CLI-US 68-14.97
CLI County · est $0.8M
Bid dateThursday, September 30—
CLI County · est $0.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 85 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Bansal Construction INC | R3Perram Electric INC | R4M P Dory CO | % of bid |
|---|---|---|---|---|---|---|
| 809E69201 EMERGENCY VEHICLE PREEMPTION, AS PER PLAN | 1 EACH | $123,000 | $139,900 | $124,700 | $49,500 | 20% |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 6 EACH | $7,465 | $7,500 | $6,240 | $8,500 | 7% |
| 632E71245 SIGNAL SUPPORT, TYPE TC-12.31 DESIGN 6 POLE, WITH | 2 EACH | $22,000 | $20,050 | $22,005 | $26,000 | 7% |
| 809E69100 STOP LINE RADAR DETECTION | 6 EACH | $6,800 | $7,490 | $6,330 | $7,800 |
| Item | Quantity | R1Complete General Construction Company | R2Bansal Construction INC | R3Perram Electric INC | R4M P Dory CO |
|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 458 SY | $23.00 | $16.80 | $36.00 | $15.40 |
| 202E30000 WALK REMOVED | 1,446 SF | $4.50 | $5.25 | $4.00 | $3.60 |
| 202E32000 CURB REMOVED | 409 FT | $12.00 | $10.50 | $10.00 | $14.40 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 6 FT | $80.00 | $31.50 | $25.00 | $67.00 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 7% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 3 EACH | $13,500 | $12,350 | $10,040 | $13,280 | 6% |
| 608E10000 4" CONCRETE WALK | 4,259 SF | $9.50 | $7.35 | $10.00 | $9.20 | 6% |
| 809E69210 PREEMPT RECEIVING UNIT | 10 EACH | $3,600 | $4,500 | $3,560 | $4,100 | 6% |
| 632E71365 SIGNAL SUPPORT, TYPE TC-12.31 DESIGN 10 POLE, WITH | 1 EACH | $28,000 | $25,510 | $26,315 | $30,700 | 4% |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 4" | 478 FT | $50.00 | $54.90 | $49.95 | $110 | 4% |
| 632E71361 SIGNAL SUPPORT, TYPE TC-12.31 DESIGN 10 POLE, WITH | 1 EACH | $23,000 | $23,670 | $21,985 | $28,200 | 4% |
| 609E26000 CURB, TYPE 6 | 435 FT | $50.00 | $35.70 | $45.00 | $44.00 | 3% |
| 632E72151 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 14, AS PER P | 1 EACH | $20,000 | $18,095 | $19,265 | $22,600 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $20,000 | $40,000 | 3% |
| 633E74001 UNINTERRUPTIBLE POWER SUPPLY (UPS), AS PER PLAN | 3 EACH | $6,500 | $7,325 | $7,530 | $8,300 | 3% |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 3 EACH | $6,000 | $5,000 | $4,590 | $4,600 | 3% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 22 EACH | $800 | $965 | $725 | $810 | 3% |
| 630E80100 SIGN, FLAT SHEET | 534 SF | $32.00 | $33.60 | $21.70 | $33.00 | 3% |
| 815E30001 SPREAD SPECTRUM RADIO, AS PER PLAN | 4 EACH | $4,200 | $4,325 | $3,830 | $4,000 | 3% |
| 632E64021 PEDESTAL FOUNDATION, AS PER PLAN | 16 EACH | $1,000 | $1,500 | $1,280 | $1,250 | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 15 CY | $1,000 | $394 | $600 | $460 | 2% |
| $600 |
| $420 |
| $400 |
| $1,230 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT (12") | 24 FT | $35.00 | $36.75 | $25.00 | $130 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 4 CY | $1,600 | $473 | $600 | $460 |
| 608E52000 CURB RAMP | 582 SF | $16.00 | $26.25 | $21.00 | $18.45 |
| 659E10000 SEEDING AND MULCHING | 10 SY | $20.00 | $5.25 | $10.00 | $15.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 5 SY | $100 | $0.26 | $10.00 | $10.00 |
| 659E15000 INTER-SEEDING | 5 SY | $100 | $0.26 | $5.00 | $10.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 50 FT | $21.00 | $10.50 | $15.00 | $30.75 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $36.00 | $10.50 | $5.00 | $30.75 |
