LIC-SR 13-09.54
LIC County · est $1.4M
Bid dateThursday, March 31—
LIC County · est $1.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 93 more items below.
| Item | Quantity | R1Trucco Construction CO INC | R2Shelly & Sands INC | R3Axis Civil Construction LLC | R4Wolf Creek Contracting Company LLC | R5Double Z Construction Company | R6Fabrizi Trucking & Paving CO INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 608E98000 WALKWAY, MISC.:2 1/2" CLAY BRICK PAVER | 8,966 SF | $23.99 | $20.00 | $22.50 | $25.19 | $23.50 | $30.00 | 20% |
| 304E20000 AGGREGATE BASE | 1,783 CY | $80.74 | $91.00 | $74.00 | $84.79 | $88.00 | $64.00 | 13% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 702 CY | $145 | $145 |
| Item | Quantity | R1Trucco Construction CO INC | R2Shelly & Sands INC | R3Axis Civil Construction LLC | R4Wolf Creek Contracting Company LLC | R5Double Z Construction Company | R6Fabrizi Trucking & Paving CO INC |
|---|---|---|---|---|---|---|---|
| 202E30000 WALK REMOVED | 14,959 SF | $0.54 | $0.50 | $3.00 | $2.42 | $1.75 | $1.00 |
| 202E32000 CURB REMOVED | 782 FT | $3.68 | $2.00 | $8.00 | $5.44 | $6.00 | $9.00 |
| 202E32500 CURB AND GUTTER REMOVED | 175 FT | $6.15 | $4.00 | $8.00 | $5.08 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $190 |
| $189 |
| $145 |
| $206 |
| 10% |
| 203E10000 EXCAVATION | 2,883 CY | $28.00 | $26.00 | $23.00 | $15.33 | $40.00 | $13.00 | 8% |
| 452E13011 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 547 SY | $127 | $145 | $120 | $89.33 | $110 | $155 | 6% |
| 608E98000 WALKWAY, MISC.:4" CONCRETE WALK, EXPOSED AGGREGATE | 5,422 SF | $9.53 | $10.25 | $8.50 | $8.10 | $12.00 | $15.65 | 5% |
| 605E06000 4" BASE PIPE UNDERDRAINS | 2,685 FT | $17.10 | $14.25 | $20.00 | $10.75 | $10.00 | $10.00 | 4% |
| 202E23000 PAVEMENT REMOVED | 4,880 SY | $9.00 | $6.00 | $12.00 | $4.25 | $11.00 | $13.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,000 | $102,040 | $40,000 | $56,000 | 4% |
| 611E04400 12" CONDUIT, TYPE B, 706.02, 707.65, 707.69, 707.7 | 371 FT | $101 | $99.00 | $80.00 | $68.57 | $135 | $115 | 3% |
| 452E12011 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 290 SY | $114 | $107 | $120 | $70.44 | $75.00 | $80.00 | 3% |
| 609E98000 CURB, MISC.:18" STRAIGHT CURB, PER NEWARK STD DWG | 1,296 FT | $22.47 | $35.75 | $22.00 | $25.70 | $30.00 | $20.00 | 3% |
| 661E20040 DECIDUOUS SHRUB, 2' HEIGHT (BUXUS X 'GREEN VELVET' | 162 EACH | $175 | $126 | $84.64 | $143 | $126 | $92.00 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 132 CY | $205 | $205 | $245 | $261 | $205 | $345 | 3% |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 14 SNMT | $1,843 | $850 | $1,100 | $1,816 | $1,100 | $1,190 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (132 CY | $185 | $185 | $225 | $238 | $185 | $345 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $19,100 | $27,500 | $25,000 | $14,188 | $30,000 | $15,000 | 2% |
| 625E25600 CONDUIT, 4", 725.04 | 287 FT | $64.11 | $64.25 | $64.11 | $62.43 | $55.00 | $68.00 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 7 MNTH | $2,500 | $2,750 | $2,000 | $2,484 | $1,100 | $2,200 | 2% |
| 653E10001 TOPSOIL FURNISHED AND PLACED, AS PER PLAN | 170 CY | $99.46 | $115 | $40.00 | $74.44 | $65.59 | $53.00 | 2% |
| $7.00 |
| $11.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 146 FT | $26.80 | $28.50 | $40.00 | $27.64 | $10.00 | $35.00 |
