CUY-SR 175-08.59 Safety
CUY County · est $0.4M
Bid dateThursday, April 15—
CUY County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 57 more items below.
| Item | Quantity | R1Terrace Construction CO INC | R2Chagrin Valley Paving INC | R3Cook Paving & Construction CO INC | % of bid |
|---|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 263 CY | $220 | $200 | $225 | 17% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $7,401 | $7,250 | $9,000 | 9% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $7,041 | $7,150 | $9,000 | 8% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 630 SY | $38.50 | $30.00 | $40.00 | 7% |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 4 EACH | $5,993 | $5,800 |
| Item | Quantity | R1Terrace Construction CO INC | R2Chagrin Valley Paving INC | R3Cook Paving & Construction CO INC |
|---|---|---|---|---|
| 202E30000 WALK REMOVED | 1,410 SF | $2.30 | $5.00 | $2.00 |
| 202E32000 CURB REMOVED | 164 FT | $16.60 | $10.00 | $10.50 |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 85 FT | $38.25 | $125 | $37.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $209 | $250 | $125 |
| 659E00300 TOPSOIL | 58 CY | $50.50 | $100 | $60.00 |
| 659E10000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $6,200 |
| 7% |
| 632E72140 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 13 | 2 EACH | $11,310 | $12,800 | $14,000 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $21,230 | $12,500 | $10,000 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,812 | $36,250 | $31,000 | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5" DEPTH) | 6,294 SY | $2.30 | $2.00 | $3.50 | 4% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $2,400 | $1,250 | $1,650 | 4% |
| 608E52000 CURB RAMP | 463 SF | $26.00 | $40.00 | $21.00 | 4% |
| 608E15001 8" CONCRETE WALK, AS PER PLAN | 1,129 SF | $10.20 | $15.00 | $11.00 | 3% |
| 647E20010 CROSSWALK LINE, TYPE B90 | 580 FT | $16.50 | $15.00 | $20.00 | 3% |
| 632E72130 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 12 | 1 EACH | $9,213 | $10,300 | $11,000 | 3% |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 3,211 FT | $2.45 | $2.75 | $3.00 | 2% |
| 611E99150 INLET ADJUSTED TO GRADE | 8 EACH | $973 | $1,250 | $1,200 | 2% |
| 632E72110 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 4 | 1 EACH | $7,376 | $8,100 | $9,000 | 2% |
| 633E99000 CONTROLLER ITEM, MISC.: REUSE OF EMERGENCY VEHICLE | 1 EACH | $6,169 | $3,500 | $3,800 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $77.00 | $75.00 | $75.00 | 2% |
| 632E90400 SIGNALIZATION, MISC.:REUSE OF LICENSE PLATE CAMERA | 1 EACH | $5,703 | $4,500 | $5,000 | 2% |
| 525 SY |
| $2.60 |
| $5.00 |
| $5.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 26 SY | $10.50 | $5.00 | $12.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.7 TON | $765 | $250 | $900 |
| 659E35000 WATER | 3 MGAL | $202 | $10.00 | $50.00 |
| 832E30000 EROSION CONTROL | 2,799 EACH | $1.00 | $1.00 | $1.00 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 6 EACH | $929 | $950 | $815 |
| 611E99700 SPECIAL - GAS VALVE BOX ADJUSTED TO GRADE | 4 EACH | $306 | $600 | $80.00 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 600 LB | $1.50 | $1.50 | $1.75 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 3 EACH | $396 | $600 | $815 |
| 638E10900 SERVICE BOX ADJUSTED TO GRADE | 3 EACH | $387 | $600 | $85.00 |
| 407E20000 NON-TRACKING TACK COAT | 535 GAL | $4.40 | $3.00 | $3.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 56 FT | $16.50 | $10.00 | $17.00 |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 8 EACH | $314 | $300 | $330 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 1 EACH | $82.50 | $125 | $85.00 |
