HAS-SR 646-01.21
HAS County · est $0.2M
Bid dateThursday, November 5—
HAS County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 11 more items below.
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Tucson INC | R3Shelly & Sands INC | R4Nls Paving, INC | R5Dennison Bridge INC | R6Stanley Miller Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $40,000 | $40,000 | $27,723 | $36,000 | $35,000 | $36,389 | 28% |
| 203E20000 EMBANKMENT | 1,837 CY | $14.25 | $13.00 | $19.40 | $20.00 | $27.00 | $39.00 | 18% |
| 203E10000 EXCAVATION | 1,419 CY | $9.00 | $12.00 | $13.75 | $20.00 |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Tucson INC | R3Shelly & Sands INC | R4Nls Paving, INC | R5Dennison Bridge INC | R6Stanley Miller Construction Company |
|---|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 262.5 FT | $2.30 | $3.00 | $3.00 | $2.00 | $3.00 | $2.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E01500 6" CONDUIT, TYPE F, 707.33 (NON-PERFORATED), INCLU | 42 FT | $7.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $21.00 |
| $21.75 |
| 9% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 109 CY | $82.00 | $80.00 | $118 | $160 | $90.00 | $89.00 | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 34 CY | $215 | $345 | $500 | $300 | $400 | $334 | 5% |
| 606E15050 GUARDRAIL, TYPE MGS | 262.5 FT | $26.00 | $26.00 | $30.00 | $25.00 | $30.00 | $29.25 | 5% |
| 304E20000 AGGREGATE BASE | 53 CY | $98.00 | $90.00 | $99.00 | $100 | $130 | $140 | 4% |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 779 SY | $5.50 | $3.00 | $3.75 | $5.00 | $5.00 | $5.00 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,000 | $2,875 | $1,020 | $871 | $3,500 | $3,333 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $11,000 | $4,000 | $15,000 | $13,000 | $10,277 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,200 | $9,000 | $7,900 | $2,000 | $10,000 | $4,333 | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 11 CY | $275 | $658 | $900 | $650 | $900 | $723 | 2% |
| 621E00100 RPM | 6 EACH | $500 | $486 | $450 | $450 | $600 | $195 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (10 CY | $265 | $642 | $600 | $550 | $600 | $612 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $3,000 | $7,275 | $8,500 | $5,000 | $12,333 | 2% |
| 202E23000 PAVEMENT REMOVED | 185 SY | $13.00 | $20.00 | $13.50 | $5.00 | $18.00 | $14.00 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 119 SY | $18.00 | $38.00 | $27.50 | $30.00 | $35.00 | $33.00 | 2% |
| 204E10000 SUBGRADE COMPACTION | 264 SY | $6.00 | $2.00 | $7.25 | $3.00 | $5.00 | $1.00 | 1% |
| 611E01400 6" CONDUIT, TYPE E, 707.31 (PERFORATED) | 210 FT | $7.00 | $11.00 | $4.50 | $15.00 | $10.00 | $5.50 | 1% |
| 202E75000 FENCE REMOVED | 230 FT | $5.00 | $3.00 | $3.25 | $2.00 | $4.00 | $2.00 | 1% |
| $15.00 |
| $20.25 |
| $13.00 |
| $20.00 |
| $5.50 |
| 611E99711 PRECAST REINFORCED CONCRETE OUTLET, AS PER PLAN | 2 EACH | $300 | $350 | $275 | $450 | $300 | $100 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 265 FT | $4.00 | $3.50 | $2.50 | $10.00 | $4.00 | $2.00 |
| 407E10000 TACK COAT | 40 GAL | $8.00 | $3.50 | $3.00 | $2.00 | $4.00 | $2.22 |
| 408E10001 PRIME COAT, AS PER PLAN | 28 GAL | $10.00 | $91.00 | $50.00 | $25.00 | $50.00 | $28.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 6 EACH | $20.00 | $30.00 | $15.00 | $10.00 | $50.00 | $25.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 6 EACH | $25.00 | $8.00 | $8.50 | $7.50 | $15.00 | $12.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.05 MILE | $13,000 | $13,000 | $11,950 | $11,950 | $15,000 | $24,434 |
| 642E00300 CENTER LINE, TYPE 1 | 0.05 MILE | $13,000 | $13,200 | $12,220 | $12,220 | $18,000 | $32,578 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $40,000 | $40k | 27% |
| 203E20000 EMBANKMENT | 1,837 CY | $14.25 | $26k | 18% |
| 203E10000 EXCAVATION | 1,419 CY | $9 | $13k | 9% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 109 CY | $82 | $9k | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 34 CY | $215 | $7k | 5% |
| 606E15050 GUARDRAIL, TYPE MGS | 262.5 FT | $26 | $7k | 5% |
| 304E20000 AGGREGATE BASE | 53 CY | $98 | $5k | 4% |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 779 SY | $5.5 | $4k | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,000 | $4k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $4k | 3% |