CUY-US 322-15.59 Safety
CUY County · est $0.6M
Bid dateThursday, February 11—
CUY County · est $0.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 82 more items below.
| Item | Quantity | R1Perk Company INC | R2Terrace Construction CO INC | R3Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 328 CY | $133 | $160 | $137 | 12% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (222 CY | $128 | $176 | $131 | 8% |
| 809E69100 STOP LINE RADAR DETECTION | 4 EACH | $6,898 | $7,130 | $7,983 | 8% |
| 632E81091 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 2 EACH | $11,450 | $13,634 | $13,030 | 6% |
| 609E72000 CONCRETE MEDIAN, 6" | 200 SY | $100 | $47.00 | $74.00 | 5% |
| Item | Quantity | R1Perk Company INC | R2Terrace Construction CO INC | R3Eclipse CO LLC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $360 | $3,158 |
| 202E23000 PAVEMENT REMOVED | 331 SY | $14.00 | $6.00 | $11.00 |
| 202E32000 CURB REMOVED | 797 FT | $7.50 | $2.25 | $4.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 71 FT | $20.00 | $22.50 | $43.00 |
| 202E58200 INLET REMOVED | 2 EACH | $500 | $486 | $706 |
| 204E10000 SUBGRADE COMPACTION | 1,552 SY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 809E69200 EMERGENCY VEHICLE PREEMPTION | 1 EACH | $19,150 | $19,800 | $20,034 | 5% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $4,750 | $5,368 | $4,944 | 5% |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 1 EACH | $19,000 | $32,903 | $28,295 | 5% |
| 609E26000 CURB, TYPE 6 | 724 FT | $25.00 | $15.50 | $25.00 | 5% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 913 FT | $18.00 | $20.75 | $41.00 | 5% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 95 CY | $171 | $209 | $167 | 4% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 247 CY | $65.00 | $45.50 | $65.50 | 4% |
| 809E69000 ADVANCE RADAR DETECTION | 2 EACH | $7,414 | $7,490 | $8,343 | 4% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 227 FT | $63.00 | $52.00 | $47.50 | 4% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 226 FT | $63.00 | $58.70 | $50.50 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $13,600 | $1,518 | $6,992 | 4% |
| 203E10000 EXCAVATION | 724 CY | $18.00 | $24.50 | $20.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $34,597 | $23,019 | 3% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $9,400 | $9,576 | $9,167 | 3% |
| 632E80503 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 11, AS PER P | 1 EACH | $8,100 | $9,130 | $10,043 | 2% |
| $2.00 |
| $1.15 |
| $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 55 CY | $18.00 | $31.00 | $26.00 |
| 204E13001 EXCAVATION OF SUBGRADE, AS PER PLAN | 100 CY | $10.00 | $31.00 | $82.50 |
| 204E45000 PROOF ROLLING | 1 HOUR | $100 | $232 | $240 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 851 FT | $3.50 | $1.00 | $1.50 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 1,424 SY | $4.65 | $5.60 | $5.00 |
| 609E98000 CURB, MISC.:PEDESTRIAN CURB CUT | 48 FT | $20.00 | $193 | $10.50 |
| 659E00300 TOPSOIL | 9 CY | $100 | $52.90 | $137 |
| 659E10000 SEEDING AND MULCHING | 78 SY | $5.00 | $4.00 | $25.00 |
| 659E35000 WATER | 0.5 MGAL | $1.00 | $319 | $8.00 |
| 832E30000 EROSION CONTROL | 1,148 EACH | $1.00 | $1.00 | $1.00 |
| 611E04400 12" CONDUIT, TYPE B | 18 FT | $100 | $101 | $93.50 |
| 611E05900 15" CONDUIT, TYPE B | 22 FT | $200 | $103 | $106 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $4,000 | $3,182 | $4,681 |
| 611E98740 INLET, NO. 2-12 | 1 EACH | $6,000 | $4,065 | $10,426 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 4 EACH | $850 | $300 | $502 |
| 407E10000 TACK COAT | 465 GAL | $3.25 | $3.30 | $2.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 3 EACH | $89.94 | $111 | $92.50 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 3 EACH | $89.69 | $107 | $92.50 |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 1,428 FT | $2.70 | $2.70 | $3.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 378 FT | $1.47 | $1.80 | $2.00 |
| 625E25400 CONDUIT, 2", 725.04 | 95 FT | $12.70 | $21.75 | $19.50 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 3 EACH | $525 | $496 | $464 |
| 625E29000 TRENCH | 95 FT | $10.00 | $8.20 | $14.50 |
| 625E30700 PULL BOX, 725.08, 18" | 5 EACH | $825 | $844 | $850 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 95 FT | $0.47 | $0.40 | $0.50 |
| 625E75400 LIGHT POLE REMOVED | 1 EACH | $225 | $339 | $206 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 52 FT | $14.00 | $15.50 | $28.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $30.00 | $33.00 | $20.50 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 0.2 MILE | $3,500 | $3,850 | $21,630 |