| 202E58200 INLET REMOVED | 5 EACH | $563 | $294 | $700 | $711 | $450 | $500 |
| 203E20000 EMBANKMENT | 69 CY | $27.00 | $13.00 | $23.00 | $46.11 | $15.00 | $12.00 |
| 204E10000 SUBGRADE COMPACTION | 4,606 SY | $2.86 | $3.00 | $2.50 | $1.48 | $2.75 | $2.00 |
| 608E52000 CURB RAMP | 600 SF | $25.91 | $25.00 | $16.00 | $16.61 | $30.00 | $22.00 |
| 608E53020 DETECTABLE WARNING | 256 SF | $33.78 | $39.00 | $18.00 | $34.17 | $32.00 | $18.00 |
| 608E98000 WALKWAY, MISC.:4" CONCRETE WALK, BROOM FINISH | 1,923 SF | $6.32 | $8.25 | $7.00 | $6.77 | $9.50 | $7.50 |
| 690E98100 SPECIAL - ITEM SPECIAL - PAVER EDGE RESTRAINT | 136 FT | $39.00 | $59.00 | $60.00 | $26.55 | $58.80 | $65.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $1,588 | $1,575 | $1,703 | $1,500 | $1,850 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $1,000 | $3,440 | $9,000 | $3,689 | $12,000 | $6,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $4,581 | $4,850 | $4,581 | $6,209 | $20,000 | $5,000 |
| 832E30000 EROSION CONTROL | 7,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98150 CATCH BASIN, NO. 3 | 2 EACH | $4,583 | $4,100 | $4,900 | $4,378 | $4,600 | $5,365 |
| 611E98180 CATCH BASIN, NO. 3A | 5 EACH | $3,364 | $3,375 | $3,500 | $3,283 | $3,300 | $4,075 |
| 611E98370 CATCH BASIN, NO. 6 | 1 EACH | $3,131 | $3,200 | $3,600 | $3,108 | $3,400 | $3,860 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $836 | $1,400 | $1,100 | $143 | $1,000 | $850 |
| 611E99650 MANHOLE FRAME AND COVER | 1 EACH | $791 | $475 | $1,600 | $826 | $900 | $650 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 7 EACH | $836 | $2,030 | $1,400 | $552 | $1,100 | $650 |
| 613E41201 LOW STRENGTH MORTAR BACKFILL, AS PER PLAN | 25 CY | $99.81 | $104 | $125 | $127 | $120 | $100 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 190 FT | $2.89 | $3.00 | $6.00 | $5.68 | $3.00 | $3.00 |
| 407E10000 TACK COAT | 316 GAL | $2.00 | $2.00 | $3.50 | $2.27 | $2.00 | $2.70 |
| 452E12011 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 63 SY | $204 | $243 | $138 | $117 | $150 | $166 |
| 609E98000 CURB, MISC.:COMBINATION CURB AND GUTTER TYPE STAND | 590 FT | $22.25 | $52.00 | $32.00 | $36.37 | $32.00 | $34.00 |
| 609E98000 CURB, MISC.:CONCRETE MOUNTABLE TRUCK APRON CURB | 245 FT | $20.74 | $31.75 | $32.00 | $30.50 | $30.00 | $56.00 |
| 609E98000 CURB, MISC.:DROPPED CURB | 226 FT | $27.17 | $60.00 | $32.00 | $30.29 | $40.00 | $56.00 |
| 638E10400 FIRE HYDRANT ADJUSTED TO GRADE | 1 EACH | $1,381 | $1,275 | $1,000 | $1,578 | $950 | $350 |
| 638E10500 FIRE HYDRANT REMOVED AND RESET | 1 EACH | $3,600 | $3,500 | $4,000 | $1,249 | $3,800 | $350 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 9 EACH | $203 | $865 | $425 | $79.58 | $300 | $450 |
| 625E00450 CONNECTION, FUSED PULL APART | 20 EACH | $78.22 | $78.50 | $78.22 | $114 | $100 | $84.00 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 31 EACH | $82.66 | $82.75 | $82.66 | $114 | $100 | $88.00 |
| 625E10502 LIGHT POLE (INSTALLATION ONLY) | 10 EACH | $424 | $424 | $424 | $1,022 | $900 | $453 |
| 625E14501 LIGHT POLE FOUNDATION, AS PER PLAN | 10 EACH | $1,456 | $1,456 | $1,456 | $2,264 | $1,995 | $1,556 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 3,480 FT | $3.08 | $4.00 | $3.08 | $4.54 | $4.00 | $3.30 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 414 FT | $6.75 | $6.75 | $6.75 | $2.27 | $2.00 | $7.25 |