| 630E80100 SIGN, FLAT SHEET | 75.19 SF | $15.40 | $18.00 | $16.00 |
| 630E80510 SIGN, STREET NAME | 4 EACH | $204 | $150 | $215 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 2 EACH | $16.50 | $100 | $17.00 |
| 644E00200 LANE LINE, 4" | 0.31 MILE | $3,300 | $3,000 | $4,000 |
| 644E00300 CENTER LINE | 0.25 MILE | $5,500 | $5,000 | $8,000 |
| 644E00400 CHANNELIZING LINE, 8" | 275 FT | $1.65 | $1.50 | $1.25 |
| 644E00500 STOP LINE | 83 FT | $7.55 | $6.85 | $6.25 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 92 FT | $7.70 | $7.00 | $6.50 |
| 644E01300 LANE ARROW | 4 EACH | $138 | $125 | $140 |
| 644E01400 WORD ON PAVEMENT, 72" | 2 EACH | $275 | $250 | $200 |
| 646E50100 REMOVAL OF PAVEMENT MARKING | 251 FT | $5.50 | $5.00 | $4.50 |
| 625E25408 CONDUIT, 2", 725.051 | 408 FT | $12.30 | $7.50 | $3.25 |
| 625E25504 CONDUIT, 3", 725.051 | 208 FT | $15.20 | $12.00 | $4.00 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 314 FT | $3.85 | $2.00 | $2.25 |
| 625E29000 TRENCH | 323 FT | $10.80 | $14.00 | $14.00 |
| 625E32000 GROUND ROD | 6 EACH | $207 | $160 | $185 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 6 EACH | $721 | $750 | $870 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 4 EACH | $1,218 | $1,200 | $1,300 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 10 EACH | $45.50 | $40.00 | $45.00 |
| 632E64021 PEDESTAL FOUNDATION, AS PER PLAN | 2 EACH | $803 | $800 | $850 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 2,778 FT | $1.50 | $1.55 | $1.75 |
| 632E90008 PEDESTAL, 15', TRANSFORMER BASE | 1 EACH | $1,449 | $1,500 | $1,700 |
| 632E90010 PEDESTAL, MISC.: REUSE OF PEDESTRIAN PEDESTAL | 1 EACH | $258 | $300 | $300 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $3,181 | $2,500 | $2,750 |
| 632E90203 REUSE OF PEDESTRIAN SIGNAL HEAD, AS PER PLAN | 5 EACH | $362 | $250 | $275 |
| 632E90211 REUSE OF PEDESTRIAN PUSHBUTTON, AS PER PLAN | 5 EACH | $229 | $125 | $140 |
| 633E99000 CONTROLLER ITEM, MISC.: CONTROLLER AND CABINET MOD | 1 EACH | $1,078 | $2,500 | $2,700 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 0.31 MILE | $2,750 | $5,000 | $2,500 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 0.31 MILE | $2,750 | $5,000 | $2,500 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.25 MILE | $4,950 | $5,000 | $5,000 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.25 MILE | $4,950 | $5,000 | $5,000 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 275 FT | $0.95 | $3.00 | $1.00 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 275 FT | $0.95 | $3.00 | $1.00 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 83 FT | $3.85 | $5.50 | $4.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 83 FT | $3.85 | $4.50 | $4.00 |
| 616E10000 WATER | 2 MGAL | $202 | $50.00 | $50.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,249 | $4,300 | $8,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,664 | $5,000 | $7,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 263 CY | $220 | $58k | 13% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $7,401 | $30k | 7% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $7,041 | $28k | 6% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 630 SY | $38.5 | $24k | 6% |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 4 EACH | $5,993 | $24k | 6% |
| 632E72140 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 13 | 2 EACH | $11,310 | $23k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $21,230 | $21k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,812 | $19k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5" DEPTH) | 6,294 SY | $2.3 | $14k | 3% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $2,400 | $14k | 3% |