SCI-Riverfront Multi-Use Path
SCI County · est $0.7M
Bid dateThursday, December 17—
SCI County · est $0.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 65 more items below.
| Item | Quantity | R1Distel Construction INC | R2Axis Civil Construction LLC | R3Allard Excavation LLC | R4Skeens Excavating INC | R5Fillmore Construction | R6Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 716 CY | $194 | $155 | $161 | $215 | $164 | $175 | 26% |
| 609E26000 CURB, TYPE 6 | 2,110 FT | $28.50 | $24.00 | $31.00 | $40.00 | $30.00 | $29.25 | 11% |
| 608E10000 4" CONCRETE WALK | 5,353 SF | $8.00 | $5.80 | $6.25 |
| Item | Quantity | R1Distel Construction INC | R2Axis Civil Construction LLC | R3Allard Excavation LLC | R4Skeens Excavating INC | R5Fillmore Construction | R6Eclipse CO LLC |
|---|---|---|---|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $1,500 | $10,000 | $4,350 | $2,000 | $2,500 | $12,521 |
| 202E23000 PAVEMENT REMOVED, BRICK | 167 SY | $8.00 | $12.00 | $9.00 | $20.00 | $3.00 | $8.75 |
| 202E23000 PAVEMENT REMOVED, CONCRETE | 54 SY | $25.00 | $12.00 | $7.70 | $20.00 | $3.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $7.50 |
| $10.00 |
| $6.50 |
| 8% |
| 304E20000 AGGREGATE BASE | 645 CY | $50.00 | $75.00 | $44.75 | $70.00 | $50.00 | $54.75 | 6% |
| 203E20000 EMBANKMENT | 1,343 CY | $23.00 | $18.50 | $12.25 | $10.00 | $30.00 | $12.00 | 6% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (127 CY | $232 | $245 | $195 | $250 | $148 | $210 | 5% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $24,450 | $8,500 | $19,555 | $15,000 | $7,500 | $15,953 | 5% |
| 630E80100 SIGN, FLAT SHEET | 752 SF | $29.50 | $12.00 | $12.00 | $28.00 | $25.00 | $14.50 | 4% |
| 611E98371 CATCH BASIN, NO. 6, AS PER PLAN | 5 EACH | $3,785 | $4,500 | $2,398 | $1,800 | $5,000 | $3,121 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1-1/2" | 15,003 SY | $1.25 | $1.75 | $1.75 | $1.10 | $2.00 | $1.00 | 3% |
| 203E10000 EXCAVATION | 1,069 CY | $15.00 | $18.50 | $24.00 | $10.00 | $20.00 | $16.00 | 3% |
| 644E19000 SHARED LANE MARKING | 30 EACH | $443 | $265 | $265 | $290 | $375 | $276 | 2% |
| 659E10000 SEEDING AND MULCHING | 3,363 SY | $3.50 | $1.20 | $1.45 | $3.00 | $1.20 | $1.25 | 2% |
| 202E23000 PAVEMENT REMOVED, ASPHALT | 1,453 SY | $8.00 | $12.00 | $7.50 | $6.00 | $2.00 | $9.75 | 2% |
| 202E32000 CURB REMOVED | 1,927 FT | $6.00 | $7.00 | $6.00 | $8.00 | $5.00 | $4.75 | 2% |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 787 FT | $14.15 | $11.00 | $11.00 | $16.00 | $12.00 | $12.75 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $11,030 | $4,200 | $9,350 | $11,000 | $7,500 | $16,973 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,009 | $25,000 | $38,475 | $8,000 | $27,280 | $14,022 | 2% |
| 608E40000 CONCRETE STEPS, TYPE A | 55 FT | $200 | $90.00 | $208 | $200 | $50.00 | $86.50 | 2% |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 794 FT | $13.00 | $10.00 | $10.00 | $15.00 | $11.00 | $11.75 | 2% |
| $11.00 |
| 202E30000 WALK REMOVED | 7,969 SF | $1.25 | $2.20 | $1.90 | $1.80 | $2.50 | $2.00 |
| 202E30204 STEPS REMOVED | 1 LS | $500 | $1,500 | $290 | $1,200 | $500 | $2,042 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 135 FT | $20.00 | $35.00 | $26.50 | $12.00 | $10.00 | $15.75 |
