HOL-SR 557-06.90
HOL County · est $0.3M
Bid dateThursday, October 1—
HOL County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 32 more items below.
| Item | Quantity | R1Adena Corporation | R2Tucson INC | R3Mason Dixon Energy Services LLC | R4Buds INC | R5Dennison Bridge INC | R6Glenn O Hawbaker INC | R7Eclipse CO LLC | R8Rudzik Excavating INC | R9Lockhart Concrete CO | R10Mike Pusateri Excavating INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 209 SY | $96.31 | $70.00 | $65.00 | $184 | $80.00 | $15.00 | $60.00 | $75.00 | $100 | $94.08 | 10% |
| 301E46000 |
| Item | Quantity | R1Adena Corporation | R2Tucson INC | R3Mason Dixon Energy Services LLC | R4Buds INC | R5Dennison Bridge INC | R6Glenn O Hawbaker INC | R7Eclipse CO LLC | R8Rudzik Excavating INC | R9Lockhart Concrete CO | R10Mike Pusateri Excavating INC |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 685 FT | $2.21 | $3.00 | $9.00 | $2.00 | $2.00 | $4.50 | $3.50 | $2.50 | $3.00 | $2.07 |
| 202E75000 FENCE REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 105 CY |
| $186 |
| $229 |
| $270 |
| $250 |
| $280 |
| $320 |
| $223 |
| $227 |
| $206 |
| $231 |
| 10% |
| 601E23000 ARTICULATING CONCRETE BLOCK REVETMENT SYSTEM, TYPE | 94 SY | $188 | $163 | $170 | $185 | $275 | $120 | $192 | $227 | $290 | $169 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $16,545 | $10,000 | $3,650 | $5,000 | $25,000 | $26,000 | $39,800 | $33,055 | $27,500 | $18,390 | 8% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 290 FT | $50.81 | $27.00 | $22.00 | $17.00 | $16.00 | $70.00 | $53.00 | $52.00 | $50.00 | $86.50 | 7% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 2 EACH | $7,006 | $16,740 | $11,900 | $7,000 | $1,500 | $30.00 | $3,305 | $2,750 | $5,000 | $30,000 | 7% |
| 615E10001 ROADS FOR MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $11,898 | $2,000 | $700 | $17,000 | $15,000 | $5,100 | $9,745 | $16,983 | $61,262 | $10,025 | 6% |
| 203E20000 EMBANKMENT | 1,613 CY | $7.22 | $13.00 | $18.50 | $23.50 | $18.00 | $18.00 | $12.50 | $23.00 | $20.00 | $35.80 | 6% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(NCHRP 350 or MASH 2016 | 4 EACH | $2,747 | $2,350 | $3,600 | $2,180 | $3,500 | $2,300 | $2,494 | $2,400 | $2,500 | $2,598 | 5% |
| 203E10000 EXCAVATION | 1,276 CY | $7.06 | $13.00 | $21.75 | $12.00 | $11.00 | $9.00 | $14.50 | $18.00 | $12.00 | $20.57 | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (20 CY | $408 | $235 | $300 | $250 | $400 | $350 | $229 | $465 | $422 | $473 | 4% |
| 606E15050 GUARDRAIL, TYPE MGS | 362.5 FT | $22.13 | $17.00 | $26.64 | $16.00 | $20.00 | $58.00 | $20.50 | $17.60 | $16.00 | $20.83 | 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 16 CY | $474 | $292 | $350 | $285 | $500 | $400 | $284 | $585 | $531 | $595 | 4% |
| 304E20000 AGGREGATE BASE | 73 CY | $82.79 | $90.00 | $93.00 | $95.00 | $130 | $110 | $69.50 | $75.00 | $55.00 | $94.00 | 3% |
| 202E23000 PAVEMENT REMOVED | 410 SY | $13.56 | $8.00 | $20.00 | $25.00 | $18.00 | $13.00 | $14.50 | $11.50 | $12.00 | $14.26 | 3% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) FOR 24 | 2 EACH | $2,779 | $2,106 | $2,200 | $2,200 | $2,000 | $2,600 | $1,995 | $2,645 | $2,000 | $2,352 | 3% |
| 601E26001 DUMPED ROCK FILL, TYPE B, AS PER PLAN | 46 CY | $101 | $100 | $70.00 | $108 | $110 | $130 | $107 | $108 | $120 | $138 | 2% |
| 621E00100 RPM | 24 EACH | $183 | $151 | $24.00 | $150 | $100 | $160 | $147 | $154 | $215 | $155 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,394 | $1,000 | $400 | $2,500 | $3,000 | $1,200 | $9,576 | $15,920 | $29,000 | $29,400 | 2% |
| 646E10200 CENTER LINE | 0.17 MILE | $24,657 | $14,040 | $26,000 | $13,000 | $13,000 | $9,000 | $13,650 | $14,300 | $19,000 | $21,090 | 2% |
| 603 FT |
| $0.25 |
| $2.00 |
| $3.00 |
| $3.00 |
| $4.00 |
| $1.75 |
| $2.50 |
| $1.25 |
| $2.00 |
| $3.85 |
| 204E10000 SUBGRADE COMPACTION | 451 SY | $0.33 | $2.00 | $4.00 | $3.00 | $3.00 | $1.50 | $1.00 | $2.00 | $2.50 | $2.50 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 100 FT | $25.33 | $18.00 | $32.50 | $17.00 | $25.00 | $58.00 | $23.00 | $18.70 | $19.00 | $22.85 |
| 601E28001 DUMPED ROCK FILL, TYPE D, AS PER PLAN | 41 CY | $82.16 | $95.00 | $65.00 | $110 | $110 | $120 | $114 | $102 | $110 | $137 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $193 | $65.00 | $140 | $25.00 | $50.00 | $175 | $210 | $50.00 | $150 | $200 |
