BRO-US 52-16.22 Slide
BRO County · est $1.3M
Bid dateThursday, February 17—
BRO County · est $1.3M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 42 more items below.
| Item | Quantity | R1Allard Excavation LLC | R2Alan Stone CO INC | R3Ohio-west Virginia Excavating CO | R4Shelly & Sands INC | R5Allied Construction, LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: TYPE 2 STEEL BEAM, FURNISHED | 1,222 FT | $129 | $135 | $120 | $127 | $110 | 16% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 1,976 FT | $59.00 | $75.00 | $86.95 | $85.00 | $147 | 12% |
| 507E00400 STEEL PILES, MISC.: TYPE 4 STEEL BEAM, FURNISHED | 474 FT | $217 | $230 | $203 | $211 | $187 | 11% |
| 507E00400 |
| Item | Quantity | R1Allard Excavation LLC | R2Alan Stone CO INC | R3Ohio-west Virginia Excavating CO | R4Shelly & Sands INC | R5Allied Construction, LLC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,500 | $8,000 | $7,000 | $4,500 | $1,000 |
| 202E30200 STEPS REMOVED | 18 FT | $12.00 | $35.00 | $34.61 | $15.00 | $4.75 |
| 202E38000 GUARDRAIL REMOVED | 626 FT | $2.30 | $2.50 | $4.96 | $2.50 | $4.75 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 2 EACH | $78.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 524 FT |
| $182 |
| $190 |
| $170 |
| $177 |
| $157 |
| 10% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 472 CY | $178 | $178 | $195 | $225 | $210 | 9% |
| 524E95000 DRILLED SHAFTS, MISC.:PLUG PILE, 36" DIAMETER, UNR | 1,455 FT | $51.00 | $50.00 | $82.41 | $85.00 | $125 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $72,000 | $20,000 | $32,500 | $40,000 | $10,000 | 7% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 932 FT | $58.00 | $55.00 | $115 | $85.00 | $125 | 6% |
| 507E00400 STEEL PILES, MISC.: TYPE 1 STEEL BEAM, FURNISHED | 663 FT | $74.00 | $76.00 | $71.08 | $73.00 | $79.00 | 5% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 535 SY | $52.00 | $39.35 | $43.19 | $62.00 | $100 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,450 FT | $12.50 | $21.00 | $26.11 | $18.00 | $16.00 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (89 CY | $203 | $203 | $223 | $265 | $218 | 2% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 74 CY | $230 | $230 | $252 | $325 | $220 | 2% |
| 304E20000 AGGREGATE BASE | 324 CY | $51.00 | $65.00 | $57.83 | $60.00 | $48.00 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 537.5 FT | $25.98 | $24.50 | $29.09 | $24.50 | $31.00 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,500 | $50,000 | $43,725 | $52,000 | $25,200 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $11,100 | $9,500 | $13,908 | $7,700 | $12,000 | 1% |
| 202E23000 PAVEMENT REMOVED | 1,963 SY | $5.50 | $11.00 | $9.88 | $15.00 | $5.00 | 1% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,900 | $2,200 | $2,630 | $2,200 | $2,100 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,800 | $7,000 | $2,470 | $13,090 | $10,000 | 1% |
| $250 |
| $311 |
| $250 |
| $200 |
| 203E10000 EXCAVATION | 333 CY | $11.00 | $19.00 | $24.05 | $27.00 | $21.00 |
| 203E20000 EMBANKMENT | 233 CY | $10.00 | $8.50 | $36.88 | $22.00 | $10.00 |
| 204E10000 SUBGRADE COMPACTION | 1,999 SY | $1.50 | $3.00 | $1.14 | $3.50 | $4.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 2 EACH | $2,400 | $2,750 | $2,689 | $2,750 | $2,725 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 5 EACH | $175 | $200 | $171 | $200 | $100 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 5 EACH | $70.00 | $50.00 | $134 | $50.00 | $100 |
| 659E00300 TOPSOIL | 117 CY | $27.60 | $24.00 | $72.63 | $40.00 | $20.00 |
| 659E10000 SEEDING AND MULCHING | 1,054 SY | $1.30 | $4.50 | $3.15 | $3.75 | $3.75 |
