BEL-SR 800-00.70
BEL County · est $0.3M
Bid dateThursday, November 18—
BEL County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 19 more items below.
| Item | Quantity | R1Bog Construction INC | R2Ohio-west Virginia Excavating CO | R3J & J Bridge Company INC | R4Litman Excavating INC | R5Shelly & Sands INC | R6Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 2,317 CY | $14.00 | $14.00 | $29.00 | $28.31 | $39.00 | $19.00 | 17% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $30,000 | $44,700 | $35,000 | $4,398 | $35,000 | $84,358 | 16% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 53 CY | $416 | $247 |
| Item | Quantity | R1Bog Construction INC | R2Ohio-west Virginia Excavating CO | R3J & J Bridge Company INC | R4Litman Excavating INC | R5Shelly & Sands INC | R6Eclipse CO LLC |
|---|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 1 EACH | $500 | $955 | $300 | $1,231 | $84.00 | $991 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 26 FT | $75.00 | $23.00 | $50.00 | $143 | $6.50 | $50.00 |
| 202E38000 GUARDRAIL REMOVED | 225 FT | $2.00 | $6.30 | $3.00 | $5.10 | $1.80 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $300 |
| $382 |
| $318 |
| $376 |
| 11% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $51,050 | $20,000 | $5,580 | $10,000 | $36,497 | 8% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 19 CY | $756 | $365 | $500 | $754 | $628 | $743 | 7% |
| 203E10000 EXCAVATION | 1,554 CY | $8.00 | $14.35 | $23.00 | $41.68 | $27.00 | $20.00 | 6% |
| 606E15050 GUARDRAIL, TYPE MGS | 225 FT | $36.00 | $35.00 | $35.00 | $38.23 | $33.40 | $33.00 | 4% |
| 304E20000 AGGREGATE BASE | 60 CY | $115 | $94.50 | $125 | $171 | $140 | $107 | 4% |
| 611E07400 18" CONDUIT, TYPE B | 54 FT | $125 | $336 | $110 | $200 | $240 | $111 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 356 SY | $18.00 | $7.00 | $15.00 | $21.60 | $18.00 | $21.00 | 3% |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 1,140 SY | $5.00 | $4.00 | $2.00 | $4.74 | $3.25 | $3.00 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $3,761 | $18,500 | $5,629 | $1,871 | $6,000 | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (11 CY | $443 | $360 | $325 | $412 | $343 | $406 | 3% |
| 601E26000 DUMPED ROCK FILL, TYPE B | 67 CY | $65.00 | $80.35 | $103 | $138 | $115 | $108 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,000 | $8,425 | $5,000 | $9,199 | $10,820 | $17,100 | 2% |
| 202E23000 PAVEMENT REMOVED | 178 SY | $20.00 | $20.00 | $25.00 | $31.75 | $25.00 | $21.00 | 2% |
| 621E00100 RPM | 3 EACH | $1,000 | $1,045 | $1,000 | $1,140 | $950 | $1,339 | 2% |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $2,500 | $2,385 | $3,000 | $1,005 | $1,800 | $3,075 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $1,650 | $2,500 | $2,700 | $6,000 | $12,000 | 1% |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| $3.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $500 | $955 | $600 | $1,566 | $190 | $369 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 15" | 25 FT | $50.00 | $84.72 | $75.00 | $237 | $55.00 | $118 |
| 202E98000 REMOVAL MISC.: PILING REMOVED | 1 LS | $1,500 | $2,940 | $3,000 | $1,039 | $3,025 | $6,962 |
| 204E10000 SUBGRADE COMPACTION | 322 SY | $2.00 | $1.50 | $4.00 | $3.28 | $3.25 | $1.00 |
| 204E50001 GEOTEXTILE FABRIC, AS PER PLAN | 108 SY | $10.00 | $9.85 | $5.00 | $3.27 | $4.00 | $3.00 |
| 601E27000 DUMPED ROCK FILL, TYPE C | 24 CY | $70.00 | $123 | $135 | $189 | $97.00 | $137 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 8 CY | $100 | $140 | $220 | $333 | $200 | $140 |
| 602E20000 CONCRETE MASONRY | 0.33 CY | $2,000 | $3,070 | $3,500 | $592 | $3,000 | $3,200 |
| 407E10000 TACK COAT | 65 GAL | $5.00 | $2.75 | $2.00 | $2.40 | $2.00 | $2.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 36 GAL | $15.00 | $2.75 | $12.00 | $16.80 | $14.00 | $17.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 3 EACH | $100 | $38.50 | $15.00 | $13.40 | $120 | $15.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 4 EACH | $15.00 | $13.25 | $12.00 | $33.60 | $7.50 | $13.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $200 | $318 | $60.00 | $170 | $95.00 | $74.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 1 EACH | $200 | $318 | $70.00 | $225 | $165 | $74.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.08 MILE | $15,000 | $7,900 | $6,500 | $8,610 | $7,175 | $25,641 |
| 642E00300 CENTER LINE, TYPE 1 | 0.04 MILE | $15,000 | $15,200 | $12,000 | $16,554 | $13,795 | $25,982 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 2,317 CY | $14 | $32k | 16% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $30,000 | $30k | 15% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 53 CY | $416 | $22k | 11% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $15k | 7% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 19 CY | $756 | $14k | 7% |
| 203E10000 EXCAVATION | 1,554 CY | $8 | $12k | 6% |
| 606E15050 GUARDRAIL, TYPE MGS | 225 FT | $36 | $8k | 4% |
| 304E20000 AGGREGATE BASE | 60 CY | $115 | $7k | 3% |
| 611E07400 18" CONDUIT, TYPE B | 54 FT | $125 | $7k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 356 SY | $18 | $6k | 3% |