ROS-Tar Hollow Slips ODNR FY21
ROS County · est $0.3M
Bid dateThursday, January 14—
ROS County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 4 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Andis LLC | R3Alan Stone CO INC | R4D G M INC | R5Suburban Maintenance & Construction | R6INC Allard Excavation LLC | R7Complete General Construction Company | R8Dennison Bridge INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.:W24X131 STEEL BEAM | 1,005 FT | $80.00 | $20.00 | $80.00 | $70.00 | $89.00 | $80.72 | $108 | $92.00 | 35% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 640.4 FT | $60.00 | $150 | $85.00 | $50.00 | $79.00 | $85.65 |
| Item | Quantity | R1Shelly & Sands INC | R2Andis LLC | R3Alan Stone CO INC | R4D G M INC | R5Suburban Maintenance & Construction | R6INC Allard Excavation LLC | R7Complete General Construction Company | R8Dennison Bridge INC |
|---|---|---|---|---|---|---|---|---|---|
| 659E14000 REPAIR SEEDING AND MULCHING | 14 SY | $1.00 | $1.50 | $22.00 | $0.05 | $3.00 | $0.05 | $0.69 | $12.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.04 TON | $500 | $750 | $2,000 | $650 | $500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $106 |
| $95.00 |
| 17% |
| 524E95000 DRILLED SHAFTS, MISC.:LUG PILE, 36" DIAMETER, UNRE | 420 FT | $68.00 | $80.00 | $85.00 | $50.00 | $62.00 | $83.50 | $101 | $82.00 | 12% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 290 FT | $68.00 | $170 | $95.00 | $167 | $99.00 | $83.38 | $140 | $135 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $5,000 | $9,400 | $12,400 | $15,000 | $27,500 | $10,000 | $20,000 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 31 CY | $275 | $270 | $315 | $275 | $360 | $345 | $270 | $350 | 4% |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $4,100 | $1,000 | $1,000 | $750 | $900 | $1,200 | $2,500 | $2,000 | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,900 | $10,000 | $4,500 | $15,000 | $10,000 | $3,125 | $12,000 | $15,000 | 3% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 15 CY | $425 | $300 | $315 | $295 | $385 | $360 | $415 | $450 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,500 | $1,000 | $2,200 | $12,000 | $5,000 | $2,668 | $3,500 | $13,000 | 2% |
| 304E20000 AGGREGATE BASE | 50 CY | $80.00 | $40.00 | $75.00 | $100 | $65.00 | $80.10 | $110 | $150 | 2% |
| 203E10000 EXCAVATION | 103 CY | $35.00 | $50.00 | $20.00 | $35.00 | $15.00 | $28.25 | $40.00 | $25.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,225 | $2,000 | $2,600 | $2,500 | $3,000 | $3,750 | $2,500 | $10,000 | 1% |
| 659E10000 SEEDING AND MULCHING | 287 SY | $10.00 | $3.00 | $6.00 | $8.00 | $4.00 | $3.22 | $7.13 | $12.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,300 | $3,500 | $2,000 | $18,500 | $8,000 | $2,541 | $3,500 | $6,000 | 1% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 7 CY | $150 | $100 | $261 | $150 | $65.00 | $88.00 | $150 | $150 | 0% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 0% |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 3 EACH | $325 | $250 | $242 | $125 | $90.00 | $550 | $50.00 | $500 | 0% |
| 204E10000 SUBGRADE COMPACTION | 321 SY | $2.00 | $5.00 | $3.00 | $6.00 | $5.00 | $7.30 | $3.50 | $10.00 | 0% |
| 407E10000 TACK COAT | 160 GAL | $2.00 | $5.00 | $4.50 | $4.00 | $3.00 | $2.00 | $2.00 | $10.00 | 0% |
| $500 |
| $648 |
| $1,000 |
| 659E31000 LIME | 0.06 ACRE | $200 | $1,000 | $750 | $80.00 | $500 | $200 | $152 | $100 |
| 659E35000 WATER | 1.5 MGAL | $1.00 | $50.00 | $116 | $1.00 | $1.00 | $1.00 | $1.00 | $10.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.:W24X131 STEEL BEAM | 1,005 FT | $80 | $80k | 35% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 640.4 FT | $60 | $38k | 17% |
| 524E95000 DRILLED SHAFTS, MISC.:LUG PILE, 36" DIAMETER, UNRE | 420 FT | $68 | $29k | 12% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 290 FT | $68 | $20k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 31 CY | $275 | $9k | 4% |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $4,100 | $8k | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,900 | $8k | 3% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 15 CY | $425 | $6k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,500 | $5k | 2% |