HOC-Tar Hollow State Park
HOC County · est $0.3M
Bid dateThursday, September 16—
HOC County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 13 more items below.
| Item | Quantity | R1Alan Stone CO INC | R2Ohio-west Virginia Excavating CO | R3Shelly & Sands INC | R4D G M INC | R5George J Igel & CO INC | R6Wolf Creek Contracting Company LLC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.:SOLDIER PILES, W24x131 | 823 FT | $119 | $111 | $112 | $117 | $135 | $129 | 36% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 480 FT | $77.50 | $85.50 | $75.00 | $119 | $85.00 | $121 | 14% |
| 530E00400 SPECIAL - STRUCTURES, PRECAST CONCRETE LAGGING | 107 EACH | $242 | $211 | $300 |
| Item | Quantity | R1Alan Stone CO INC | R2Ohio-west Virginia Excavating CO | R3Shelly & Sands INC | R4D G M INC | R5George J Igel & CO INC | R6Wolf Creek Contracting Company LLC |
|---|---|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 135 CY | $4.50 | $42.25 | $20.00 | $20.00 | $34.00 | $19.79 |
| 204E10000 SUBGRADE COMPACTION | 158 SY | $3.50 | $1.50 | $8.00 | $4.00 | $8.00 | $0.80 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $669 | $3,900 | $900 | $650 | $950 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $280 |
| $340 |
| $150 |
| 9% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 192 FT | $87.00 | $70.75 | $105 | $87.00 | $70.00 | $133 | 6% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 26 CY | $600 | $353 | $600 | $470 | $500 | $542 | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 24 CY | $600 | $264 | $500 | $420 | $380 | $482 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $13,000 | $26,100 | $10,000 | $5,000 | $20,000 | $75,847 | 5% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 250 FT | $39.50 | $45.52 | $31.50 | $36.00 | $35.25 | $38.07 | 4% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 2 EACH | $3,500 | $3,950 | $2,840 | $2,400 | $2,425 | $2,771 | 3% |
| 304E20000 AGGREGATE BASE | 63 CY | $96.00 | $82.25 | $75.00 | $80.00 | $125 | $50.00 | 2% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 96 CY | $59.00 | $72.75 | $85.00 | $90.00 | $86.50 | $63.93 | 2% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 9 CY | $468 | $467 | $425 | $1,000 | $750 | $431 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,000 | $2,500 | $4,500 | $11,000 | $5,000 | $10,000 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,700 | $775 | $5,000 | $4,000 | $7,500 | $2,410 | 1% |
| 203E10000 EXCAVATION | 200 CY | $17.50 | $38.00 | $15.00 | $20.00 | $36.00 | $9.56 | 1% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,900 | $7,500 | $7,500 | $13,100 | $7,500 | $8,735 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $4,100 | $2,000 | $6,000 | $3,000 | $9,000 | 1% |
| 659E10000 SEEDING AND MULCHING | 200 SY | $5.50 | $6.50 | $12.50 | $10.00 | $13.00 | $16.20 | 0% |
| 202E23000 PAVEMENT REMOVED | 141 SY | $5.00 | $13.50 | $12.00 | $12.00 | $35.00 | $16.99 | 0% |
| $844 |
| 659E31000 LIME | 0.05 ACRE | $857 | $1,800 | $125 | $80.00 | $135 | $102 |
| 659E35000 WATER | 1 MGAL | $122 | $55.00 | $1.00 | $1.00 | $1.00 | $1.20 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $511 | $175 | $250 | $200 | $265 | $212 |
| 407E20000 NON-TRACKING TACK COAT | 45 GAL | $5.00 | $2.25 | $3.00 | $10.00 | $8.00 | $6.02 |
| 408E10000 PRIME COAT | 30 GAL | $6.00 | $2.25 | $50.00 | $5.00 | $6.50 | $114 |
| 617E10100 COMPACTED AGGREGATE | 4 CY | $141 | $165 | $150 | $125 | $280 | $75.51 |
| 642E00300 CENTER LINE, TYPE 1 | 0.05 MILE | $3,700 | $20,805 | $20,105 | $35,000 | $3,150 | $24,223 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 137 FT | $5.00 | $4.75 | $4.00 | $20.00 | $6.25 | $8.98 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 20 FT | $5.00 | $6.00 | $20.00 | $20.00 | $19.00 | $8.98 |
| 524E95000 DRILLED SHAFTS, MISC.:EXTENSION | 6 FT | $81.50 | $196 | $85.00 | $110 | $89.00 | $342 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.:SOLDIER PILES, W24x131 | 823 FT | $119 | $98k | 35% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 480 FT | $77.5 | $37k | 13% |
| 530E00400 SPECIAL - STRUCTURES, PRECAST CONCRETE LAGGING | 107 EACH | $242 | $26k | 9% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 192 FT | $87 | $17k | 6% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 26 CY | $600 | $16k | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 24 CY | $600 | $14k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $13,000 | $13k | 5% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 250 FT | $39.5 | $10k | 4% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 2 EACH | $3,500 | $7k | 3% |
| 304E20000 AGGREGATE BASE | 63 CY | $96 | $6k | 2% |