MOE-SR 255-17.60
MOE County · est $0.3M
Bid dateThursday, February 27—
MOE County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 11 more items below.
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Alan Stone CO INC | R3Litman Excavating INC | R4Shelly & Sands INC | R5J & J Bridge Company INC | R6R C Construction Company And Son INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 1,290 FT | $95.00 | $66.00 | $112 | $103 | $114 | $150 | 40% |
| 507E00400 STEEL PILES, MISC.:SOLDIER PILES, W21X101 | 880 FT | $55.90 | $51.00 | $64.50 | $51.00 | $111 | $55.00 | 16% |
| 530E00400 SPECIAL - STRUCTURES PRE-CAST CONCRETE PANEL NO. 1 | 105 EACH | $221 | $220 |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Alan Stone CO INC | R3Litman Excavating INC | R4Shelly & Sands INC | R5J & J Bridge Company INC | R6R C Construction Company And Son INC |
|---|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 180 FT | $2.90 | $3.00 | $7.75 | $2.00 | $2.00 | $5.00 |
| 204E10000 SUBGRADE COMPACTION | 91 SY | $14.00 | $3.00 | $4.00 | $12.00 | $5.00 | $2.00 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 236 SY | $4.50 | $8.00 | $4.50 | $9.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $218 |
| $255 |
| $225 |
| $200 |
| 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $22,450 | $30,000 | $5,348 | $22,300 | $30,000 | $25,000 | 7% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $15,820 | $7,500 | $6,440 | $8,000 | $2,000 | $10,000 | 5% |
| 203E10000 EXCAVATION | 69 CY | $203 | $96.00 | $10.00 | $30.00 | $20.00 | $20.00 | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 40 CY | $287 | $560 | $518 | $525 | $350 | $475 | 4% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 66 CY | $128 | $170 | $80.00 | $280 | $190 | $225 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 180 FT | $27.95 | $28.00 | $19.67 | $26.50 | $25.00 | $35.00 | 2% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 64 SY | $74.00 | $150 | $137 | $90.00 | $90.00 | $150 | 2% |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 2 EACH | $2,360 | $2,600 | $9,172 | $2,460 | $3,500 | $2,500 | 2% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 8 CY | $580 | $570 | $300 | $450 | $450 | $425 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,570 | $2,000 | $6,400 | $2,705 | $15,000 | $16,500 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $4,365 | $21,600 | $16,000 | $10,000 | $12,000 | $12,500 | 1% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 13 CY | $287 | $840 | $690 | $800 | $350 | $400 | 1% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $2,265 | $9,000 | $3,500 | $8,500 | $2,000 | $10,000 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,150 | $2,000 | $3,000 | $6,500 | $5,000 | $2,500 | 1% |
| 304E20000 AGGREGATE BASE | 14 CY | $110 | $170 | $41.12 | $135 | $150 | $85.00 | 0% |
| 203E20000 EMBANKMENT | 39 CY | $39.00 | $18.00 | $12.00 | $20.00 | $20.00 | $20.00 | 0% |
| $3.00 |
| $5.00 |
| 407E20000 NON-TRACKING TACK COAT | 5 GAL | $150 | $5.00 | $28.75 | $4.00 | $3.00 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 BIDIRECTIONAL | 4 EACH | $8.00 | $8.00 | $78.20 | $7.50 | $20.00 | $25.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.15 MILE | $5,100 | $5,100 | $5,578 | $4,850 | $5,000 | $12,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.08 MILE | $9,200 | $9,300 | $10,120 | $8,800 | $7,500 | $12,500 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 137 FT | $9.00 | $9.00 | $9.00 | $3.00 | $10.00 | $25.00 |
| 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE | 10 FT | $15.50 | $36.00 | $18.00 | $30.00 | $20.00 | $25.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $220 | $340 | $249 | $400 | $250 | $275 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $845 | $4,800 | $2,500 | $5,500 | $1,000 | $12,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 1,290 FT | $95 | $123k | 39% |
| 507E00400 STEEL PILES, MISC.:SOLDIER PILES, W21X101 | 880 FT | $55.9 | $49k | 16% |
| 530E00400 SPECIAL - STRUCTURES PRE-CAST CONCRETE PANEL NO. 1 | 105 EACH | $221.2 | $23k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $22,450 | $22k | 7% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $15,820 | $16k | 5% |
| 203E10000 EXCAVATION | 69 CY | $203 | $14k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 40 CY | $287 | $11k | 4% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 66 CY | $128 | $8k | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 180 FT | $27.95 | $5k | 2% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 64 SY | $74 | $5k | 1% |