ATH-SR 56-04.97
ATH County · est $0.2M
Bid dateThursday, March 11—
ATH County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 14 more items below.
| Item | Quantity | R1Parker Corporation | R2Axis Civil Construction LLC | R3R C Construction Company And Son | R4INC Righter Company INC | R5Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 601E27001 DUMPED ROCK FILL, TYPE C, AS PER PLAN | 1,293 CY | $80.00 | $92.00 | $75.00 | $90.00 | $82.00 | 55% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 54 CY | $331 | $350 | $375 | $300 | $308 | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $7,500 | $25,000 | $25,000 | $14,160 | 5% |
| 203E35121 GRANULAR MATERIAL, TYPE C, AS PER PLAN, 703.16 | 84 CY | $80.00 | $100 | $75.00 | $100 | $116 | 4% |
| 304E20000 AGGREGATE BASE | 79 CY | $80.00 | $85.00 | $100 | $100 | $95.50 | 3% |
| 624E10000 MOBILIZATION |
| Item | Quantity | R1Parker Corporation | R2Axis Civil Construction LLC | R3R C Construction Company And Son | R4INC Righter Company INC | R5Eclipse CO LLC |
|---|---|---|---|---|---|---|
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 200 FT | $2.00 | $3.00 | $5.00 | $2.20 | $2.00 |
| 202E42806 ANCHOR ASSEMBLY REMOVED FOR REUSE | 1 EACH | $300 | $300 | $500 | $135 | $263 |
| 659E10000 SEEDING AND MULCHING | 322 SY | $1.00 | $4.00 | $10.00 | $3.00 | $8.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.04 TON | $6,250 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $5,550 |
| $17,000 |
| $10,000 |
| $10,000 |
| $44,117 |
| 3% |
| 203E10000 EXCAVATION | 264 CY | $20.00 | $23.00 | $15.00 | $25.00 | $28.50 | 3% |
| 203E20000 EMBANKMENT | 242 CY | $20.00 | $23.00 | $20.00 | $25.00 | $21.50 | 3% |
| 606E16560 GUARDRAIL REBUILT, TYPE MGS WITH LONG POSTS | 200 FT | $23.00 | $23.10 | $35.00 | $20.60 | $26.50 | 2% |
| 621E00100 RPM | 11 EACH | $300 | $203 | $650 | $250 | $368 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $10,000 | $1,500 | $7,800 | $7,000 | 2% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,500 | $1,800 | $1,500 | $2,320 | $1,998 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,000 | $2,000 | $6,500 | $5,000 | $4,100 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $4,000 | $10,000 | $3,000 | $10,000 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 220 FT | $10.00 | $23.00 | $25.00 | $20.00 | $58.00 | 1% |
| 606E27850 ANCHOR ASSEMBLY REBUILT, TYPE E | 1 EACH | $1,650 | $1,620 | $2,800 | $1,840 | $1,315 | 1% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 617E10100 COMPACTED AGGREGATE | 14 CY | $65.00 | $95.00 | $100 | $200 | $140 | 0% |
| 408E10000 PRIME COAT | 67 GAL | $13.00 | $5.00 | $25.00 | $20.00 | $40.00 | 0% |
| 407E20000 NON-TRACKING TACK COAT | 104 GAL | $8.00 | $5.00 | $10.00 | $5.00 | $3.50 | 0% |
| $800 |
| $1,200 |
| $750 |
| $642 |
| 659E31000 LIME | 0.07 ACRE | $3,572 | $600 | $800 | $300 | $84.14 |
| 659E35000 WATER | 0.87 MGAL | $0.51 | $1.00 | $1.00 | $10.00 | $1.05 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 11 EACH | $20.00 | $25.00 | $50.00 | $10.00 | $5.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.16 MILE | $1,750 | $6,525 | $12,500 | $4,500 | $6,310 |
| 642E00300 CENTER LINE, TYPE 1 | 0.08 MILE | $2,514 | $13,050 | $12,500 | $8,650 | $6,573 |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $200 | $500 | $5,500 | $2,500 | $11,565 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 5 EACH | $10.00 | $7.00 | $25.00 | $36.00 | $11.50 |
| 614E13360 OBJECT MARKER, TWO WAY | 5 EACH | $10.00 | $13.00 | $25.00 | $42.00 | $16.00 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.02 MILE | $30,000 | $50,000 | $25,000 | $42,550 | $7,887 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 24 FT | $10.00 | $7.50 | $50.00 | $12.50 | $3.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E27001 DUMPED ROCK FILL, TYPE C, AS PER PLAN | 1,293 CY | $80 | $103k | 54% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 54 CY | $331 | $18k | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $10k | 5% |
| 203E35121 GRANULAR MATERIAL, TYPE C, AS PER PLAN, 703.16 | 84 CY | $80 | $7k | 4% |
| 304E20000 AGGREGATE BASE | 79 CY | $80 | $6k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $5,550 | $6k | 3% |
| 203E10000 EXCAVATION | 264 CY | $20 | $5k | 3% |
| 203E20000 EMBANKMENT | 242 CY | $20 | $5k | 3% |
| 606E16560 GUARDRAIL REBUILT, TYPE MGS WITH LONG POSTS | 200 FT | $23 | $5k | 2% |
| 621E00100 RPM | 11 EACH | $300 | $3k | 2% |