PIK-SR 32-12.54 Landslide
PIK County · est $0.4M
Bid dateThursday, May 7—
PIK County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 13 more items below.
| Item | Quantity | R1Alan Stone CO INC | R2George J Igel & CO INC | R3Complete General Construction Company | R4Shelly & Sands INC | R5D G M INC | R6R C Construction Company And Son INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 1,672 FT | $37.00 | $47.00 | $49.00 | $67.00 | $50.00 | $125 | 21% |
| 507E00400 STEEL PILES, MISC.: STEEL PILES W14X82, AS PER PLA | 1,514 FT | $34.00 | $44.00 | $54.00 | $39.00 | $50.00 | $45.00 | 17% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 540 FT | $72.00 | $60.00 |
| Item | Quantity | R1Alan Stone CO INC | R2George J Igel & CO INC | R3Complete General Construction Company | R4Shelly & Sands INC | R5D G M INC | R6R C Construction Company And Son INC |
|---|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 213 FT | $3.00 | $7.75 | $2.00 | $5.00 | $1.00 | $5.00 |
| 203E20000 EMBANKMENT | 6 CY | $44.00 | $80.00 | $20.00 | $55.00 | $50.00 | $20.00 |
| 209E70000 BORROW | 33 CY | $8.00 | $45.00 | $45.00 | $17.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $45.00 |
| $85.50 |
| $175 |
| $125 |
| 13% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG SHAFT, 24" DIAMETER, U | 1,330 FT | $29.00 | $44.00 | $59.00 | $57.00 | $50.00 | $100 | 13% |
| 624E10000 MOBILIZATION | 1 LS | $17,000 | $10,000 | $10,000 | $10,000 | $6,000 | $15,000 | 6% |
| 507E00400 STEEL PILES, MISC.: STEEL PILES W16X57, AS PER PLA | 671 FT | $24.00 | $35.00 | $50.00 | $35.00 | $40.00 | $35.00 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,400 | $11,000 | $7,000 | $9,700 | $20,000 | $35,000 | 5% |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (16 CY | $830 | $608 | $786 | $675 | $850 | $575 | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 390 FT | $21.00 | $32.00 | $20.00 | $30.00 | $20.00 | $25.00 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 212.5 FT | $35.00 | $26.40 | $26.40 | $32.50 | $30.00 | $35.00 | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $69.00 | $80.00 | $80.00 | $65.00 | $30.00 | $35.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,500 | $3,000 | $3,500 | $3,404 | $18,000 | $18,000 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $6,900 | $2,000 | $7,000 | $4,000 | $12,500 | 1% |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.32 MILE | $10,000 | $9,500 | $9,500 | $9,500 | $10,000 | $12,500 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $2,900 | $5,000 | $2,500 | $11,000 | $3,000 | 1% |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 1 EACH | $2,500 | $2,500 | $3,575 | $2,350 | $2,000 | $2,500 | 1% |
| 659E00300 TOPSOIL | 28 CY | $52.00 | $57.00 | $20.00 | $70.00 | $15.00 | $50.00 | 0% |
| 614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I | 720 FT | $2.00 | $1.32 | $1.32 | $1.50 | $1.35 | $5.00 | 0% |
| 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 2 STA | $680 | $910 | $2,000 | $1,500 | $1,500 | $1,500 | 0% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.32 MILE | $3,500 | $3,250 | $3,250 | $3,250 | $3,500 | $12,500 | 0% |
| $70.00 |
| $20.00 |
| 659E10000 SEEDING AND MULCHING | 252 SY | $4.00 | $9.50 | $9.50 | $8.00 | $7.00 | $20.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 13 SY | $16.00 | $9.50 | $9.50 | $0.70 | $0.05 | $0.20 |
| 659E20000 COMMERCIAL FERTILIZER | 0.03 TON | $3,500 | $605 | $605 | $758 | $650 | $1,200 |
| 659E31000 LIME | 0.05 ACRE | $840 | $70.00 | $70.00 | $160 | $80.00 | $800 |
| 659E35000 WATER | 1 MGAL | $21.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 (ONE-WAY) | 3 EACH | $9.00 | $8.00 | $8.00 | $10.00 | $15.00 | $20.00 |
| 642E00204 LANE LINE, 6", TYPE 1 | 0.32 MILE | $3,200 | $3,000 | $3,000 | $3,000 | $3,500 | $12,500 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE-WAY) | 9 EACH | $38.00 | $20.00 | $36.00 | $7.00 | $15.00 | $20.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 9 EACH | $42.00 | $25.00 | $40.00 | $13.00 | $15.00 | $20.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 1,672 FT | $37 | $62k | 21% |
| 507E00400 STEEL PILES, MISC.: STEEL PILES W14X82, AS PER PLA | 1,514 FT | $34 | $51k | 17% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 540 FT | $72 | $39k | 13% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG SHAFT, 24" DIAMETER, U | 1,330 FT | $29 | $39k | 13% |
| 624E10000 MOBILIZATION | 1 LS | $17,000 | $17k | 6% |
| 507E00400 STEEL PILES, MISC.: STEEL PILES W16X57, AS PER PLA | 671 FT | $24 | $16k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,400 | $15k | 5% |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (16 CY | $830 | $13k | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 390 FT | $21 | $8k | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 212.5 FT | $35 | $7k | 2% |