ROS-SR 41-05.50 Geotech
ROS County · est $0.5M
Bid dateThursday, January 13—
ROS County · est $0.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 14 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Ohio-west Virginia Excavating CO | R3Alan Stone CO INC | R4D G M INC | R5W E Smith Construction | R6Complete General Construction Company | R7Allard Excavation LLC | R8Dot Construction CORP | R9R C Construction Company And Son | R10INC Beaty Construction INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.:W24X192 STEEL BEAM | 1,230 FT | $164 | $167 | $172 | $175 | $165 | $160 | $184 | $180 | $165 | $220 | 47% |
| Item | Quantity | R1Shelly & Sands INC | R2Ohio-west Virginia Excavating CO | R3Alan Stone CO INC | R4D G M INC | R5W E Smith Construction | R6Complete General Construction Company | R7Allard Excavation LLC | R8Dot Construction CORP | R9R C Construction Company And Son | R10INC Beaty Construction INC |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 30 CY | $30.00 | $66.75 | $116 | $30.00 | $50.00 | $25.00 | $13.91 | $50.00 | $50.00 | $100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 766.3 FT | $67.00 | $76.87 | $64.00 | $93.00 | $100 | $105 | $98.00 | $200 | $210 | $55.00 | 12% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 380 FT | $121 | $95.30 | $82.00 | $105 | $175 | $165 | $98.00 | $200 | $225 | $450 | 11% |
| 524E95000 DRILLED SHAFTS, MISC.:LUG PILE, 36" DIAMETER, UNRE | 632.2 FT | $62.00 | $75.66 | $61.00 | $93.00 | $100 | $105 | $75.00 | $200 | $210 | $150 | 9% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 50 CY | $300 | $281 | $300 | $200 | $350 | $255 | $255 | $300 | $300 | $255 | 3% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 13 CY | $850 | $427 | $850 | $900 | $400 | $750 | $750 | $850 | $850 | $750 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 263 FT | $40.50 | $42.50 | $30.92 | $33.00 | $35.00 | $40.50 | $40.50 | $30.00 | $33.00 | $30.92 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $26,750 | $15,000 | $10,000 | $20,000 | $20,000 | $57,500 | $20,000 | $15,000 | $20,000 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1 1/2") | 308 SY | $26.00 | $8.00 | $26.00 | $26.00 | $30.00 | $25.00 | $21.25 | $26.00 | $30.00 | $29.00 | 2% |
| 253E01000 PAVEMENT REPAIR | 75 SY | $82.00 | $74.00 | $82.00 | $50.00 | $50.00 | $170 | $170 | $82.00 | $82.00 | $170 | 1% |
| 614E12420 DETOUR SIGNING | 1 LS | $6,000 | $5,685 | $8,500 | $6,000 | $7,000 | $5,000 | $5,400 | $6,970 | $15,000 | $5,400 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,700 | $1,575 | $5,000 | $2,500 | $5,000 | $4,000 | $7,215 | $5,000 | $15,000 | $4,600 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,500 | $3,500 | $6,000 | $11,000 | $3,500 | $5,000 | $3,600 | $2,500 | $2,500 | $25,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,100 | $6,620 | $6,600 | $8,000 | $10,000 | $5,500 | $7,900 | $10,000 | $18,000 | $5,000 | 1% |
| 659E10000 SEEDING AND MULCHING | 290 SY | $9.85 | $5.10 | $17.00 | $6.00 | $3.50 | $13.36 | $11.54 | $9.20 | $15.00 | $10.00 | 1% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 16 CY | $150 | $141 | $278 | $120 | $200 | $85.00 | $92.00 | $100 | $125 | $260 | 1% |
| 621E00100 RPM | 8 EACH | $300 | $442 | $292 | $259 | $350 | $292 | $281 | $345 | $650 | $420 | 1% |
| 202E98200 REMOVAL MISC.:BURIED GUARDRAIL AND GABION WALL | 204 FT | $10.00 | $10.00 | $52.00 | $20.00 | $25.00 | $90.00 | $21.65 | $50.00 | $35.00 | $35.00 | 0% |
| 642E00300 CENTER LINE, TYPE 1 | 0.04 MILE | $37,925 | $28,100 | $37,925 | $32,000 | $25,000 | $37,925 | $26,650 | $1,800 | $35,000 | $26,650 | 0% |
| 202E38000 GUARDRAIL REMOVED | 260 FT | $5.00 | $4.75 | $13.50 | $2.00 | $5.00 | $5.00 | $2.80 | $1.95 | $5.00 | $17.00 | 0% |
| 15 SY |
| $0.70 |
| $13.65 |
| $216 |
| $0.05 |
| $1.50 |
| $0.68 |
| $0.05 |
| $2.00 |
| $0.20 |
| $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.04 TON | $755 | $3,000 | $74,000 | $800 | $500 | $754 | $500 | $735 | $1,200 | $500 |
| 659E31000 LIME | 0.06 ACRE | $154 | $1,500 | $50,000 | $100 | $500 | $154 | $200 | $100 | $800 | $200 |
| 659E35000 WATER | 1.6 MGAL | $1.00 | $12.50 | $0.01 | $1.00 | $10.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 407E10000 TACK COAT | 26 GAL | $2.00 | $3.00 | $2.00 | $2.00 | $7.00 | $1.85 | $1.85 | $2.00 | $2.00 | $1.85 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 8 EACH | $24.00 | $34.00 | $382 | $1.00 | $35.00 | $50.00 | $9.80 | $10.00 | $50.00 | $70.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 28 FT | $13.00 | $26.50 | $12.00 | $15.00 | $3.00 | $12.00 | $15.00 | $15.00 | $25.00 | $12.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $50.00 | $100 | $50.00 | $75.00 | $150 | $50.00 | $50.00 | $85.00 | $195 | $50.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.04 MILE | $18,958 | $26,850 | $18,958 | $25,000 | $25,000 | $18,958 | $25,500 | $1,800 | $35,000 | $25,500 |
| 407E10000 TACK COAT | 50 GAL | $2.00 | $3.00 | $2.00 | $2.00 | $10.00 | $1.85 | $1.85 | $2.00 | $2.00 | $1.85 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $70.00 | $158 | $65.00 | $50.00 | $65.00 | $88.00 | $75.00 | $100 | $25.00 | $200 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $950 | $9,750 | $5,500 | $11,000 | $4,050 | $11,000 | $7,300 | $10,000 | $38,000 | $44,263 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.:W24X192 STEEL BEAM | 1,230 FT | $164 | $202k | 46% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 766.3 FT | $67 | $51k | 12% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 380 FT | $121 | $46k | 11% |
| 524E95000 DRILLED SHAFTS, MISC.:LUG PILE, 36" DIAMETER, UNRE | 632.2 FT | $62 | $39k | 9% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 50 CY | $300 | $15k | 3% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 13 CY | $850 | $11k | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 263 FT | $40.5 | $11k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1 1/2") | 308 SY | $26 | $8k | 2% |
| 253E01000 PAVEMENT REPAIR | 75 SY | $82 | $6k | 1% |