| 659E20000 COMMERCIAL FERTILIZER | 0.14 TON | $500 | $1,200 | $1,989 | $1,000 | $1,000 |
| 659E31000 LIME | 0.22 ACRE | $500 | $246 | $4,134 | $200 | $200 |
| 659E35000 WATER | 6 MGAL | $1.00 | $0.01 | $10.98 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 4 SY | $59.00 | $199 | $217 | $100 | $37.50 |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 493 FT | $11.50 | $18.50 | $21.75 | $14.00 | $1.16 |
| 605E12200 6" DEEP PIPE UNDERDRAINS | 493 FT | $12.00 | $19.00 | $24.59 | $17.00 | $1.16 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 92 FT | $18.20 | $43.00 | $20.29 | $25.00 | $2.59 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $250 | $307 | $286 | $300 | $108 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 10 FT | $3.00 | $15.00 | $20.46 | $3.00 | $80.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 1 1/4" | 283 SY | $22.00 | $22.00 | $24.15 | $35.00 | $8.00 |
| 407E10000 TACK COAT | 279 GAL | $7.50 | $7.50 | $8.23 | $10.00 | $7.00 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 58 SY | $65.00 | $109 | $84.94 | $150 | $130 |
| 621E00100 RPM | 6 EACH | $314 | $274 | $914 | $270 | $500 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 6 EACH | $1.50 | $15.50 | $44.53 | $35.00 | $500 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $5.75 | $20.00 | $134 | $20.00 | $25.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $5.75 | $20.00 | $134 | $20.00 | $25.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.22 MILE | $5,606 | $4,193 | $6,202 | $4,193 | $4,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.11 MILE | $7,475 | $8,390 | $11,800 | $8,390 | $4,500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $75.00 | $67.50 | $165 | $68.00 | $68.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 323 FT | $1.75 | $3.00 | $3.29 | $0.70 | $3.20 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 31 EACH | $9.20 | $42.50 | $46.65 | $8.00 | $16.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 31 EACH | $9.20 | $44.00 | $48.30 | $12.00 | $21.00 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.19 MILE | $6,470 | $13,550 | $14,874 | $13,550 | $12,100 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.22 MILE | $9,775 | $8,500 | $9,330 | $8,500 | $9,000 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.43 MILE | $6,250 | $9,165 | $10,060 | $9,165 | $8,750 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 24 FT | $2.00 | $14.00 | $15.37 | $14.00 | $10.50 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $3,000 | $10,000 | $15,308 | $12,000 | $11,720 |
| 616E10000 WATER | 1 MGAL | $1.00 | $1.00 | $10.97 | $50.00 | $1.00 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $1,200 | $500 | $3,293 | $4,000 | $1,426 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: TYPE 2 STEEL BEAM, FURNISHED | 1,222 FT | $128.5 | $157k | 15% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 1,976 FT | $59 | $117k | 11% |
| 507E00400 STEEL PILES, MISC.: TYPE 4 STEEL BEAM, FURNISHED | 474 FT | $217 | $103k | 10% |
| 507E00400 STEEL PILES, MISC.: TYPE 3 STEEL BEAM, FURNISHED | 524 FT | $182 | $95k | 9% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 472 CY | $178 | $84k | 8% |
| 524E95000 DRILLED SHAFTS, MISC.:PLUG PILE, 36" DIAMETER, UNR | 1,455 FT | $51 | $74k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $72,000 | $72k | 7% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 932 FT | $58 | $54k | 5% |
| 507E00400 STEEL PILES, MISC.: TYPE 1 STEEL BEAM, FURNISHED | 663 FT | $74 | $49k | 5% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 535 SY | $52 | $28k | 3% |