HAS-SR 342-01.79
HAS County · est $0.1M
Bid dateThursday, December 3—
HAS County · est $0.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 8 more items below.
| Item | Quantity | R1Tucson INC | R2Glenn O Hawbaker INC | R3Mason Dixon Energy Services LLC | R4J & J Bridge Company INC | R5Ohio-west Virginia Excavating CO | R6R C Construction Company And Son INC | R7Mike Pusateri Excavating INC | R8Nls Paving, INC | R9Shelly & Sands INC | R10Litman Excavating INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $31,000 | $17,500 | $8,000 | $29,950 | $39,600 | $25,000 | $36,137 | $32,425 | $22,018 | $14,190 | 38% |
| Item | Quantity | R1Tucson INC | R2Glenn O Hawbaker INC | R3Mason Dixon Energy Services LLC | R4J & J Bridge Company INC | R5Ohio-west Virginia Excavating CO | R6R C Construction Company And Son INC | R7Mike Pusateri Excavating INC | R8Nls Paving, INC | R9Shelly & Sands INC | R10Litman Excavating INC |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 7 SY | $60.00 | $105 | $90.00 | $40.00 | $40.00 | $20.00 | $155 | $20.00 | $115 | $511 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA | 216 CY | $85.00 | $86.00 | $78.50 | $150 | $95.00 | $95.00 | $120 | $115 | $112 | $107 | 23% |
| 624E10000 MOBILIZATION | 1 LS | $7,000 | $8,450 | $13,000 | $3,000 | $2,000 | $10,000 | $7,135 | $13,500 | $4,000 | $12,380 | 9% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,500 | $3,000 | $1,272 | $2,500 | $2,700 | $2,500 | $4,616 | $3,000 | $17,500 | $6,057 | 4% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 62.5 FT | $50.00 | $72.00 | $90.00 | $5.00 | $65.00 | $65.00 | $51.50 | $46.80 | $58.00 | $53.34 | 4% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 1 EACH | $3,000 | $3,000 | $2,900 | $1,000 | $3,000 | $2,600 | $3,102 | $2,820 | $2,250 | $2,300 | 4% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 23 CY | $90.00 | $120 | $78.00 | $150 | $170 | $100 | $116 | $115 | $120 | $230 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,600 | $600 | $1,285 | $5,000 | $2,000 | $7,500 | $1,500 | $496 | $525 | $1,128 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,500 | $6,000 | $3,500 | $100 | $2,000 | $7,500 | $3,872 | $7,500 | $2,250 | $7,450 | 2% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 12 CY | $120 | $88.00 | $78.00 | $125 | $120 | $95.00 | $136 | $110 | $260 | $348 | 2% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2 CY | $485 | $1,200 | $2,800 | $300 | $675 | $2,000 | $750 | $965 | $3,500 | $3,500 | 1% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 1 CY | $965 | $2,400 | $3,000 | $300 | $900 | $2,000 | $1,200 | $1,850 | $5,000 | $5,000 | 1% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 5 CY | $185 | $150 | $75.00 | $200 | $200 | $275 | $182 | $225 | $200 | $496 | 1% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1 CY | $850 | $2,400 | $3,000 | $300 | $900 | $2,000 | $750 | $1,800 | $5,000 | $5,000 | 1% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.13 MILE | $5,400 | $9,700 | $7,000 | $5,000 | $6,500 | $12,500 | $5,995 | $4,995 | $4,995 | $5,000 | 1% |
| 642E00300 CENTER LINE, TYPE 1 | 0.07 MILE | $9,500 | $13,000 | $13,000 | $10,000 | $11,000 | $12,500 | $9,774 | $8,885 | $8,885 | $8,900 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.13 MILE | $5,000 | $10,000 | $6,800 | $5,000 | $6,000 | $12,500 | $5,115 | $4,650 | $4,650 | $4,650 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.07 MILE | $9,200 | $13,000 | $12,000 | $9,000 | $11,000 | $12,500 | $9,295 | $8,450 | $8,450 | $8,450 | 1% |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 117 SY | $5.00 | $12.00 | $20.00 | $8.00 | $20.00 | $5.00 | $29.00 | $21.50 | $14.61 | $20.75 | 1% |
| 202E38000 GUARDRAIL REMOVED | 100 FT | $3.00 | $20.00 | $80.00 | $1.00 | $6.00 | $5.00 | $2.50 | $2.40 | $2.50 | $34.67 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 1 EACH | $325 | $375 | $1,400 | $100 | $3,000 | $500 | $300 | $295 | $325 | $3,334 |
| 204E10000 SUBGRADE COMPACTION | 12 SY | $7.00 | $14.00 | $9.00 | $10.00 | $12.00 | $2.00 | $8.00 | $10.00 | $35.00 | $217 |
| 304E20000 AGGREGATE BASE | 5 CY | $95.00 | $165 | $79.00 | $50.00 | $260 | $100 | $149 | $325 | $160 | $441 |
| 407E10000 TACK COAT | 2 GAL | $90.00 | $60.00 | $19.00 | $10.00 | $8.00 | $10.00 | $100 | $8.00 | $2.50 | $2.50 |
| 408E10001 PRIME COAT, AS PER PLAN | 6 GAL | $85.00 | $60.00 | $150 | $10.00 | $8.00 | $100 | $100 | $75.00 | $200 | $2.50 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 3 EACH | $11.00 | $65.00 | $25.00 | $15.00 | $12.00 | $10.00 | $12.00 | $10.00 | $8.50 | $10.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $31,000 | $31k | 37% |
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA | 216 CY | $85 | $18k | 22% |
| 624E10000 MOBILIZATION | 1 LS | $7,000 | $7k | 8% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,500 | $4k | 4% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 62.5 FT | $50 | $3k | 4% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 1 EACH | $3,000 | $3k | 4% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 23 CY | $90 | $2k | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,600 | $2k | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,500 | $2k | 2% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 12 CY | $120 | $1k | 2% |