LIC-SR 13-07.82
LIC County · est $0.7M
Bid dateThursday, April 23—
LIC County · est $0.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1George J Igel & CO INC | R2Shelly & Sands INC | R3Alan Stone CO INC | R4Complete General Construction Company | R5Ohio-west Virginia Excavating CO | R6Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 440 FT | $190 | $160 | $150 | $275 | $139 | $249 | 16% |
| 530E00400 SPECIAL - STRUCTURES, PRECAST CONCRETE LAGGING NO. | 134 EACH | $615 | $700 | $640 | $740 | $821 | $912 | 16% |
| 203E10000 EXCAVATION | 2,719 CY | $26.00 | $43.50 |
| Item | Quantity | R1George J Igel & CO INC | R2Shelly & Sands INC | R3Alan Stone CO INC | R4Complete General Construction Company | R5Ohio-west Virginia Excavating CO | R6Sunesis Construction CO |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,500 | $6,500 | $15,000 | $25,000 | $11,827 | $9,645 |
| 203E20000 EMBANKMENT | 12 CY | $145 | $40.00 | $18.00 | $60.00 | $65.26 | $12.45 |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 10 CY | $70.00 | $75.00 | $230 | $90.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $42.00 |
| $35.00 |
| $44.01 |
| $61.85 |
| 13% |
| 507E00400 STEEL PILES, MISC.: W24X94 SOLDIER PILE | 1,052 FT | $58.50 | $44.00 | $45.00 | $70.00 | $59.58 | $53.49 | 12% |
| 518E21201 POROUS BACKFILL WITH GEOTEXTILE FABRIC, AS PER PLA | 459 CY | $75.00 | $90.00 | $75.00 | $90.00 | $115 | $106 | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 157 CY | $190 | $173 | $230 | $173 | $231 | $173 | 6% |
| 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA | 380 FT | $62.00 | $120 | $160 | $75.00 | $185 | $140 | 4% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 74 CY | $300 | $250 | $260 | $250 | $265 | $250 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $55,000 | $20,000 | $19,251 | $82,035 | 4% |
| 503E21105 UNCLASSIFIED EXCAVATION, INCLUDING ROCK, AS PER PL | 506 CY | $38.00 | $50.00 | $33.00 | $40.00 | $47.38 | $118 | 4% |
| 204E13000 EXCAVATION OF SUBGRADE | 454 CY | $37.00 | $40.00 | $29.00 | $20.00 | $26.40 | $61.25 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.25") | 2,121 SY | $5.00 | $3.85 | $6.00 | $3.85 | $7.69 | $4.10 | 2% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $10,000 | $11,000 | $12,000 | $5,000 | $11,919 | $4,450 | 2% |
| 304E20000 AGGREGATE BASE | 109 CY | $90.00 | $100 | $72.00 | $45.00 | $168 | $117 | 2% |
| 530E00400 SPECIAL - STRUCTURES, PRECAST CONCRETE LAGGING NO. | 13 EACH | $550 | $675 | $670 | $760 | $536 | $308 | 1% |
| 204E20000 EMBANKMENT | 344 CY | $19.00 | $10.00 | $9.00 | $20.00 | $37.29 | $52.33 | 1% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 15 CY | $400 | $525 | $240 | $525 | $333 | $525 | 1% |
| 614E12421 DETOUR SIGNING, AS PER PLAN | 1 LS | $5,500 | $5,500 | $5,600 | $9,500 | $5,959 | $3,863 | 1% |
| 644E00104 EDGE LINE, 6" | 1.22 MILE | $4,250 | $4,198 | $4,500 | $4,198 | $5,500 | $6,900 | 1% |
| 606E26151 ANCHOR ASSEMBLY, MGS TYPE E, AS PER PLAN (NCHRP350 | 1 EACH | $5,150 | $4,975 | $5,300 | $4,975 | $6,820 | $7,226 | 1% |
| $78.31 |
| $90.55 |
| 204E10000 SUBGRADE COMPACTION | 688 SY | $2.90 | $5.00 | $3.00 | $6.50 | $4.58 | $12.40 |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 37.5 FT | $75.00 | $70.00 | $74.00 | $69.60 | $99.32 | $118 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 1 EACH | $5,000 | $4,780 | $5,100 | $4,780 | $8,608 | $10,002 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 1 EACH | $4,000 | $5,000 | $5,400 | $7,500 | $5,297 | $4,000 |
