WAS-SR 7-39.35
WAS County · est $1.6M
Bid dateThursday, September 30—
WAS County · est $1.6M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 3.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 18 more items below.
| Item | Quantity | R1Allison Park Contractors INC | R2Buds INC | R3Alan Stone CO INC | % of bid |
|---|---|---|---|---|---|
| 520E10001 PNEUMATICALLY PLACED CONCRETE SHOTCRETE, AS PER PL | 7,530 SF | $45.00 | $68.75 | $70.50 | 23% |
| 862E99000 ROCKFALL PROTECTION, MISC.: ROCK BOLTS | 1,400 FT | $225 | $217 | $219 | 21% |
| 862E00600 SLOPE DRAPE | 1,304 SY | $120 | $147 | $139 | 11% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $90,000 | 7% |
| 862E00610 EXCAVATION | 2,753 CY | $35.00 | $25.00 | $20.00 | 7% |
| Item | Quantity | R1Allison Park Contractors INC | R2Buds INC | R3Alan Stone CO INC |
|---|---|---|---|---|
| 202E75711 SPECIAL - EXISTING CONDUIT CLEANED | 58 FT | $50.00 | $50.00 | $62.00 |
| 203E10000 EXCAVATION | 48 CY | $75.00 | $40.00 | $41.50 |
| 203E20000 EMBANKMENT | 115 CY | $40.00 | $35.00 | $10.50 |
| 659E10000 SEEDING AND MULCHING | 2,720 SY | $1.50 | $3.00 | $2.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.4 TON | $850 | $700 | $644 |
| 659E31000 LIME | 0.62 ACRE |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 862E00500 SCALING | 180 HOUR | $425 | $525 | $370 | 5% |
| 690E98400 SPECIAL - DESIGNER PLAN AND FIELD REVIEW | 1 LS | $60,000 | $38,000 | $35,000 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,000 | $50,000 | $57,500 | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 181 CY | $300 | $260 | $287 | 4% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $50,597 | $100,000 | $90,000 | 3% |
| 862E00700 TRIM BLASTING | 2,000 SF | $25.00 | $35.50 | $75.00 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 990 FT | $45.00 | $27.00 | $17.00 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $15,000 | $14,000 | $1,800 | 1% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 837 SY | $15.00 | $31.00 | $25.50 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $18,000 | $11,000 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $1,500 | $1,200 | $1,800 | 1% |
| 617E10100 COMPACTED AGGREGATE | 44 CY | $200 | $125 | $92.00 | 1% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | 0% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,500 | $2,400 | $2,700 | 0% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $5,000 | $18,000 | $4,000 | 0% |
| $100 |
| $200 |
| $824 |
| 659E35000 WATER | 8.09 MGAL | $2.00 | $1.00 | $117 |
| 671E15060 EROSION CONTROL MAT, TYPE G | 275 SY | $8.00 | $10.00 | $88.50 |
| 407E20000 NON-TRACKING TACK COAT | 346 GAL | $5.00 | $4.00 | $4.50 |
| 408E10000 PRIME COAT | 211 GAL | $15.00 | $3.25 | $3.50 |
| 621E00100 RPM | 30 EACH | $25.00 | $100 | $106 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 30 EACH | $25.00 | $15.00 | $27.50 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.45 MILE | $6,000 | $2,200 | $2,300 |
| 642E00300 CENTER LINE, TYPE 1 | 0.23 MILE | $6,000 | $3,800 | $4,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 20 EACH | $20.00 | $8.00 | $27.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 20 EACH | $25.00 | $15.00 | $31.50 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.2 MILE | $13,000 | $4,000 | $4,200 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 24 FT | $10.00 | $15.00 | $13.50 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 520E10001 PNEUMATICALLY PLACED CONCRETE SHOTCRETE, AS PER PL | 7,530 SF | $45 | $339k | 23% |
| 862E99000 ROCKFALL PROTECTION, MISC.: ROCK BOLTS | 1,400 FT | $225 | $315k | 21% |
| 862E00600 SLOPE DRAPE | 1,304 SY | $120 | $156k | 10% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 7% |
| 862E00610 EXCAVATION | 2,753 CY | $35 | $96k | 6% |
| 862E00500 SCALING | 180 HOUR | $425 | $77k | 5% |
| 690E98400 SPECIAL - DESIGNER PLAN AND FIELD REVIEW | 1 LS | $60,000 | $60k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,000 | $55k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 181 CY | $300 | $54k | 4% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $50,597 | $51k | 3% |