GAL-SR 141-08.85
GAL County · est $0.3M
Bid dateThursday, April 9—
GAL County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 13 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2D G M INC | R3George J Igel & CO INC | R4Amaazz Construction Ohio LLC | R5Axis Civil Construction LLC | R6Allard Excavation LLC | R7Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 5,874 CY | $23.50 | $27.00 | $25.50 | $23.00 | $23.90 | $23.75 | $33.00 | 45% |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 1 EACH | $45,000 | $26,000 | $24,000 | $5,385 | $20,000 | $86,430 | $42,000 | 15% |
| 441E50000 |
| Item | Quantity | R1Shelly & Sands INC | R2D G M INC | R3George J Igel & CO INC | R4Amaazz Construction Ohio LLC | R5Axis Civil Construction LLC | R6Allard Excavation LLC | R7Eclipse CO LLC |
|---|---|---|---|---|---|---|---|---|
| 202E75001 FENCE REMOVED, AS PER PLAN | 334 FT | $0.25 | $3.00 | $2.50 | $1.85 | $6.00 | $1.75 | $7.50 |
| 208E10000 PRE-BLAST CONDITION SURVEY | 1 LS | $500 | $1.00 | $1,000 | $5,300 | $4,000 | $1,325 | $1,546 |
| 208E13000 AIR BLAST AND NOISE CONTROL | 1 LS |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 81 CY |
| $223 |
| $235 |
| $328 |
| $342 |
| $320 |
| $223 |
| $243 |
| 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $17,500 | $22,500 | $10,000 | $47,448 | $40,000 | $11,400 | $41,225 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,000 | $25,000 | $4,000 | $8,525 | $10,000 | $24,814 | $14,936 | 5% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $15,000 | $4,000 | $8,000 | $4,310 | $10,000 | $5,566 | $14,500 | 5% |
| 622E41000 PORTABLE BARRIER, 32" | 620 FT | $24.00 | $20.00 | $50.00 | $22.00 | $21.00 | $24.38 | $22.50 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $8,000 | $15,500 | $11,500 | $30,000 | $60,036 | $26,874 | 3% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 2 EACH | $2,785 | $1,900 | $2,200 | $2,690 | $2,300 | $1,900 | $2,000 | 2% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $750 | $700 | $1,000 | $1,720 | $1,600 | $1,600 | $1,649 | 1% |
| 621E00100 RPM | 22 EACH | $140 | $140 | $140 | $151 | $140 | $140 | $120 | 1% |
| 659E00541 SEEDING AND MULCHING, CLASS 3C, AS PER PLAN | 3,355 SY | $0.91 | $2.50 | $1.40 | $1.85 | $1.40 | $1.75 | $1.50 | 1% |
| 617E10100 COMPACTED AGGREGATE | 32 CY | $90.00 | $100 | $116 | $95.00 | $90.00 | $71.05 | $87.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,250 | $18,500 | $3,000 | $2,535 | $4,000 | $11,000 | $12,000 | 1% |
| 208E12000 BLASTING CONSULTANT | 1 LS | $1,500 | $1.00 | $4,500 | $5,300 | $5,500 | $4,500 | $2,577 | 0% |
| 408E10000 PRIME COAT | 152 GAL | $8.75 | $8.75 | $6.50 | $4.31 | $7.00 | $8.75 | $9.50 | 0% |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.16 MILE | $8,250 | $1,400 | $8,250 | $8,875 | $8,250 | $8,250 | $9,400 | 0% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.32 MILE | $3,250 | $3,400 | $3,250 | $3,498 | $3,250 | $3,250 | $3,000 | 0% |
| 642E00300 CENTER LINE, TYPE 1 | 0.16 MILE | $5,675 | $6,000 | $5,675 | $6,100 | $5,675 | $5,675 | $5,849 | 0% |
| $625 |
| $1.00 |
| $800 |
| $5,300 |
| $1,500 |
| $2,200 |
| $3,092 |
| 208E14000 VIBRATION CONTROL AND MONITORING | 1 LS | $625 | $1.00 | $800 | $5,300 | $1,500 | $1,000 | $3,092 |
| 659E20000 COMMERCIAL FERTILIZER | 0.5 TON | $605 | $605 | $605 | $484 | $605 | $450 | $624 |
| 659E31000 LIME | 0.7 ACRE | $70.00 | $70.00 | $70.00 | $80.00 | $70.00 | $75.00 | $72.00 |
| 659E35000 WATER | 18.2 MGAL | $1.00 | $1.00 | $1.00 | $6.45 | $1.00 | $6.00 | $1.00 |
| 407E20000 NON-TRACKING TACK COAT | 155 GAL | $3.25 | $3.25 | $8.00 | $5.25 | $7.00 | $3.25 | $3.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 22 EACH | $10.00 | $1.00 | $20.00 | $12.75 | $25.00 | $7.50 | $9.00 |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $525 | $2,000 | $24,000 | $26,900 | $2,500 | $5,597 | $5,514 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 13 EACH | $8.00 | $33.50 | $28.00 | $44.00 | $5.00 | $20.00 | $12.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 13 EACH | $12.00 | $36.50 | $36.00 | $40.00 | $5.00 | $20.00 | $15.00 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 22 FT | $14.00 | $15.00 | $14.00 | $15.00 | $14.00 | $14.00 | $5.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E10000 EXCAVATION | 5,874 CY | $23.5 | $138k | 45% |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 1 EACH | $45,000 | $45k | 15% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 81 CY | $222.5 | $18k | 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $17,500 | $18k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,000 | $15k | 5% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $15,000 | $15k | 5% |
| 622E41000 PORTABLE BARRIER, 32" | 620 FT | $24 | $15k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 3% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 2 EACH | $2,785 | $6k | 2% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1 | $5k | 2% |