| 623E40500 REFERENCE MONUMENT | 4 EACH | $400 | $1,000 | $1,500 | $1,000 | $493 | $257 |
| 659E00530 SEEDING AND MULCHING, CLASS 3B | 2,270 SY | $1.40 | $0.80 | $3.00 | $1.40 | $4.30 | $2.63 |
| 659E20000 COMMERCIAL FERTILIZER | 0.31 TON | $610 | $660 | $570 | $610 | $2,949 | $500 |
| 659E31000 LIME | 0.47 ACRE | $70.00 | $155 | $84.00 | $70.00 | $2,621 | $200 |
| 659E35000 WATER | 13 MGAL | $1.00 | $1.00 | $2.00 | $1.00 | $620 | $1.00 |
| 671E15000 EROSION CONTROL MAT, TYPE A | 2,270 SY | $2.10 | $2.25 | $4.00 | $2.10 | $1.68 | $2.35 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 518E40001 6" PERFORATED CORRUGATED PLASTIC PIPE, AS PER PLAN | 400 FT | $4.00 | $5.00 | $7.00 | $15.00 | $8.94 | $5.18 |
| 601E28000 DUMPED ROCK FILL, TYPE D | 13 CY | $120 | $55.00 | $130 | $65.00 | $184 | $82.84 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $265 | $250 | $330 | $500 | $271 | $268 |
| 407E20000 NON-TRACKING TACK COAT | 179 GAL | $6.25 | $3.25 | $11.00 | $3.25 | $18.56 | $3.25 |
| 621E00100 RPM | 9 EACH | $330 | $330 | $430 | $330 | $437 | $387 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 9 EACH | $21.00 | $10.00 | $28.00 | $20.00 | $33.01 | $20.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 7 EACH | $8.50 | $8.00 | $9.00 | $8.00 | $17.22 | $13.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 3 EACH | $8.00 | $8.00 | $9.00 | $8.00 | $17.22 | $13.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 26 FT | $17.00 | $17.50 | $19.00 | $17.50 | $31.78 | $24.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $50.00 | $45.00 | $48.00 | $45.00 | $92.70 | $70.00 |
| 630E80100 SIGN, FLAT SHEET | 12.5 SF | $27.50 | $24.00 | $26.00 | $24.00 | $39.73 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $12.00 | $10.00 | $11.00 | $10.00 | $33.11 | $25.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $14.00 | $15.00 | $11.00 | $15.00 | $33.11 | $25.00 |
| 644E00300 CENTER LINE | 0.61 MILE | $5,300 | $5,350 | $5,700 | $5,350 | $10,999 | $9,000 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $700 | $900 | $900 | $1,500 | $1,986 | $850 |
| 516E14000 PREFORMED EXPANSION JOINT FILLER, MISC.: 7/8" THIC | 1,101 SF | $2.35 | $2.50 | $2.00 | $6.00 | $4.06 | $4.79 |
| 530E00400 SPECIAL - STRUCTURES, PRECAST CONCRETE LAGGING NO. | 6 EACH | $440 | $650 | $680 | $1,050 | $269 | $308 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,725 | $4,644 | $4,500 | $8,000 | $9,753 | $5,801 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $4,000 | $11,000 | $6,000 | $4,900 | $4,040 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 440 FT | $190 | $84k | 14% |
| 530E00400 SPECIAL - STRUCTURES, PRECAST CONCRETE LAGGING NO. | 134 EACH | $615 | $82k | 14% |
| 203E10000 EXCAVATION | 2,719 CY | $26 | $71k | 12% |
| 507E00400 STEEL PILES, MISC.: W24X94 SOLDIER PILE | 1,052 FT | $58.5 | $62k | 10% |
| 518E21201 POROUS BACKFILL WITH GEOTEXTILE FABRIC, AS PER PLA | 459 CY | $75 | $34k | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 157 CY | $190 | $30k | 5% |
| 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA | 380 FT | $62 | $24k | 4% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 74 CY | $300 | $22k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 3% |
| 503E21105 UNCLASSIFIED EXCAVATION, INCLUDING ROCK, AS PER PL | 506 CY | $38 | $19k | 3% |