| 611E04400 12" CONDUIT, TYPE B | 87 FT | $120 | $78.75 | $110 | $92.25 |
| 611E98150 CATCH BASIN, NO. 3 | 2 EACH | $3,300 | $4,200 | $4,500 | $3,895 |
| 611E98180 CATCH BASIN, NO. 3A | 1 EACH | $3,300 | $2,520 | $3,950 | $3,895 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $700 | $525 | $250 | $820 |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $4,050 | $4,830 | $3,600 | $5,640 |
| 204E10000 SUBGRADE COMPACTION | 113 SY | $8.00 | $4.20 | $3.00 | $3.60 |
| 304E20000 AGGREGATE BASE | 19 CY | $150 | $105 | $125 | $144 |
| 407E20000 NON-TRACKING TACK COAT | 19 GAL | $40.00 | $5.25 | $15.00 | $5.10 |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 3 CY | $2,500 | $578 | $650 | $870 |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 4 CY | $2,100 | $525 | $650 | $870 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $1,500 | $3,150 | $1,500 | $3,075 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 254 FT | $18.00 | $18.90 | $17.40 | $18.45 |
| 630E75001 SIGN ATTACHMENT ASSEMBLY, AS PER PLAN | 4 EACH | $720 | $404 | $840 | $1,000 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 31 EACH | $425 | $446 | $238 | $440 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 17 EACH | $130 | $137 | $110 | $133 |
| 630E80225 SIGN, OVERHEAD EXTRUSHEET, AS PER PLAN | 210 SF | $35.00 | $36.75 | $34.25 | $36.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 7 EACH | $20.00 | $21.00 | $24.30 | $21.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $75.00 | $78.75 | $175 | $80.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 8 EACH | $35.00 | $36.75 | $42.50 | $36.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 2 EACH | $30.00 | $31.50 | $85.00 | $30.75 |
| 630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION | 2 EACH | $145 | $152 | $185 | $150 |
| 630E97700 SIGNING, MISC.:SOLAR POWERED RECTANGULAR RAPID FLA | 2 EACH | $6,000 | $5,817 | $6,085 | $5,700 |
| 644E00100 EDGE LINE, 4" | 0.36 MILE | $8,550 | $8,978 | $8,550 | $8,764 |
| 644E00300 CENTER LINE | 0.29 MILE | $10,110 | $10,616 | $10,105 | $10,363 |
| 644E00400 CHANNELIZING LINE, 8" | 308 FT | $1.50 | $1.58 | $1.50 | $1.54 |
| 644E00500 STOP LINE | 244 FT | $5.00 | $5.25 | $5.00 | $5.13 |
| 644E00600 CROSSWALK LINE | 1,895 FT | $4.10 | $4.31 | $4.10 | $4.20 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 335 FT | $4.75 | $4.99 | $4.75 | $4.87 |
| 644E00900 ISLAND MARKING | 40 SF | $3.00 | $3.15 | $3.00 | $3.08 |
| 644E01200 PARKING LOT STALL MARKING | 1,516 FT | $1.50 | $1.58 | $1.50 | $1.54 |
| 644E01300 LANE ARROW | 27 EACH | $100 | $105 | $100 | $103 |
| 644E01500 DOTTED LINE, 4" | 416 FT | $1.45 | $1.52 | $1.45 | $1.49 |
| 644E01600 HANDICAP SYMBOL MARKING | 4 EACH | $135 | $142 | $135 | $138 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 3,223 FT | $0.85 | $0.89 | $0.85 | $0.87 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 37 EACH | $100 | $105 | $100 | $103 |
| 644E30030 REMOVAL OF PAVEMENT MARKING | 0.21 MILE | $4,080 | $4,284 | $4,080 | $4,182 |
| 625E25408 CONDUIT, 2", 725.051 | 168 FT | $10.00 | $5.35 | $14.95 | $24.00 |
| 625E25504 CONDUIT, 3", 725.051 | 50 FT | $18.00 | $9.25 | $23.70 | $40.00 |
| 625E25604 CONDUIT, 4", 725.051 | 22 FT | $25.00 | $12.60 | $30.05 | $50.00 |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 2" | 59 FT | $40.00 | $52.50 | $43.00 | $92.00 |
| 625E29000 TRENCH | 91 FT | $12.00 | $10.25 | $21.20 | $17.00 |