| 625E25400 CONDUIT, 2", 725.04 | 562 FT | $28.12 | $28.25 | $28.12 | $26.11 | $23.00 | $30.00 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 418 FT | $0.96 | $1.00 | $0.96 | $0.57 | $0.50 | $1.05 |
| 625E27560 LUMINAIRE, INSTALLATION ONLY | 10 EACH | $150 | $150 | $150 | $170 | $150 | $161 |
| 625E29000 TRENCH | 821 FT | $4.03 | $4.25 | $4.03 | $13.62 | $12.00 | $4.30 |
| 625E29400 TRENCH IN PAVED AREA | 28 FT | $27.24 | $27.25 | $27.24 | $37.46 | $33.00 | $30.00 |
| 625E30510 PULL BOX, 725.06, SIZE 4 | 11 EACH | $757 | $757 | $757 | $1,050 | $925 | $810 |
| 625E31510 PULL BOX REMOVED | 2 EACH | $212 | $212 | $212 | $227 | $200 | $227 |
| 625E31511 PULL BOX REMOVED, AS PER PLAN | 8 EACH | $212 | $212 | $212 | $227 | $200 | $227 |
| 625E32000 GROUND ROD | 11 EACH | $362 | $363 | $362 | $318 | $280 | $388 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $8,162 | $8,162 | $8,162 | $10,082 | $8,883 | $8,735 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 849 FT | $0.31 | $0.50 | $0.31 | $2.04 | $1.80 | $0.35 |
| 625E39520 PULL BOX CLEANED | 1 EACH | $100 | $100 | $100 | $142 | $125 | $110 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $3,000 | $3,000 | $3,000 | $7,086 | $3,600 | $3,210 |
| 625E75520 LUMINAIRE SUPPORT REMOVED | 2 EACH | $300 | $300 | $300 | $284 | $250 | $325 |
| 625E75522 LUMINAIRE SUPPORT FOUNDATION REMOVED | 2 EACH | $206 | $206 | $206 | $170 | $150 | $220 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 473.1 FT | $18.50 | $16.00 | $18.50 | $18.16 | $18.50 | $20.00 |
| 630E08600 SIGN POST REFLECTOR (RED) | 8 EACH | $45.00 | $50.00 | $45.00 | $56.75 | $45.00 | $49.00 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 2 EACH | $150 | $190 | $150 | $216 | $150 | $162 |
| 630E80100 SIGN, FLAT SHEET | 199 SF | $25.00 | $19.60 | $25.00 | $22.25 | $25.00 | $27.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $25.00 | $15.00 | $25.00 | $17.03 | $25.00 | $27.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 5 EACH | $25.00 | $20.00 | $25.00 | $22.70 | $25.00 | $27.00 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 6 EACH | $150 | $105 | $150 | $119 | $150 | $165 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 15 EACH | $25.00 | $15.00 | $25.00 | $17.03 | $25.00 | $27.00 |
| 644E00100 EDGE LINE, 4", WHITE | 0.17 MILE | $5,365 | $5,365 | $5,365 | $6,089 | $5,365 | $5,800 |
| 644E00300 CENTER LINE | 0.08 MILE | $9,933 | $9,933 | $9,933 | $11,274 | $9,933 | $10,728 |
| 644E00501 STOP LINE, AS PER PLAN | 136 FT | $4.20 | $4.20 | $4.20 | $4.77 | $4.20 | $4.55 |
| 644E00620 CROSSWALK LINE, 12" | 291 FT | $3.80 | $3.80 | $3.80 | $4.31 | $3.80 | $4.10 |
| 644E00700 TRANSVERSE/DIAGONAL LINE, YELLOW | 51 FT | $7.10 | $7.10 | $7.10 | $8.06 | $7.10 | $8.00 |
| 644E00900 ISLAND MARKING | 14 SF | $3.30 | $3.30 | $3.30 | $344 | $3.30 | $3.75 |
| 644E01200 PARKING LOT STALL MARKING | 862 FT | $2.25 | $2.25 | $2.25 | $2.55 | $2.25 | $2.45 |
| 644E01300 LANE ARROW | 4 EACH | $140 | $140 | $140 | $159 | $140 | $155 |
| 644E01600 HANDICAP SYMBOL MARKING | 1 EACH | $110 | $110 | $110 | $125 | $110 | $120 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 609 FT | $3.15 | $3.15 | $3.15 | $3.58 | $3.15 | $3.50 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 1 EACH | $110 | $110 | $110 | $125 | $110 | $120 |
