BEL-SR 9-11.72
BEL County · est $0.4M
Bid dateThursday, June 18—
BEL County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 14 more items below.
| Item | Quantity | R1Craig Edward Susany INC | R2Ohio-west Virginia Excavating CO | R3Dennison Bridge INC | R4Alan Stone CO INC | R5Shelly & Sands INC | R6Great Lakes Construction CO | R7Litman Excavating INC | R8R C Construction Company And Son INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: W18x76 STEEL BEAMS, FURNISHED | 1,740 FT | $35.00 | $37.50 | $40.00 | $39.50 | $39.00 | $40.00 | $48.58 | $50.00 | 16% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 231 CY | $243 | $180 | $250 | $272 |
| Item | Quantity | R1Craig Edward Susany INC | R2Ohio-west Virginia Excavating CO | R3Dennison Bridge INC | R4Alan Stone CO INC | R5Shelly & Sands INC | R6Great Lakes Construction CO | R7Litman Excavating INC | R8R C Construction Company And Son INC |
|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $2,100 | $1,000 | $3,200 | $5,500 | $7,500 | $6,500 | $2,500 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 49 FT | $10.00 | $29.00 | $10.00 | $156 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $217 |
| $217 |
| $660 |
| $385 |
| 15% |
| 524E94605 DRILLED SHAFTS, 30" DIAMETER INTO BEDROCK, AS PER | 650 FT | $73.00 | $66.00 | $105 | $94.50 | $150 | $115 | $100 | $125 | 12% |
| 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE | 956 FT | $48.00 | $48.00 | $75.00 | $70.00 | $67.00 | $100 | $75.00 | $125 | 12% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $38,000 | $40,000 | $45,000 | $60,000 | $48,560 | $60,750 | $13,000 | $45,000 | 10% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 30" DIAMETER, UN | 640 FT | $45.00 | $53.00 | $70.00 | $71.50 | $85.00 | $95.00 | $90.00 | $100 | 7% |
| 304E20000 AGGREGATE BASE | 217 CY | $80.00 | $95.00 | $100 | $86.00 | $90.00 | $115 | $81.00 | $110 | 4% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 245 SY | $65.00 | $115 | $35.00 | $90.50 | $105 | $85.00 | $60.00 | $150 | 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 31 CY | $415 | $270 | $455 | $520 | $415 | $415 | $495 | $475 | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (44 CY | $244 | $260 | $275 | $306 | $244 | $244 | $280 | $475 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $5,920 | $5,500 | $3,600 | $3,460 | $10,500 | $13,700 | $22,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $19,200 | $5,000 | $20,000 | $20,000 | $20,000 | $15,000 | $25,000 | 3% |
| 606E15151 GUARDRAIL, TYPE MGS HALF POST SPACING, AS PER PLAN | 350 FT | $26.00 | $28.00 | $29.00 | $32.50 | $25.80 | $25.80 | $25.00 | $45.00 | 2% |
| 202E23000 PAVEMENT REMOVED | 904 SY | $6.00 | $12.50 | $12.00 | $9.00 | $8.00 | $20.00 | $25.00 | $20.00 | 1% |
| 611E05700 15" CONDUIT, TYPE A | 50 FT | $100 | $169 | $200 | $255 | $225 | $100 | $155 | $175 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $850 | $6,000 | $5,600 | $6,500 | $10,500 | $5,000 | $15,000 | 1% |
| 621E00100 RPM | 9 EACH | $350 | $260 | $400 | $439 | $250 | $386 | $385 | $650 | 1% |
| 204E10000 SUBGRADE COMPACTION | 1,148 SY | $2.00 | $1.50 | $2.00 | $3.00 | $4.00 | $3.50 | $4.00 | $2.00 | 1% |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 329 SY | $4.00 | $3.00 | $6.00 | $6.50 | $10.00 | $9.00 | $5.00 | $10.00 | 0% |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 397 FT | $3.00 | $3.00 | $3.00 | $7.00 | $5.00 | $3.00 | $3.00 | $40.00 | 0% |
| $10.00 |
| $20.00 |
| $25.00 |
| $25.00 |
| 202E38000 GUARDRAIL REMOVED | 350 FT | $2.00 | $2.18 | $2.00 | $3.00 | $2.00 | $5.00 | $5.00 | $3.00 |
| 203E10000 EXCAVATION | 15 CY | $25.00 | $38.00 | $30.00 | $10.00 | $18.00 | $90.00 | $30.00 | $20.00 |
| 203E20000 EMBANKMENT | 41 CY | $25.00 | $43.00 | $40.00 | $12.00 | $25.00 | $30.00 | $38.00 | $20.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.27 CY | $2,000 | $600 | $1,500 | $4,074 | $2,500 | $2,000 | $2,500 | $1,200 |
| 407E10000 TACK COAT | 148 GAL | $2.00 | $3.00 | $2.00 | $2.50 | $2.00 | $2.00 | $27.50 | $10.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 102 GAL | $9.00 | $3.00 | $9.00 | $10.50 | $8.50 | $8.50 | $5.00 | $10.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 9 EACH | $5.00 | $54.00 | $5.00 | $32.50 | $20.00 | $15.00 | $60.00 | $20.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 8 EACH | $8.00 | $10.00 | $10.00 | $11.00 | $8.75 | $8.75 | $31.00 | $20.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.14 MILE | $4,500 | $4,800 | $6,000 | $5,500 | $4,400 | $11,710 | $4,900 | $12,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.07 MILE | $9,000 | $9,500 | $9,000 | $11,000 | $8,800 | $23,420 | $9,700 | $12,500 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1,000 | $950 | $100 | $1,100 | $750 | $1,500 | $12,000 | $12,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: W18x76 STEEL BEAMS, FURNISHED | 1,740 FT | $35 | $61k | 15% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 231 CY | $243 | $56k | 14% |
| 524E94605 DRILLED SHAFTS, 30" DIAMETER INTO BEDROCK, AS PER | 650 FT | $73 | $47k | 12% |
| 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE | 956 FT | $48 | $46k | 12% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $38,000 | $38k | 10% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 30" DIAMETER, UN | 640 FT | $45 | $29k | 7% |
| 304E20000 AGGREGATE BASE | 217 CY | $80 | $17k | 4% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 245 SY | $65 | $16k | 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 31 CY | $415 | $13k | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (44 CY | $244 | $11k | 3% |