| 202E38000 GUARDRAIL REMOVED | 26 FT | $20.00 | $3.00 | $5.00 | $10.00 | $10.00 | $45.00 |
| 202E58100 CATCH BASIN REMOVED | 7 EACH | $300 | $900 | $582 | $380 | $200 | $426 |
| 202E75000 FENCE REMOVED | 14 FT | $50.00 | $10.00 | $7.75 | $20.00 | $10.00 | $46.75 |
| 204E10000 SUBGRADE COMPACTION | 3,571 SY | $1.50 | $2.00 | $2.75 | $0.25 | $3.00 | $2.25 |
| 204E13000 EXCAVATION OF SUBGRADE | 200 CY | $20.00 | $18.50 | $11.50 | $15.00 | $20.00 | $27.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 200 CY | $15.00 | $75.00 | $50.00 | $60.00 | $80.00 | $55.00 |
| 204E45001 PROOF ROLLING, AS PER PLAN | 2 HOUR | $200 | $220 | $75.00 | $100 | $100 | $208 |
| 204E50000 GEOTEXTILE FABRIC | 500 SY | $2.00 | $2.00 | $1.00 | $2.50 | $4.00 | $1.00 |
| 204E51000 GEOGRID | 500 SY | $2.00 | $2.20 | $1.60 | $3.50 | $10.00 | $1.50 |
| 659E00300 TOPSOIL | 375 CY | $20.00 | $38.00 | $31.25 | $18.00 | $50.00 | $57.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 170 SY | $3.50 | $1.20 | $0.05 | $2.00 | $1.20 | $1.25 |
| 659E15000 INTER-SEEDING | 170 SY | $3.50 | $1.20 | $0.05 | $2.00 | $1.20 | $1.25 |
| 659E20000 COMMERCIAL FERTILIZER | 0.28 TON | $720 | $610 | $50.00 | $400 | $610 | $635 |
| 659E35000 WATER | 12 MGAL | $2.00 | $1.00 | $1.00 | $10.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 1,389 SY | $2.50 | $2.00 | $1.95 | $2.00 | $2.00 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,775 | $1,500 | $1,500 | $2,000 | $1,500 | $1,872 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $7,080 | $10,500 | $7,820 | $1,000 | $10,500 | $3,276 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $6,190 | $1,500 | $6,095 | $1,000 | $7,500 | $5,148 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E00900 6" CONDUIT, TYPE B | 100 FT | $30.00 | $8.00 | $46.00 | $35.00 | $20.00 | $24.75 |
| 611E01100 6" CONDUIT, TYPE C | 100 FT | $20.00 | $8.00 | $44.00 | $35.00 | $20.00 | $23.50 |
| 611E04400 12" CONDUIT, TYPE B | 50 FT | $100 | $12.00 | $70.00 | $50.00 | $100 | $79.75 |
| 611E04401 12" CONDUIT, TYPE B, AS PER PLAN | 35 FT | $100 | $65.00 | $159 | $65.00 | $100 | $115 |
| 611E04600 12" CONDUIT, TYPE C | 50 FT | $50.00 | $45.00 | $70.00 | $50.00 | $80.00 | $69.00 |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 2 EACH | $3,895 | $4,000 | $2,897 | $1,800 | $3,750 | $3,221 |
| 611E98645 CATCH BASIN GRATE, AS PER PLAN | 3 EACH | $1,092 | $400 | $308 | $300 | $2,500 | $218 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 38 EACH | $200 | $750 | $206 | $600 | $300 | $510 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 2 EACH | $1,500 | $3,500 | $1,012 | $3,000 | $1,000 | $1,155 |
| 407E10000 TACK COAT | 1,507 GAL | $4.75 | $2.00 | $1.85 | $2.00 | $3.00 | $4.25 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 117 SY | $80.00 | $90.00 | $33.05 | $100 | $70.00 | $84.00 |
| 608E52000 CURB RAMP | 732 SF | $12.00 | $7.00 | $7.00 | $15.00 | $14.00 | $14.75 |
| 608E53021 DETECTABLE WARNING, AS PER PLAN | 40 SF | $38.00 | $39.00 | $71.30 | $20.00 | $50.00 | $53.00 |
| 609E57000 8" CONCRETE TRAFFIC ISLAND | 13 SY | $750 | $120 | $31.85 | $500 | $70.00 | $182 |
| 638E00600 6" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 52, PUS | 74 FT | $135 | $160 | $171 | $110 | $200 | $104 |
