MOT-IR 75-09.53
MOT County · est $0.4M
Bid dateThursday, December 3—
MOT County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 86 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Sunesis Construction CO | R3Eagle Bridge CO | R4L J Deweese CO INC | R5John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|
| 452E14010 10" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 824 SY | $75.00 | $91.40 | $97.50 | $125 | $81.49 | 19% |
| 442E10500 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 229 CY | $206 | $206 | $206 | $210 | $404 | 15% |
| 304E20000 AGGREGATE BASE | 251 CY | $86.00 | $63.51 | $67.00 | $65.00 | $90.70 | 7% |
| Item | Quantity | R1Complete General Construction Company | R2Sunesis Construction CO | R3Eagle Bridge CO | R4L J Deweese CO INC | R5John R Jurgensen Company |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $2,678 | $2,500 | $15,500 | $605 |
| 202E30800 TRAFFIC ISLAND REMOVED | 114 SY | $28.00 | $18.46 | $25.00 | $9.00 | $37.66 |
| 202E32000 CURB REMOVED | 83 FT | $9.00 | $9.55 | $5.00 | $10.00 | $21.52 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 15 FT | $48.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 609E58000 9" CONCRETE TRAFFIC ISLAND |
| 267 SY |
| $78.00 |
| $60.77 |
| $90.00 |
| $125 |
| $81.49 |
| 6% |
| 809E69000 ADVANCE RADAR DETECTION | 3 EACH | $6,900 | $7,807 | $7,900 | $7,850 | $7,807 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $19,000 | $12,340 | $16,500 | $38,000 | $29,157 | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (DEPTH = 1.25") | 6,589 SY | $2.55 | $2.55 | $2.55 | $2.65 | $6.05 | 5% |
| 611E05900 15" CONDUIT, TYPE B | 83 FT | $152 | $114 | $115 | $100 | $178 | 4% |
| 632E80302 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 3 | 2 EACH | $6,000 | $5,846 | $5,100 | $6,000 | $5,846 | 4% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $11,000 | $11,359 | $10,000 | $11,500 | $11,359 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $10,000 | $6,075 | $10,000 | $6,250 | $6,075 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $26,545 | $10,000 | $5,500 | $20,000 | 3% |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 3 EACH | $3,000 | $4,893 | $6,100 | $5,000 | $4,893 | 3% |
| 632E80502 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 11 | 1 EACH | $9,000 | $10,695 | $9,700 | $10,750 | $10,695 | 3% |
| 202E23000 PAVEMENT REMOVED | 647 SY | $12.00 | $15.38 | $25.00 | $9.00 | $26.51 | 2% |
| 203E10000 EXCAVATION | 159 CY | $45.00 | $11.01 | $45.00 | $15.00 | $80.00 | 2% |
| 809E69100 STOP LINE RADAR DETECTION | 1 EACH | $7,000 | $7,462 | $8,200 | $7,500 | $7,462 | 2% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 7 EACH | $960 | $1,061 | $1,250 | $1,075 | $1,061 | 2% |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $6,500 | $4,190 | $1,912 | $4,200 | $4,190 | 2% |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 3" | 122 FT | $50.00 | $51.35 | $36.00 | $52.00 | $51.35 | 2% |
| $10.36 |
| $12.00 |
| $20.00 |
| $90.57 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $750 | $268 | $250 | $400 | $1,155 |
| 202E98100 REMOVAL MISC.: SIGNAL FOUNDATION | 1 EACH | $530 | $374 | $1,250 | $400 | $1,103 |
| 203E20000 EMBANKMENT | 68 CY | $15.00 | $34.01 | $45.00 | $15.00 | $73.00 |
| 204E10000 SUBGRADE COMPACTION | 1,136 SY | $5.00 | $2.85 | $4.00 | $1.00 | $3.60 |
| 204E13000 EXCAVATION OF SUBGRADE | 20 CY | $62.00 | $53.32 | $30.00 | $25.00 | $69.46 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 20 CY | $65.00 | $58.59 | $60.00 | $60.00 | $92.43 |
| 204E45000 PROOF ROLLING | 1 HOUR | $250 | $442 | $125 | $225 | $246 |
| 659E00300 TOPSOIL | 58 CY | $58.00 | $41.11 | $50.00 | $70.00 | $133 |