| 659E00300 TOPSOIL | 139 CY | $21.34 | $38.00 | $32.00 | $25.00 | $20.00 | $72.00 | $46.50 | $25.00 | $62.00 | $68.20 |
| 659E10000 SEEDING AND MULCHING | 1,256 SY | $1.63 | $3.00 | $6.00 | $1.85 | $2.50 | $3.50 | $3.00 | $3.00 | $3.00 | $3.45 |
| 659E14000 REPAIR SEEDING AND MULCHING | 63 SY | $1.00 | $2.00 | $5.00 | $0.05 | $2.50 | $3.50 | $3.00 | $3.00 | $3.00 | $0.60 |
| 659E20000 COMMERCIAL FERTILIZER | 0.18 TON | $4,346 | $650 | $780 | $600 | $1,000 | $1,200 | $641 | $10.00 | $1,000 | $615 |
| 659E31000 LIME | 0.26 ACRE | $2,425 | $200 | $350 | $150 | $100 | $800 | $84.00 | $10.00 | $700 | $115 |
| 659E35000 WATER | 7 MGAL | $1.00 | $1.00 | $34.00 | $1.00 | $1.00 | $46.00 | $10.50 | $0.05 | $40.00 | $7.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 30 FT | $30.68 | $30.00 | $21.00 | $18.00 | $25.00 | $88.00 | $20.00 | $30.00 | $10.00 | $58.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 279 FT | $4.60 | $3.25 | $6.00 | $3.00 | $5.00 | $2.50 | $3.50 | $2.50 | $5.00 | $8.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" DEPTH | 55 SY | $42.45 | $33.00 | $20.00 | $35.00 | $25.00 | $23.00 | $31.50 | $85.00 | $76.00 | $83.60 |
| 407E10000 TACK COAT | 51 GAL | $9.34 | $6.00 | $20.00 | $5.00 | $10.00 | $24.00 | $5.50 | $3.60 | $3.25 | $3.64 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 24 EACH | $1.00 | $30.00 | $25.00 | $5.00 | $5.00 | $145 | $6.50 | $25.00 | $10.00 | $125 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 17 EACH | $18.85 | $9.00 | $13.00 | $8.00 | $15.00 | $60.00 | $9.00 | $9.35 | $15.00 | $12.30 |
| 646E10010 EDGE LINE, 6" | 0.25 MILE | $15,669 | $8,532 | $17,000 | $7,900 | $8,000 | $9,000 | $8,295 | $8,690 | $19,000 | $20,591 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $158 | $185 | $250 | $100 | $150 | $320 | $209 | $175 | $150 | $225 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, (BIDIRECTIONAL) | 6 EACH | $52.92 | $45.00 | $42.00 | $8.00 | $15.00 | $50.00 | $11.50 | $47.00 | $11.00 | $12.30 |
| 614E13312 BARRIER REFLECTOR, TYPE 2, (BIDIRECTIONAL) | 5 EACH | $67.13 | $56.00 | $52.00 | $8.00 | $15.00 | $60.00 | $11.50 | $58.00 | $11.00 | $12.30 |
| 614E13360 OBJECT MARKER, TWO WAY | 11 EACH | $22.32 | $35.00 | $32.00 | $18.00 | $25.00 | $38.00 | $16.00 | $36.00 | $15.00 | $17.50 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.18 MILE | $14,948 | $13,500 | $12,575 | $9,000 | $8,000 | $14,000 | $14,602 | $14,000 | $9,000 | $10,053 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.28 MILE | $11,121 | $8,400 | $7,725 | $6,800 | $6,000 | $9,000 | $11,021 | $8,500 | $7,000 | $7,453 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 33 FT | $12.77 | $13.00 | $12.00 | $12.00 | $10.00 | $14.00 | $6.50 | $14.00 | $3.90 | $4.29 |
| 616E10000 WATER | 10 MGAL | $1.00 | $1.00 | $60.00 | $1.00 | $10.00 | $38.00 | $19.00 | $0.05 | $50.00 | $2.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,481 | $4,000 | $5,758 | $5,000 | $3,500 | $600 | $11,937 | $3,550 | $5,900 | $5,971 |
| 619E16000 FIELD OFFICE, TYPE A | 5 MNTH | $292 | $500 | $300 | $200 | $500 | $1,300 | $750 | $700 | $500 | $1,800 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,550 | $1,500 | $13,919 | $4,500 | $3,000 | $5,800 | $11,500 | $1,250 | $9,700 | $6,145 |
| 624E10000 MOBILIZATION | 1 LS | $2,335 | $10,000 | $5,000 | $14,000 | $15,000 | $8,000 | $18,500 | $17,350 | $20,000 | $31,875 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 209 SY | $96.31 | $20k | 8% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 105 CY | $185.92 | $20k | 8% |
| 601E23000 ARTICULATING CONCRETE BLOCK REVETMENT SYSTEM, TYPE | 94 SY | $187.78 | $18k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $16,545 | $17k | 7% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 290 FT | $50.81 | $15k | 6% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 2 EACH | $7,006 | $14k | 6% |
| 615E10001 ROADS FOR MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $11,898 | $12k | 5% |
| 203E20000 EMBANKMENT | 1,613 CY | $7.22 | $12k | 5% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(NCHRP 350 or MASH 2016 | 4 EACH | $2,747 | $11k | 4% |
| 203E10000 EXCAVATION | 1,276 CY | $7.06 | $9k | 4% |