MAH-LG FY2020
MAH County · est $0.9M
Bid dateThursday, February 27—
MAH County · est $0.9M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 1items by winning bid’s extended amount · 35 more items below.
| Item | Quantity | R1Foust Construction INC | R2Cornerstone Electric INC | R3Cardinal Electric Power INC | R4Miller Cable Company | R5Perram Electric INC | R6Zenith Systems LLC | R7J Ranck Electric INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 100% |
| Item | Quantity | R1Foust Construction INC | R2Cornerstone Electric INC | R3Cardinal Electric Power INC | R4Miller Cable Company | R5Perram Electric INC | R6Zenith Systems LLC | R7J Ranck Electric INC |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | — | $500 | $1,500 | $100 | $250 | $5,507 | $1.00 |
| 611E00400 4" CONDUIT, TYPE E | 110 FT | — | $2.00 | $12.00 | $2.00 | $6.65 | $13.84 | $19.00 |
| 625E00480 CONNECTION, UNFUSED PERMANENT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 33 EACH |
| — |
| $80.00 |
| $45.00 |
| $100 |
| $120 |
| $83.38 |
| $150 |
| 625E11200 LIGHT TOWER, BB100 | 8 EACH | — | $14,800 | $21,125 | $14,000 | $15,375 | $18,752 | $27,000 |
| 625E12200 LIGHT TOWER, BBB100 | 1 EACH | — | $14,800 | $20,125 | $14,150 | $15,400 | $19,700 | $27,000 |
| 625E13200 LIGHT TOWER, BBBB100 | 9 EACH | — | $14,800 | $21,950 | $14,170 | $15,420 | $18,797 | $27,000 |
| 625E15000 LIGHT TOWER FOUNDATION, 36" X 15' DEEP | 7 EACH | — | $7,500 | $3,000 | $7,050 | $8,700 | $9,496 | $15,750 |
| 625E15100 LIGHT TOWER FOUNDATION, 36" X 20' DEEP | 7 EACH | — | $7,500 | $4,500 | $8,000 | $10,860 | $10,779 | $14,000 |
| 625E15200 LIGHT TOWER FOUNDATION, 36" X 25' DEEP | 4 EACH | — | $8,000 | $5,500 | $9,800 | $12,865 | $12,701 | $10,000 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 2,637 FT | — | $2.00 | $2.10 | $3.00 | $2.40 | $2.52 | $3.00 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 7,070 FT | — | $5.00 | $4.95 | $6.65 | $6.15 | $6.63 | $6.00 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 799 FT | — | $35.00 | $23.00 | $38.00 | $31.60 | $41.81 | $40.00 |
| 625E26263 LUMINAIRE, HIGH MAST, SOLID STATE (LED), AS PER PL | 13 EACH | — | $1,000 | $1,450 | $1,100 | $1,105 | $1,410 | $1,200 |
| 625E26263 LUMINAIRE, HIGH MAST, SOLID STATE (LED), AS PER PL | 30 EACH | — | $1,000 | $1,500 | $1,450 | $1,120 | $1,340 | $1,225 |
| 625E26263 LUMINAIRE, HIGH MAST, SOLID STATE (LED), AS PER PL | 12 EACH | — | $1,000 | $1,340 | $1,500 | $1,130 | $1,354 | $1,225 |
| 625E28000 GLARE SHIELD | 8 EACH | — | $100 | $150 | $130 | $128 | $115 | $200 |
| 625E29000 TRENCH | 6,860 FT | — | $5.00 | $2.50 | $9.00 | $6.90 | $14.99 | $2.50 |
| 625E30700 PULL BOX, 725.08, 18" | 10 EACH | — | $800 | $795 | $600 | $1,000 | $673 | $925 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | — | $950 | $1,145 | $750 | $1,175 | $861 | $1,075 |
| 625E31510 PULL BOX REMOVED | 24 EACH | — | $100 | $250 | $130 | $77.50 | $321 | $300 |
| 625E32000 GROUND ROD | 36 EACH | — | $200 | $65.00 | $110 | $255 | $248 | $275 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | — | $6,000 | $4,975 | $7,000 | $7,300 | $11,837 | $4,500 |
| 625E36000 PLASTIC CAUTION TAPE | 6,860 FT | — | $0.25 | $0.25 | $0.25 | $0.05 | $0.09 | $0.50 |
| 625E75400 LIGHT POLE REMOVED | 86 EACH | — | $100 | $300 | $175 | $310 | $330 | $275 |
| 625E75502 PORTION OF LIGHT POLE FOUNDATION REMOVED | 86 EACH | — | $100 | $250 | $150 | $465 | $823 | $275 |
| 625E75510 POWER SERVICE REMOVED | 1 EACH | — | $500 | $950 | $350 | $930 | $339 | $550 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (ON CONTROL CENTE | 1 EACH | — | $800 | $850 | $6,500 | $1,600 | $385 | $500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 250 HOUR | — | $50.00 | $65.00 | $60.00 | $65.00 | $74.75 | $30.00 |
| 614E12420 DETOUR SIGNING | 1 LS | — | $1,000 | $7,400 | $19,500 | $7,000 | $7,360 | $7,500 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 2 SNMT | — | $1,000 | $1,200 | $950 | $1,100 | $1,208 | $2,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | — | $6,500 | $10,000 | $6,887 | $14,037 | $8,625 | $40,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | — | $1,000 | $6,500 | $22,100 | $48,370 | $37,867 | $53,600 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | — | $1,000 | $700 | $1,800 | $1,500 | $3,067 | $3,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | — | $1,500 | $3,500 | $9,750 | $2,000 | $8,673 | $5,000 |
| 624E10000 MOBILIZATION | 1 LS | — | $1,000 | $7,800 | $20,000 | $20,000 | $53,266 | $40,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 1,000 EACH | $1 | $1k | 100% |