| 638E10601 FIRE HYDRANT AND GATE VALVE REMOVED AND RESET, AS | 4 EACH | $1,000 | $3,800 | $3,500 | $1,150 | $2,500 | $1,031 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 29 EACH | $50.00 | $350 | $180 | $400 | $200 | $255 |
| 638E10900 SERVICE BOX ADJUSTED TO GRADE | 5 EACH | $100 | $350 | $350 | $1,100 | $350 | $255 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 18 EACH | $17.75 | $40.00 | $10.00 | $40.00 | $15.00 | $10.75 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 6 EACH | $76.75 | $70.00 | $75.00 | $80.00 | $65.00 | $80.25 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 18 EACH | $29.50 | $70.00 | $18.00 | $40.00 | $25.00 | $21.25 |
| 644E00100 EDGE LINE, 4" | 1.67 MILE | $4,378 | $2,928 | $2,928 | $3,300 | $3,710 | $3,045 |
| 644E00300 CENTER LINE | 1.28 MILE | $6,225 | $3,485 | $3,485 | $3,800 | $5,275 | $3,625 |
| 644E00500 STOP LINE | 170 FT | $6.00 | $6.25 | $6.25 | $8.00 | $5.00 | $6.50 |
| 644E00600 CROSSWALK LINE | 580 FT | $5.00 | $3.25 | $3.25 | $5.00 | $4.10 | $3.50 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 582 FT | $6.00 | $5.80 | $5.80 | $7.00 | $4.85 | $6.00 |
| 644E01200 PARKING LOT STALL MARKING | 2,483 FT | $1.75 | $1.70 | $1.70 | $2.50 | $1.35 | $1.75 |
| 644E01300 LANE ARROW | 55 EACH | $118 | $100 | $96.00 | $115 | $100 | $99.75 |
| 644E01500 DOTTED LINE, 4" | 213 FT | $2.00 | $2.20 | $2.20 | $3.50 | $1.45 | $2.25 |
| 644E01600 HANDICAP SYMBOL MARKING | 1 EACH | $120 | $98.00 | $98.00 | $115 | $100 | $102 |
| 644E01630 BIKE LANE SYMBOL MARKING | 20 EACH | $415 | $240 | $240 | $265 | $350 | $250 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 75 FT | $30.75 | $8.80 | $8.65 | $15.00 | $25.85 | $9.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 50 CY | $55.00 | $85.00 | $50.00 | $50.00 | $200 | $50.50 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $100 | $65.00 | $85.00 | $65.00 | $100 | $67.50 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $300 | $150 | $270 | $200 | $200 | $196 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 1.67 MILE | $1,528 | $1,295 | $1,295 | $1,500 | $1,295 | $1,503 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 170 FT | $13.00 | $11.00 | $11.00 | $15.00 | $11.00 | $2.50 |
| 616E10000 WATER | 50 MGAL | $5.00 | $1.23 | $1.00 | $10.00 | $1.00 | $16.75 |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $1,000 | $1,800 | $1,200 | $100 | $1,000 | $525 |
| 624E10001 MOBILIZATION, AS PER PLAN | 1 LS | $2,500 | $25,000 | $72,443 | $25,000 | $18,500 | $95,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 716 CY | $193.64 | $139k | 18% |
| 609E26000 CURB, TYPE 6 | 2,110 FT | $28.5 | $60k | 8% |
| 608E10000 4" CONCRETE WALK | 5,353 SF | $8 | $43k | 6% |
| 304E20000 AGGREGATE BASE | 645 CY | $50 | $32k | 4% |
| 203E20000 EMBANKMENT | 1,343 CY | $23 | $31k | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (127 CY | $232.25 | $29k | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $24,450 | $24k | 3% |
| 630E80100 SIGN, FLAT SHEET | 752 SF | $29.5 | $22k | 3% |
| 611E98371 CATCH BASIN, NO. 6, AS PER PLAN | 5 EACH | $3,785 | $19k | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1-1/2" | 15,003 SY | $1.25 | $19k | 2% |