| 659E10000 SEEDING AND MULCHING | 520 SY | $5.45 | $6.01 | $6.00 | $3.00 | $5.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 26 SY | $0.85 | $1.00 | $3.00 | $7.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.07 TON | $680 | $500 | $1,250 | $600 | $500 |
| 659E31000 LIME | 0.11 ACRE | $30.00 | $200 | $10.00 | $500 | $200 |
| 659E35000 WATER | 3 MGAL | $1.00 | $1.00 | $10.00 | $10.00 | $1.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS | 159 FT | $32.00 | $13.42 | $20.00 | $20.00 | $30.71 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 10 FT | $55.00 | $25.21 | $25.00 | $20.00 | $59.01 |
| 611E98151 CATCH BASIN, NO. 3, AS PER PLAN | 1 EACH | $3,800 | $4,000 | $4,000 | $4,000 | $5,209 |
| 611E98370 CATCH BASIN, NO. 6 | 1 EACH | $4,200 | $2,566 | $3,250 | $4,000 | $3,212 |
| 407E20000 NON-TRACKING TACK COAT | 560 GAL | $3.00 | $3.00 | $3.00 | $3.00 | $5.00 |
| 609E26000 CURB, TYPE 6 | 10 FT | $63.00 | $122 | $100 | $60.00 | $33.29 |
| 617E10100 COMPACTED AGGREGATE | 4 CY | $72.00 | $123 | $95.00 | $100 | $417 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 1 EACH | $275 | $350 | $250 | $250 | $1,593 |
| 621E00100 RPM | 72 EACH | $45.30 | $51.75 | $51.75 | $52.00 | $51.75 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 32 EACH | $12.00 | $6.51 | $10.00 | $15.00 | $26.62 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 274 FT | $14.50 | $13.00 | $13.00 | $10.00 | $9.50 |
| 630E08600 SIGN POST REFLECTOR | 14 EACH | $45.00 | $50.00 | $50.00 | $39.00 | $38.50 |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 2 EACH | $365 | $300 | $300 | $310 | $305 |
| 630E80100 SIGN, FLAT SHEET | 207 SF | $16.00 | $25.00 | $25.00 | $17.00 | $16.75 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 19 EACH | $10.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 12 EACH | $15.00 | $25.00 | $25.00 | $30.00 | $30.00 |
| 644E00104 EDGE LINE, 6" | 0.46 MILE | $2,952 | $6,670 | $6,670 | $6,700 | $6,670 |
| 644E00200 LANE LINE, 4" | 0.05 MILE | $1,476 | $4,540 | $4,540 | $4,600 | $4,540 |
| 644E00204 LANE LINE, 6" | 0.14 MILE | $1,476 | $4,755 | $4,755 | $4,800 | $4,755 |
| 644E00300 CENTER LINE | 0.12 MILE | $5,904 | $7,385 | $7,385 | $7,400 | $7,385 |
| 644E00400 CHANNELIZING LINE, 8" | 136 FT | $2.00 | $3.60 | $3.60 | $3.65 | $3.60 |
| 644E00500 STOP LINE | 40 FT | $6.75 | $7.10 | $7.10 | $7.20 | $7.10 |
| 644E01300 LANE ARROW | 6 EACH | $85.00 | $125 | $125 | $130 | $125 |
| 644E01360 WRONG WAY ARROW | 2 EACH | $330 | $200 | $200 | $210 | $200 |
| 644E01510 DOTTED LINE, 6" | 270 FT | $2.00 | $3.55 | $3.55 | $3.40 | $3.55 |
| 644E20800 YIELD LINE | 32 FT | $40.25 | $12.45 | $12.45 | $13.00 | $12.45 |
| 646E10010 EDGE LINE, 6" | 0.04 MILE | $56,050 | $27,330 | $27,330 | $28,000 | $27,330 |
| 646E10110 LANE LINE, 6" | 0.01 MILE | $28,850 | $26,385 | $26,385 | $27,000 | $26,385 |
| 646E10310 CHANNELIZING LINE, 12" | 168 FT | $5.90 | $2.50 | $2.50 | $2.60 | $2.50 |
| 646E10400 STOP LINE | 30 FT | $43.70 | $25.00 | $25.00 | $26.00 | $25.00 |
| 646E20300 LANE ARROW | 4 EACH | $320 | $500 | $500 | $510 | $500 |
| 646E20504 DOTTED LINE, 6" | 38 FT | $21.85 | $2.45 | $2.45 | $2.50 | $2.45 |
| 611E00400 4" CONDUIT, TYPE E | 40 FT | $15.00 | $15.00 | $2.06 | $15.00 | $15.00 |
| 625E25400 CONDUIT, 2", 725.04 | 129 FT | $20.00 | $18.65 | $17.00 | $19.00 | $18.65 |
| 625E25500 CONDUIT, 3", 725.04 | 13 FT | $27.50 | $53.15 | $40.00 | $54.00 | $53.15 |
| 625E29000 TRENCH | 142 FT | $8.75 | $14.50 | $12.00 | $15.00 | $14.50 |
| 625E30700 PULL BOX, 725.08, 18" | 3 EACH | $910 | $799 | $875 | $800 | $799 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,125 | $935 | $1,100 | $950 | $935 |
| 625E31510 PULL BOX REMOVED | 3 EACH | $275 | $221 | $175 | $225 | $221 |