| 642E00200 LANE LINE, 4", TYPE 1 | 0.06 MILE | $1,200 | $1,320 | $21,630 |
| 642E00300 CENTER LINE, TYPE 1 | 0.01 MILE | $19,500 | $21,450 | $21,630 |
| 642E00400 CHANNELIZING LINE, 8", TYPE 1 | 889 FT | $0.95 | $1.05 | $0.50 |
| 642E00500 STOP LINE, TYPE 1 | 106 FT | $3.50 | $3.85 | $4.00 |
| 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1 | 178 FT | $2.75 | $3.05 | $4.00 |
| 642E00720 CHEVRON MARKING, TYPE 1 | 287 FT | $2.75 | $3.05 | $4.50 |
| 642E01300 LANE ARROW, TYPE 1 | 10 EACH | $65.00 | $71.50 | $51.50 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $200 | $275 | $19.50 |
| 625E18200 BRACKET ARM, 15' | 3 EACH | $535 | $770 | $979 |
| 625E25400 CONDUIT, 2", 725.04 | 100 FT | $12.70 | $20.75 | $19.50 |
| 625E25500 CONDUIT, 3", 725.04 | 75 FT | $20.49 | $40.00 | $29.00 |
| 625E25600 CONDUIT, 4", 725.04 | 60 FT | $28.89 | $49.50 | $37.00 |
| 625E29000 TRENCH | 175 FT | $10.04 | $12.00 | $14.50 |
| 625E30700 PULL BOX, 725.08, 18" | 2 EACH | $825 | $844 | $850 |
| 625E30706 PULL BOX, 725.08, 24" | 3 EACH | $903 | $1,131 | $1,133 |
| 625E32000 GROUND ROD | 6 EACH | $235 | $195 | $273 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 175 FT | $0.47 | $0.40 | $0.50 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 12 EACH | $639 | $659 | $1,133 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 12 EACH | $38.80 | $53.60 | $41.00 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 824 FT | $1.99 | $1.95 | $3.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 961 FT | $2.20 | $2.05 | $3.00 |
| 632E69300 POWER CABLE, 3 CONDUCTOR, NO. 4 AWG | 165 FT | $4.06 | $6.10 | $5.00 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $1,800 | $2,076 | $1,288 |
| 632E77233 SIGNAL SUPPORT, MECHANICAL DAMPER FOR TC-81.21 MAS | 3 EACH | $575 | $697 | $1,030 |
| 632E81001 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 1 EACH | $7,875 | $8,097 | $8,240 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $3,200 | $1,958 | $1,803 |
| 632E90400 SIGNALIZATION, MISC.: TEST HOLE PERFORMED | 1 EACH | $410 | $633 | $103 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $2,000 | $1,396 | $3,090 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 1 EACH | $790 | $561 | $464 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $5,029 | $5,471 | $5,665 |
| 809E69122 ATC V6.24 CONTROLLER, AS PER PLAN | 1 EACH | $3,950 | $3,774 | $4,223 |
| 809E69210 PREEMPT RECEIVING UNIT | 4 EACH | $799 | $849 | $1,082 |
| 809E69220 PREEMPT DETECTOR CABLE | 876 FT | $1.62 | $2.30 | $3.00 |
| 809E69230 PREEMPT PHASE SELECTOR | 1 EACH | $4,025 | $3,780 | $3,863 |
| 809E69240 PREEMPT CONFIRMATION LIGHT | 4 EACH | $307 | $393 | $644 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 64 HOUR | $65.00 | $82.50 | $67.00 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,500 | $2,453 | $2,678 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 20 EACH | $8.00 | $8.80 | $11.50 |
| 614E13360 OBJECT MARKER, TWO WAY | 18 EACH | $18.00 | $19.75 | $15.50 |
| 614E13600 MAINTENANCE OF TRAFFIC, ONE LANE CLOSURE ON A TWO | 4 EACH | $1,450 | $2,200 | $2,436 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.78 MILE | $6,300 | $6,930 | $8,755 |
| 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 740.06, | 101 FT | $2.40 | $2.65 | $3.00 |
| 614E24400 WORK ZONE DOTTED LINE, CLASS I, 4", 740.06, TYPE I | 1,050 FT | $3.00 | $3.30 | $1.50 |
| 616E10000 WATER | 0.5 MGAL | $1.00 | $319 | $70.50 |
| 642E30030 REMOVAL OF PAVEMENT MARKING | 0.04 MILE | $5,500 | $6,050 | $51,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,600 | $4,190 | $8,750 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,000 | $8,734 | $11,213 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 328 CY | $133 | $44k | 8% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (222 CY | $128 | $28k | 5% |
| 809E69100 STOP LINE RADAR DETECTION | 4 EACH | $6,898 | $28k | 5% |
| 632E81091 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 2 EACH | $11,450 | $23k | 4% |
| 609E72000 CONCRETE MEDIAN, 6" | 200 SY | $100 | $20k | 4% |
| 809E69200 EMERGENCY VEHICLE PREEMPTION | 1 EACH | $19,150 | $19k | 4% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $4,750 | $19k | 4% |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 1 EACH | $19,000 | $19k | 4% |
| 609E26000 CURB, TYPE 6 | 724 FT | $25 | $18k | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 913 FT | $18 | $16k | 3% |