LOR-SR 252-01.90
LOR County · est $0.1M
Bid dateThursday, May 27—
LOR County · est $0.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 6 more items below.
| Item | Quantity | R1Suburban Maintenance & Construction | R2INC Alan Stone CO INC | R3Craig Edward Susany INC | R4Great Lakes Construction CO | R5Rietschlin Construction INC | R6Schirmer Construction LLC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE | 300 FT | $95.35 | $65.50 | $144 | $205 | $170 | $218 | 31% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $24,500 | $4,000 | $11,000 | $20,000 | $4,000 | 16% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 30" DIAMETER, UN | 160 FT | $67.50 |
| Item | Quantity | R1Suburban Maintenance & Construction | R2INC Alan Stone CO INC | R3Craig Edward Susany INC | R4Great Lakes Construction CO | R5Rietschlin Construction INC | R6Schirmer Construction LLC |
|---|---|---|---|---|---|---|---|
| 659E14000 REPAIR SEEDING AND MULCHING | 8 SY | $5.00 | $3.00 | $18.00 | $2.00 | $1.00 | $7.00 |
| 659E15000 INTER-SEEDING | 8 SY | $5.00 | $1.00 | $8.00 | $0.25 | $1.00 | $7.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $500 | $600 | $1,000 | $560 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $97.00 |
| $144 |
| $125 |
| $160 |
| $238 |
| 12% |
| 507E00101 STEEL PILES HP10X42, FURNISHED, AS PER PLAN | 295 FT | $25.62 | $52.50 | $45.00 | $50.00 | $45.00 | $50.00 | 8% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 2 EACH | $3,100 | $3,700 | $3,000 | $2,545 | $2,860 | $2,600 | 7% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,000 | $6,000 | $4,000 | $3,500 | $2,200 | $5,000 | 4% |
| 614E12420 DETOUR SIGNING | 1 LS | $3,200 | $8,000 | $4,000 | $2,500 | $2,400 | $5,000 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,000 | $6,500 | $1,000 | $3,200 | $2,900 | $6,000 | 3% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 87.5 FT | $29.70 | $48.00 | $75.00 | $33.20 | $37.00 | $34.00 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $790 | $1,000 | $3,500 | $10,300 | $100 | 2% |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 511E81300 CONCRETE, MISC.: PRECAST CONCRETE LAGGING | 1 EACH | $1,500 | $1,800 | $2,800 | $3,000 | $2,700 | $8,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,500 | $1,000 | $5,000 | $1,500 | $2,500 | $6,000 | 2% |
| 659E10000 SEEDING AND MULCHING | 156 SY | $5.00 | $9.00 | $18.00 | $14.50 | $10.00 | $7.00 | 1% |
| 659E00300 TOPSOIL | 17 CY | $45.00 | $68.50 | $100 | $150 | $53.00 | $125 | 1% |
| 617E10100 COMPACTED AGGREGATE | 10 CY | $60.00 | $141 | $100 | $300 | $175 | $200 | 1% |
| 203E20000 EMBANKMENT | 36 CY | $15.00 | $6.50 | $100 | $85.00 | $40.00 | $150 | 1% |
| 601E32201 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, AS PE | 5.2 CY | $100 | $370 | $200 | $450 | $650 | $400 | 1% |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $160 | $20.00 | $50.00 | $55.00 | $10.00 | 0% |
| 203E10000 EXCAVATION | 8 CY | $15.00 | $48.50 | $100 | $300 | $125 | $200 | 0% |
| $1,000 |
| $200 |
| 659E31000 LIME | 0.03 ACRE | $500 | $1,000 | $600 | $98.00 | $200 | $200 |
| 659E35000 WATER | 0.86 MGAL | $1.00 | $0.01 | $1.00 | $1.00 | $10.00 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, 1-WAY | 4 EACH | $7.50 | $11.00 | $10.00 | $7.50 | $9.00 | $10.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE | 300 FT | $95.35 | $29k | 31% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $15k | 16% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 30" DIAMETER, UN | 160 FT | $67.5 | $11k | 12% |
| 507E00101 STEEL PILES HP10X42, FURNISHED, AS PER PLAN | 295 FT | $25.62 | $8k | 8% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 2 EACH | $3,100 | $6k | 7% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,000 | $4k | 4% |
| 614E12420 DETOUR SIGNING | 1 LS | $3,200 | $3k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,000 | $3k | 3% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 87.5 FT | $29.7 | $3k | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $2k | 2% |