| 625E32000 GROUND ROD | 5 EACH | $250 | $231 | $265 | $235 | $231 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 142 FT | $1.00 | $0.15 | $0.30 | $0.15 | $0.15 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 7 EACH | $50.00 | $41.50 | $40.00 | $42.00 | $41.50 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 525 FT | $2.75 | $2.75 | $3.00 | $2.80 | $2.75 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 39 FT | $5.50 | $4.60 | $5.50 | $4.65 | $4.60 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 29 FT | $5.50 | $4.60 | $5.50 | $4.65 | $4.60 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $1,750 | $2,172 | $1,250 | $2,200 | $2,172 |
| 632E77233 SIGNAL SUPPORT, MECHANICAL DAMPER FOR TC-81.21 MAS | 1 EACH | $1,000 | $1,118 | $1,200 | $1,125 | $1,118 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $3,500 | $1,515 | $3,100 | $1,525 | $1,515 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 1 EACH | $1,000 | $626 | $400 | $630 | $626 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $5,000 | $5,622 | $5,650 | $5,650 | $5,622 |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 1 EACH | $5,000 | $5,047 | $4,900 | $5,050 | $5,047 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 10 CY | $78.95 | $91.45 | $83.83 | $75.00 | $187 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $81.00 | $65.00 | $100 | $80.00 | $122 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $290 | $437 | $500 | $200 | $362 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 3 SNMT | $1,200 | $900 | $995 | $925 | $900 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 0.05 MILE | $1,345 | $3,131 | $3,130 | $3,200 | $3,130 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 0.14 MILE | $1,345 | $3,150 | $3,150 | $3,200 | $3,150 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.15 MILE | $5,320 | $5,690 | $5,690 | $5,800 | $5,690 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.15 MILE | $5,320 | $3,425 | $3,425 | $3,500 | $3,425 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.12 MILE | $2,660 | $5,505 | $5,505 | $5,600 | $5,505 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.46 MILE | $2,660 | $3,330 | $3,330 | $3,400 | $3,330 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 136 FT | $1.00 | $0.55 | $0.55 | $0.60 | $0.55 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 270 FT | $1.00 | $0.50 | $0.50 | $0.55 | $0.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 40 FT | $3.50 | $2.50 | $2.50 | $2.60 | $2.50 |
| 616E10000 WATER | 1 MGAL | $2,000 | $11.92 | $10.00 | $55.00 | $812 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $2,500 | $5,844 | $6,000 | $4,000 | $4,071 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $3,293 | $6,500 | $6,000 | $3,718 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $3,920 | $10,000 | $5,000 | $8,606 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 452E14010 10" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 824 SY | $75 | $62k | 14% |
| 442E10500 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 229 CY | $206 | $47k | 10% |
| 304E20000 AGGREGATE BASE | 251 CY | $86 | $22k | 5% |
| 609E58000 9" CONCRETE TRAFFIC ISLAND | 267 SY | $78 | $21k | 5% |
| 809E69000 ADVANCE RADAR DETECTION | 3 EACH | $6,900 | $21k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $19,000 | $19k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (DEPTH = 1.25") | 6,589 SY | $2.55 | $17k | 4% |
| 611E05900 15" CONDUIT, TYPE B | 83 FT | $152 | $13k | 3% |
| 632E80302 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 3 | 2 EACH | $6,000 | $12k | 3% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $11,000 | $11k | 2% |