| 644E30030 REMOVAL OF PAVEMENT MARKING | 0.06 MILE | $9,900 | $9,900 | $9,900 | $11,237 | $9,900 | $10,700 |
| 646E20201 PARKING LOT STALL MARKING, AS PER PLAN | 64 FT | $25.00 | $25.00 | $25.00 | $28.38 | $25.00 | $28.00 |
| 647E20112 TRANSVERSE/DIAGONAL LINE, TYPE B125, AS PER PLAN | 240 FT | $17.40 | $17.40 | $17.40 | $19.75 | $17.40 | $19.00 |
| 625E30530 PULL BOX, 725.06, SIZE 18 | 1 EACH | $1,786 | $2,100 | $1,786 | $2,384 | $2,100 | $1,925 |
| 625E31507 PULL BOX REMOVED AND REPLACED, AS PER PLAN | 1 EACH | $2,286 | $1,200 | $2,286 | $1,362 | $1,200 | $2,450 |
| 632E90030 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM (FIBE | 129 FT | $11.63 | $1.20 | $11.63 | $1.36 | $1.20 | $12.50 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $5,000 | $4,500 | $5,000 | $5,108 | $4,500 | $5,350 |
| 804E35000 FUSION SPLICE | 12 EACH | $120 | $105 | $120 | $119 | $105 | $130 |
| 804E37000 SPLICE ENCLOSURE, BUTT STYLE | 1 EACH | $3,600 | $1,600 | $3,600 | $1,816 | $1,600 | $3,850 |
| 661E00501 MULCH, AS PER PLAN | 26 CY | $82.00 | $109 | $67.98 | $182 | $108 | $74.00 |
| 661E12100 GROUND COVER AND VINES, 1 YEAR, FLAT (EUONYMUS FOR | 162 EACH | $6.50 | $1.90 | $8.61 | $2.16 | $1.90 | $9.30 |
| 661E12100 GROUND COVER AND VINES, 1 YEAR, FLAT (VINCA MINOR) | 288 EACH | $6.50 | $1.90 | $8.77 | $2.16 | $1.90 | $9.50 |
| 661E14000 PERENNIALS (HEMEROCALIS X 'STELL DE ORO') | 27 EACH | $22.00 | $19.22 | $24.74 | $21.81 | $19.22 | $27.00 |
| 661E14000 PERENNIALS (LIRIOPE MUSCARI 'BIG BLUE') | 88 EACH | $22.00 | $18.13 | $24.74 | $20.58 | $18.13 | $27.00 |
| 661E14000 PERENNIALS (NEPETA FAASSENII X 'WALKERS LOW') | 66 EACH | $24.00 | $19.41 | $24.74 | $22.03 | $19.41 | $27.00 |
| 661E40140 DECIDUOUS TREE, 4" CALIPER (ULMUS X 'FRONTIER') | 9 EACH | $930 | $1,271 | $1,187 | $1,443 | $1,271 | $1,282 |
| 690E98000 SPECIAL - ITEM SPECIAL - BOLLARD WITH CHAIN, INSTA | 37 EACH | $266 | $679 | $550 | $770 | $600 | $950 |
| 690E98000 SPECIAL -BIORETENTION PLANTING AREA | 5 EACH | $3,000 | $5,000 | $3,000 | $1,810 | $5,000 | $1,885 |
| 614E12421 DETOUR SIGNING, AS PER PLAN | 1 LS | $16,125 | $11,000 | $15,000 | $8,796 | $20,000 | $16,200 |
| 616E10000 WATER | 30 MGAL | $80.11 | $40.00 | $1.00 | $11.35 | $50.00 | $10.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,982 | $13,800 | $12,000 | $12,418 | $15,000 | $10,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,000 | $10,500 | $18,000 | $52,607 | $10,000 | $4,350 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 608E98000 WALKWAY, MISC.:2 1/2" CLAY BRICK PAVER | 8,966 SF | $23.99 | $215k | 15% |
| 304E20000 AGGREGATE BASE | 1,783 CY | $80.74 | $144k | 10% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 702 CY | $145 | $102k | 7% |
| 203E10000 EXCAVATION | 2,883 CY | $28 | $81k | 6% |
| 452E13011 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 547 SY | $127.06 | $70k | 5% |
| 608E98000 WALKWAY, MISC.:4" CONCRETE WALK, EXPOSED AGGREGATE | 5,422 SF | $9.53 | $52k | 4% |
| 605E06000 4" BASE PIPE UNDERDRAINS | 2,685 FT | $17.1 | $46k | 3% |
| 202E23000 PAVEMENT REMOVED | 4,880 SY | $9 | $44k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 611E04400 12" CONDUIT, TYPE B, 706.02, 707.65, 707.69, 707.7 | 371 FT | $100.8 | $37k | 3% |