How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$650
659E31000LIME
0.09 ACRE
$275
$5.00
659E35000WATER
2 MGAL
$110
$5.00
407E20000NON-TRACKING TACK COAT
32 GAL
$22.00
$20.00
638E10800VALVE BOX ADJUSTED TO GRADE
3 EACH
$148
$225
625E32000GROUND ROD
2 EACH
$251
$250
630E03100GROUND MOUNTED SUPPORT, NO. 3 POST
42 FT
$12.10
$12.00
630E80100SIGN, FLAT SHEET
33 SF
$27.50
$25.00
630E85100REMOVAL OF GROUND MOUNTED SIGN AND REERECTION
1 EACH
$72.00
$100
630E86002REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA
1 EACH
$28.00
$50.00
632E64020PEDESTAL FOUNDATION
2 EACH
$605
$600
644E00100EDGE LINE, 4"
0.05 MILE
$2,170
$2,200
644E00300CENTER LINE
0.01 MILE
$4,160
$4,200
644E00500STOP LINE
82 FT
$7.15
$8.00
642E00800CURB MARKING, TYPE 1
192 FT
$6.75
$6.50
614E21100WORK ZONE CENTER LINE, CLASS I, 642 PAINT
0.01 MILE
$10,780
$1,000
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM