ASD-US 30-00.11
ASD County · est $3.7M
Bid dateThursday, July 1—
ASD County · est $3.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 163 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Trucco Construction CO INC | R3Kokosing Construction Company INC | R4Great Lakes Construction CO | R5Tri-mor CORP | R6Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 305E13010 9" CONCRETE BASE, CLASS QC 1P | 9,631 SY | $55.00 | $73.50 | $70.00 | $62.00 | $68.00 | $76.00 | 21% |
| 203E10000 EXCAVATION | 46,811 CY | $10.50 | $9.75 | $11.40 | $12.75 | $11.00 | $19.00 | 20% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,118 CY | $200 | $200 |
| Item | Quantity | R1Shelly & Sands INC | R2Trucco Construction CO INC | R3Kokosing Construction Company INC | R4Great Lakes Construction CO | R5Tri-mor CORP | R6Complete General Construction Company |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $16,000 | $62,400 | $71,000 | $25,000 | $60,000 |
| 201E21800 TREE REMOVED, 18" | 35 EACH | $300 | $300 | $70.00 | $250 | $450 | $300 |
| 201E23000 TREE REMOVED, 30" | 2 EACH | $500 | $500 | $275 | $500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $220 |
| $231 |
| $225 |
| $200 |
| 9% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 1,209 CY | $180 | $180 | $192 | $198 | $200 | $180 | 9% |
| 304E20000 AGGREGATE BASE | 2,820 CY | $50.00 | $62.00 | $50.00 | $50.00 | $60.00 | $48.00 | 6% |
| 255E10010 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 500 SY | $210 | $235 | $188 | $200 | $165 | $215 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $100,000 | $100,000 | $75,000 | $100,000 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $90,000 | $72,600 | $205,700 | $50,000 | $315,000 | $100,000 | 4% |
| 203E20000 EMBANKMENT | 8,335 CY | $9.00 | $7.50 | $4.00 | $8.00 | $5.00 | $7.00 | 3% |
| 202E23000 PAVEMENT REMOVED | 9,673 SY | $6.00 | $4.50 | $3.00 | $12.00 | $14.00 | $14.00 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 314 CY | $170 | $127 | $139 | $180 | $140 | $127 | 2% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 60 SNMT | $850 | $600 | $545 | $510 | $900 | $1,200 | 2% |
| 659E00300 TOPSOIL | 3,802 CY | $13.00 | $12.50 | $6.00 | $18.00 | $28.00 | $30.00 | 2% |
| 601E38001 PAVED GUTTER, TYPE 1-4, AS PER PLAN | 650 FT | $75.00 | $59.00 | $78.00 | $65.00 | $100 | $105 | 2% |
| 832E30000 EROSION CONTROL | 40,624 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 611E07600 18" CONDUIT, TYPE C | 675 FT | $60.00 | $50.00 | $75.00 | $55.00 | $68.00 | $90.00 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 9,970 FT | $4.00 | $15.50 | $6.40 | $14.00 | $15.00 | $13.00 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,975 FT | $20.00 | $19.20 | $19.20 | $19.20 | $22.00 | $19.20 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 15 MNTH | $2,600 | $1,800 | $2,000 | $2,000 | $1,500 | $2,500 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $39,000 | $45,000 | $45,000 | $35,000 | $28,700 | $40,000 | 2% |
| $875 |
| $500 |
| 202E20010 HEADWALL REMOVED | 1 EACH | $125 | $275 | $100 | $125 | $400 | $383 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 1,167 FT | $10.00 | $18.00 | $8.00 | $14.00 | $12.00 | $15.00 |
| 202E38000 GUARDRAIL REMOVED | 1,021 FT | $1.60 | $1.60 | $1.65 | $1.60 | $2.00 | $1.60 |
| 202E58100 CATCH BASIN REMOVED | 5 EACH | $200 | $700 | $199 | $500 | $300 | $400 |
| 202E75000 FENCE REMOVED | 119 FT | $7.50 | $2.75 | $4.00 | $7.50 | $10.00 | $7.50 |
| 202E98100 REMOVAL MISC.: BOLLARD REMOVED | 3 EACH | $95.00 | $150 | $10.00 | $125 | $50.00 | $350 |
| 204E10000 SUBGRADE COMPACTION | 11,780 SY | $2.50 | $2.50 | $0.70 | $2.00 | $1.00 | $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 514 CY | $11.00 | $20.00 | $9.00 | $25.00 | $20.00 | $28.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 514 CY | $42.00 | $48.50 | $48.50 | $50.00 | $52.00 | $47.00 |
| 204E45000 PROOF ROLLING | 6 HOUR | $200 | $230 | $245 | $350 | $250 | $300 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, NCHRP 350/MASH 2016 | 1 EACH | $2,500 | $2,480 | $2,480 | $2,480 | $2,800 | $2,480 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,000 | $985 | $985 | $985 | $1,100 | $985 |
| 607E15100 FENCE, TYPE 47RA | 6 FT | $200 | $199 | $56.88 | $199 | $220 | $199 |
| 623E38500 MONUMENT ASSEMBLY | 3 EACH | $1,000 | $1,750 | $823 | $573 | $800 | $1,200 |
| 623E40500 REFERENCE MONUMENT | 4 EACH | $400 | $1,050 | $415 | $200 | $500 | $1,200 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 4 SY | $120 | $125 | $71.00 | $150 | $150 | $77.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $200 | $100 | $190 | $25.00 | $425 | $100 |
| 659E10000 SEEDING AND MULCHING | 32,296 SY | $0.56 | $0.70 | $0.52 | $0.65 | $2.00 | $2.11 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,615 SY | $0.50 | $0.70 | $0.47 | $0.65 | $0.50 | $0.70 |
| 659E15000 INTER-SEEDING | 1,615 SY | $0.50 | $0.70 | $0.47 | $0.20 | $0.50 | $0.70 |
| 659E20000 COMMERCIAL FERTILIZER | 4.5 TON | $700 | $610 | $695 | $250 | $2,850 | $610 |
| 659E31000 LIME | 6.67 ACRE | $130 | $80.00 | $127 | $25.00 | $515 | $80.00 |
| 659E35000 WATER | 179 MGAL | $1.00 | $1.00 | $5.00 | $1.00 | $25.00 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION | 827 SY | $2.50 | $2.00 | $2.50 | $1.35 | $8.00 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,600 | $1,800 | $1,525 | $1,500 | $1,800 | $1,800 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $11,000 | $9,600 | $7,480 | $5,000 | $11,300 | $9,600 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $12,000 | $11,440 | $12,500 | $14,000 | $12,636 | $12,300 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 1,132 SY | $2.00 | $6.90 | $2.10 | $4.00 | $5.00 | $6.90 |
| 602E20000 CONCRETE MASONRY | 0.33 CY | $2,400 | $3,300 | $1,800 | $1,500 | $3,500 | $2,400 |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 2,507 FT | $13.00 | $8.00 | $9.50 | $11.00 | $11.00 | $13.00 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 100 FT | $17.00 | $19.00 | $15.00 | $12.00 | $11.00 | $22.00 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 3,585 FT | $10.00 | $6.25 | $8.35 | $9.00 | $11.00 | $11.00 |
| 605E31100 AGGREGATE DRAINS | 125 FT | $25.00 | $15.75 | $9.40 | $30.00 | $15.00 | $18.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 98 FT | $20.00 | $27.00 | $26.20 | $24.00 | $15.00 | $21.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $12.00 | $27.00 | $24.70 | $24.00 | $15.00 | $25.00 |
| 611E04400 12" CONDUIT, TYPE B | 282 FT | $55.00 | $64.50 | $65.40 | $65.00 | $75.00 | $110 |
| 611E05900 15" CONDUIT, TYPE B | 370 FT | $54.00 | $41.00 | $70.00 | $70.00 | $85.00 | $115 |
| 611E06100 15" CONDUIT, TYPE C | 349 FT | $52.00 | $42.00 | $64.00 | $65.00 | $65.00 | $90.00 |
| 611E98410 CATCH BASIN, NO. 8 | 4 EACH | $3,000 | $4,400 | $4,500 | $4,000 | $3,100 | $4,500 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $2,000 | $2,100 | $1,800 | $2,500 | $2,000 | $3,500 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 2 EACH | $600 | $800 | $600 | $500 | $700 | $1,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 4 EACH | $290 | $325 | $265 | $225 | $400 | $280 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 5,608 FT | $1.50 | $3.50 | $2.40 | $2.75 | $4.00 | $2.35 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIABLE DEPTH | 8,560 SY | $4.00 | $4.00 | $1.80 | $2.44 | $4.50 | $4.00 |
| 407E10000 TACK COAT | 3,107 GAL | $2.00 | $2.00 | $2.25 | $2.35 | $3.00 | $2.00 |
| 609E26000 CURB, TYPE 6 | 277 FT | $30.00 | $43.00 | $37.50 | $30.00 | $33.00 | $56.00 |
| 609E54000 6" CONCRETE TRAFFIC ISLAND | 184 SY | $95.00 | $42.50 | $58.50 | $70.00 | $68.00 | $58.00 |
| 617E10100 COMPACTED AGGREGATE | 21 CY | $135 | $173 | $115 | $160 | $98.00 | $108 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 1.53 MILE | $4,000 | $3,500 | $3,870 | $3,870 | $4,300 | $3,925 |
| 251E01030 PARTIAL DEPTH PAVEMENT REPAIR (442) | 25 CY | $600 | $750 | $500 | $304 | $665 | $600 |
| 625E00450 CONNECTION, FUSED PULL APART | 18 EACH | $90.00 | $85.00 | $106 | $85.00 | $95.00 | $105 |
| 625E00451 CONNECTION, FUSED PULL APART, AS PER PLAN | 6 EACH | $90.00 | $85.00 | $111 | $85.00 | $95.00 | $105 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 15 EACH | $90.00 | $85.00 | $121 | $85.00 | $95.00 | $120 |
| 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT15B40 | 4 EACH | $2,800 | $2,675 | $3,700 | $2,675 | $3,000 | $2,200 |
| 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT18B40 | 5 EACH | $3,000 | $3,000 | $4,312 | $3,000 | $3,300 | $2,350 |
| 625E14001 LIGHT POLE FOUNDATION, 24" X 6' DEEP, AS PER PLAN | 3 EACH | $1,700 | $1,675 | $2,850 | $1,675 | $1,850 | $1,400 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 9 EACH | $1,800 | $1,750 | $3,480 | $1,750 | $1,950 | $1,500 |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 8,379 FT | $3.00 | $2.95 | $3.00 | $2.95 | $3.50 | $2.85 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,020 FT | $1.50 | $1.50 | $2.00 | $1.50 | $2.00 | $3.00 |
| 625E25300 CONDUIT, 1-1/2", 725.04 | 2,142 FT | $15.00 | $14.50 | $23.00 | $14.50 | $16.00 | $22.00 |
| 625E25500 CONDUIT, 3", 725.04 | 171 FT | $32.00 | $31.00 | $50.00 | $31.00 | $35.00 | $45.00 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 280 FT | $50.00 | $48.00 | $29.00 | $48.00 | $54.00 | $62.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 14 EACH | $510 | $510 | $580 | $510 | $563 | $415 |
| 625E29000 TRENCH | 2,313 FT | $10.00 | $9.50 | $5.00 | $9.50 | $10.50 | $10.00 |
| 625E30700 PULL BOX, 725.08, 18" | 2 EACH | $900 | $875 | $660 | $875 | $966 | $1,085 |
| 625E30706 PULL BOX, 725.08, 24" | 6 EACH | $1,000 | $1,050 | $800 | $1,050 | $1,160 | $1,275 |
| 625E31510 PULL BOX REMOVED | 4 EACH | $200 | $200 | $25.00 | $200 | $221 | $100 |
| 625E32000 GROUND ROD | 14 EACH | $270 | $265 | $250 | $265 | $293 | $225 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $7,400 | $7,350 | $6,400 | $7,350 | $8,116 | $7,500 |
| 625E35011 REMOVE AND REERECT EXISTING LIGHT POLE, AS PER PLA | 3 EACH | $1,400 | $1,400 | $1,350 | $1,400 | $1,545 | $1,200 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 2,313 FT | $0.70 | $0.65 | $0.30 | $0.65 | $1.00 | $1.80 |
| 625E39520 PULL BOX CLEANED | 1 EACH | $75.00 | $75.00 | $500 | $75.00 | $83.00 | $75.00 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $7,000 | $6,755 | $500 | $6,755 | $7,500 | $32,000 |
| 625E40010 SPECIAL - REPLACEMENT OF EXISTING LIGHTING UNIT | 2 EACH | $155 | $150 | $1,560 | $150 | $165 | $3,000 |
| 625E75401 LIGHT POLE REMOVED, AS PER PLAN | 1 EACH | $210 | $200 | $450 | $200 | $225 | $300 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 4 EACH | $210 | $200 | $140 | $200 | $225 | $350 |
| 625E75507 LUMINAIRE REMOVED, AS PER PLAN | 6 EACH | $52.00 | $50.00 | $220 | $50.00 | $55.00 | $50.00 |
| 625E75801 DISCONNECT CIRCUIT, AS PER PLAN | 2 EACH | $265 | $265 | $450 | $265 | $295 | $150 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL(RIC-30-18.93)(ASD | 2 EACH | $2,500 | $2,500 | $1,500 | $2,500 | $2,800 | $850 |
| 625E98000 LIGHTING, MISC.: CONTROL CENTER WORK PAD | 1 EACH | $1,000 | $950 | $4,300 | $950 | $1,050 | $1,295 |
| 625E98000 LIGHTING, MISC.: EXISTING POWER SERVICE MODIFICATI | 1 EACH | $1,000 | $1,025 | $6,500 | $1,025 | $1,135 | $1,900 |
| 625E98000 LIGHTING, MISC.:CONTROL CENTER WORK PAD, SLOPED AR | 1 EACH | $2,500 | $2,500 | $4,300 | $2,500 | $2,800 | $5,500 |
| 621E00100 RPM | 180 EACH | $36.00 | $35.75 | $35.75 | $35.75 | $40.00 | $35.75 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 112 EACH | $5.00 | $20.00 | $4.50 | $10.00 | $15.00 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, 1WAY | 18 EACH | $8.00 | $7.30 | $7.30 | $7.30 | $10.50 | $7.30 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 28 EACH | $8.00 | $7.50 | $7.50 | $7.50 | $12.00 | $7.30 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 563.5 FT | $10.00 | $8.00 | $10.00 | $10.00 | $12.00 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 728 FT | $12.00 | $9.00 | $11.50 | $11.50 | $13.00 | $11.50 |
| 630E04101 GROUND MOUNTED SUPPORT, NO. 4 POST, AS PER PLAN | 285.5 FT | $14.00 | $11.00 | $14.00 | $14.00 | $16.00 | $14.00 |
| 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18 | 133.8 FT | $32.00 | $32.00 | $32.00 | $32.00 | $36.00 | $32.00 |
| 630E07500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X22 | 182.5 FT | $40.00 | $39.25 | $40.00 | $40.00 | $45.00 | $40.00 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 37.3 FT | $30.00 | $27.50 | $29.00 | $29.00 | $32.00 | $29.00 |
| 630E08000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W12X30 | 59.5 FT | $55.00 | $54.75 | $55.00 | $55.00 | $61.00 | $55.00 |
| 630E08600 SIGN POST REFLECTOR | 60 EACH | $35.00 | $45.00 | $35.00 | $35.00 | $40.00 | $35.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 17 EACH | $500 | $695 | $495 | $495 | $550 | $495 |
| 630E80100 SIGN, FLAT SHEET | 798.5 SF | $12.00 | $16.00 | $12.00 | $12.00 | $14.00 | $12.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 954 SF | $19.00 | $19.00 | $18.30 | $18.30 | $20.00 | $18.30 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 17 EACH | $800 | $950 | $770 | $770 | $900 | $770 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 79 EACH | $10.00 | $20.00 | $10.00 | $10.00 | $25.00 | $10.00 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 2 EACH | $110 | $200 | $110 | $110 | $125 | $110 |
| 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO | 1 EACH | $300 | $400 | $295 | $295 | $325 | $295 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 79 EACH | $15.00 | $30.00 | $15.00 | $15.00 | $18.00 | $15.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 2 EACH | $150 | $125 | $145 | $145 | $165 | $145 |
| 630E86292 REMOVAL OF GROUND MOUNTED WOODEN BOX BEAM SUPPORT | 4 EACH | $45.00 | $100 | $45.00 | $45.00 | $50.00 | $45.00 |
| 644E00104 EDGE LINE, 6" | 0.26 MILE | $9,300 | $3,200 | $5,000 | $3,200 | $3,600 | $9,295 |
| 644E00300 CENTER LINE | 0.13 MILE | $11,000 | $9,500 | $7,500 | $9,500 | $10,500 | $11,045 |
| 644E00500 STOP LINE | 38 FT | $6.00 | $6.00 | $7.25 | $6.00 | $10.00 | $6.05 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 614 FT | $6.00 | $5.95 | $6.00 | $5.95 | $7.00 | $5.90 |
| 644E00720 CHEVRON MARKING | 171 FT | $6.00 | $6.20 | $6.00 | $6.20 | $7.00 | $5.90 |
| 644E01300 LANE ARROW | 14 EACH | $100 | $105 | $95.00 | $105 | $115 | $100 |
| 644E01301 LANE ARROW, AS PER PLAN | 9 EACH | $150 | $155 | $185 | $155 | $175 | $150 |
| 644E20800 YIELD LINE | 37 FT | $6.50 | $8.00 | $14.50 | $8.00 | $9.00 | $6.40 |
| 644E40000 SPEED MEASUREMENT MARKING | 2 EACH | $500 | $525 | $950 | $525 | $580 | $500 |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 0.24 MILE | $30,000 | $15,000 | $28,825 | $15,000 | $16,500 | $28,825 |
| 807E12110 WET REFLECTIVE EPOXY PAVEMENT MARKING, LANE LINE, | 0.12 MILE | $28,000 | $9,500 | $27,880 | $9,500 | $10,500 | $27,880 |
| 807E14010 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, EDG | 1.65 MILE | $11,000 | $5,250 | $10,815 | $5,250 | $5,800 | $10,815 |
| 807E14110 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, LAN | 1.51 MILE | $9,000 | $3,200 | $8,900 | $3,200 | $3,600 | $8,900 |
| 807E14310 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, CHA | 2,864 FT | $2.50 | $3.50 | $2.50 | $3.50 | $4.00 | $2.50 |
| 807E14410 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, DOT | 1,341 FT | $2.30 | $2.50 | $2.25 | $2.50 | $3.00 | $2.25 |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $4,600 | $3,500 | $4,590 | $3,500 | $3,875 | $4,590 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $2.50 | $1.35 | $2.50 | $1.35 | $1.50 | $2.50 |
| 850E20010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $10,300 | $4,800 | $10,230 | $4,800 | $5,300 | $10,230 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 100 CY | $30.00 | $68.00 | $49.00 | $45.86 | $68.00 | $50.00 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 100 CY | $30.00 | $65.00 | $54.00 | $44.55 | $77.00 | $60.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $65.00 | $100 | $71.00 | $70.81 | $65.00 | $81.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,000 | $1,960 | $1,950 | $1,900 | $2,200 | $1,960 |
| 614E12420 DETOUR SIGNING | 1 LS | $11,500 | $20,250 | $17,520 | $35,000 | $25,000 | $20,000 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 4 EACH | $170 | $300 | $185 | $300 | $350 | $500 |
| 614E12500 REPLACEMENT SIGN | 10 EACH | $250 | $200 | $120 | $200 | $225 | $250 |
| 614E12600 REPLACEMENT DRUM | 25 EACH | $65.00 | $55.00 | $55.00 | $55.00 | $60.00 | $100 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 60 CY | $300 | $300 | $243 | $312 | $250 | $300 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, (1WAY) | 208 EACH | $6.00 | $8.00 | $9.00 | $8.00 | $10.00 | $16.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 208 EACH | $12.00 | $15.00 | $16.00 | $15.00 | $18.00 | $14.00 |
| 614E20056 WORK ZONE LANE LINE, CLASS I, 6", 807 PAINT | 2.99 MILE | $4,000 | $850 | $3,910 | $850 | $940 | $3,910 |
| 614E20210 WORK ZONE LANE LINE, CLASS I, 6", 740.06, TYPE I | 0.43 MILE | $5,500 | $7,100 | $2,500 | $7,100 | $7,800 | $5,505 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 1.63 MILE | $920 | $700 | $725 | $700 | $800 | $920 |
| 614E21050 WORK ZONE CENTER LINE, CLASS I, 807 PAINT | 0.12 MILE | $4,400 | $3,500 | $4,435 | $3,500 | $4,000 | $4,435 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.13 MILE | $1,200 | $2,500 | $2,360 | $2,500 | $2,800 | $1,185 |
| 614E22056 WORK ZONE EDGE LINE, CLASS I, 6", 807 PAINT | 6.55 MILE | $4,300 | $1,800 | $4,250 | $1,800 | $1,987 | $4,250 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 1.23 MILE | $11,400 | $8,500 | $9,055 | $8,500 | $10,000 | $11,210 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 2.16 MILE | $1,100 | $1,100 | $850 | $1,100 | $1,215 | $1,090 |
| 614E23110 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 807 PAI | 4,206 FT | $1.00 | $1.30 | $1.00 | $1.30 | $1.50 | $1.00 |
| 614E23410 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 740.06, | 135 FT | $3.50 | $3.75 | $3.50 | $3.75 | $4.00 | $3.42 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 2,864 FT | $0.75 | $1.25 | $0.80 | $1.25 | $1.50 | $0.75 |
| 614E24102 WORK ZONE DOTTED LINE, CLASS I, 6", 807 PAINT | 4,941 FT | $0.90 | $2.50 | $0.90 | $2.50 | $2.75 | $0.90 |
| 614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I | 1,440 FT | $2.20 | $2.25 | $2.50 | $2.25 | $3.00 | $2.12 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 1,341 FT | $0.70 | $0.50 | $0.75 | $0.50 | $1.00 | $0.70 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 38 FT | $2.50 | $3.50 | $2.80 | $3.50 | $4.00 | $2.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 38 FT | $2.50 | $3.50 | $3.65 | $3.50 | $4.00 | $2.40 |
| 614E30001 WORK ZONE ARROW, CLASS I, AS PER PLAN | 9 EACH | $105 | $95.00 | $75.00 | $95.00 | $105 | $100 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 23 EACH | $55.00 | $55.00 | $55.00 | $55.00 | $61.00 | $55.00 |
| 614E30400 WORK ZONE ARROW, CLASS I, 740.06, TYPE I | 2 EACH | $220 | $165 | $260 | $165 | $200 | $218 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 14 EACH | $50.00 | $55.00 | $55.00 | $55.00 | $61.00 | $50.00 |
| 614E98100 WORK ZONE PAVEMENT MARKING, MISC.: YIELD LINE | 38 FT | $5.00 | $4.00 | $7.50 | $4.00 | $5.00 | $5.00 |
| 614E98100 WORK ZONE PAVEMENT MARKING, MISC.: YIELD LINE, CLA | 37 FT | $5.00 | $4.00 | $5.50 | $4.00 | $5.00 | $4.90 |
| 614E98200 WORK ZONE PAVEMENT MARKING, MISC.: U-TURN ARROW, C | 9 EACH | $90.00 | $75.00 | $60.00 | $75.00 | $85.00 | $90.00 |
| 616E10000 WATER | 242 MGAL | $40.00 | $45.00 | $58.00 | $59.83 | $62.00 | $150 |
| 630E80300 SIGN, TEMPORARY OVERLAY | 38 SF | $9.00 | $8.00 | $25.00 | $8.00 | $28.00 | $3.95 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 24 SNMT | $350 | $750 | $430 | $625 | $750 | $900 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $21,500 | $16,000 | $42,000 | $58,000 | $28,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 305E13010 9" CONCRETE BASE, CLASS QC 1P | 9,631 SY | $55 | $530k | 15% |
| 203E10000 EXCAVATION | 46,811 CY | $10.5 | $492k | 14% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,118 CY | $200 | $224k | 6% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 1,209 CY | $180 | $218k | 6% |
| 304E20000 AGGREGATE BASE | 2,820 CY | $50 | $141k | 4% |
| 255E10010 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 500 SY | $210 | $105k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $90,000 | $90k | 3% |
| 203E20000 EMBANKMENT | 8,335 CY | $9 | $75k | 2% |
| 202E23000 PAVEMENT REMOVED | 9,673 SY | $6 | $58k | 2% |