| 625E29400 TRENCH IN PAVED AREA | 129 FT | $45.00 | $50.00 | $102 | $88.00 |
| 625E30700 PULL BOX, 725.08, 18" | 6 EACH | $950 | $815 | $1,640 | $1,800 |
| 625E30706 PULL BOX, 725.08, 24" | 3 EACH | $1,200 | $1,040 | $1,825 | $2,140 |
| 625E31510 PULL BOX REMOVED | 9 EACH | $325 | $500 | $350 | $900 |
| 625E32000 GROUND ROD | 26 EACH | $250 | $295 | $270 | $350 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 2 EACH | $1,400 | $1,560 | $1,280 | $1,490 |
| 632E20730 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN | 24 EACH | $530 | $575 | $470 | $610 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 24 EACH | $290 | $265 | $300 | $370 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 3,288 FT | $3.50 | $2.05 | $2.15 | $4.30 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 1,557 FT | $4.00 | $2.30 | $2.35 | $4.50 |
| 632E64950 TEST HOLE PERFORMED | 6 EACH | $2,000 | $500 | $340 | $2,300 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 2,448 FT | $2.00 | $1.85 | $1.85 | $2.30 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 78 FT | $7.00 | $3.80 | $5.55 | $6.60 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 140 FT | $7.00 | $3.80 | $7.05 | $6.60 |
| 632E70001 POWER SERVICE, AS PER PLAN | 3 EACH | $2,000 | $4,500 | $1,680 | $3,000 |
| 632E72101 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 2, AS PER PL | 1 EACH | $11,000 | $8,110 | $10,100 | $12,760 |
| 632E89901 PEDESTAL, 8', TRANSFORMER BASE, AS PER PLAN | 10 EACH | $800 | $1,100 | $1,150 | $1,000 |
| 632E90001 PEDESTAL, 11', TRANSFORMER BASE, AS PER PLAN | 7 EACH | $800 | $1,980 | $1,915 | $1,100 |
| 633E45000 GPS (GLOBAL POSITIONING SYSTEM) CLOCK ASSEMBLY | 3 EACH | $550 | $600 | $585 | $440 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $4,000 | $1,435 | $2,900 | $4,400 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $2,500 | $875 | $390 | $600 |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 3 EACH | $4,500 | $4,350 | $3,620 | $6,200 |
| 809E69220 PREEMPT DETECTOR CABLE | 1,433 FT | $3.50 | $3.35 | $3.30 | $4.00 |
| 809E69230 PREEMPT PHASE SELECTOR | 3 EACH | $4,000 | $5,410 | $3,720 | $4,400 |
| 809E69240 PREEMPT CONFIRMATION LIGHT | 10 EACH | $550 | $705 | $485 | $1,220 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 12 HOUR | $81.00 | $75.00 | $65.00 | $75.00 |
| 616E10000 WATER | 10 MGAL | $60.00 | $75.00 | $100 | $10.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $6,970 | $17,911 | $6,200 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $20,000 | $59,325 | $10,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $7,500 | $5,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 809E69201 EMERGENCY VEHICLE PREEMPTION, AS PER PLAN | 1 EACH | $123,000 | $123k | 13% |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 6 EACH | $7,465 | $45k | 5% |
| 632E71245 SIGNAL SUPPORT, TYPE TC-12.31 DESIGN 6 POLE, WITH | 2 EACH | $22,000 | $44k | 4% |
| 809E69100 STOP LINE RADAR DETECTION | 6 EACH | $6,800 | $41k | 4% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 3 EACH | $13,500 | $41k | 4% |
| 608E10000 4" CONCRETE WALK | 4,259 SF | $9.5 | $40k | 4% |
| 809E69210 PREEMPT RECEIVING UNIT | 10 EACH | $3,600 | $36k | 4% |
| 632E71365 SIGNAL SUPPORT, TYPE TC-12.31 DESIGN 10 POLE, WITH | 1 EACH | $28,000 | $28k | 3% |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 4" | 478 FT | $50 | $24k | 2% |
| 632E71361 SIGNAL SUPPORT, TYPE TC-12.31 DESIGN 10 POLE, WITH | 1 EACH | $23,000 | $23k | 2% |