | 2% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 488 CY | $210 | $102k | 2% |
| 208E10000 PRE-BLAST CONDITION SURVEY | 1 LS | $85,000 | $85k | 1% |