STA-US 62-05.10 SRTS
STA County · est $0.3M
Bid dateThursday, April 14—
STA County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 41 more items below.
| Item | Quantity | R1Digioia-suburban Excavating LLC | R2Madex Construction CO | R3Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 1,216 CY | $32.00 | $23.53 | $8.00 | 15% |
| 823E15000 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (74 CY | $375 | $395 | $445 | 10% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $25,500 | $12,341 | $14,000 | 10% |
| 659E00300 TOPSOIL | 545 CY | $40.00 | $57.53 | $73.00 | 8% |
| 823E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | 53 CY | $375 | $395 | $565 |
| Item | Quantity | R1Digioia-suburban Excavating LLC | R2Madex Construction CO | R3Eclipse CO LLC |
|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 35 SY | $18.00 | $21.08 | $25.00 |
| 202E32000 CURB REMOVED | 15 FT | $14.00 | $25.45 | $11.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $1,200 | $764 | $429 |
| 202E98100 REMOVAL MISC.: POST | 1 EACH | $65.00 | $382 | $224 |
| 204E13000 EXCAVATION OF SUBGRADE | 100 CY | $15.00 | $24.59 | $33.00 |
| 204E45000 PROOF ROLLING | 1 HOUR |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 7% |
| 304E20000 AGGREGATE BASE | 302 CY | $55.00 | $88.69 | $60.00 | 6% |
| 203E10000 EXCAVATION | 510 CY | $25.00 | $25.81 | $32.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $29,831 | $28,938 | 5% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $11,900 | $9,726 | $10,000 | 4% |
| 832E30000 EROSION CONTROL | 11,000 EACH | $1.00 | $1.00 | $1.00 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $12,699 | $17,976 | 4% |
| 670E00500 SLOPE EROSION PROTECTION | 1,412 SY | $7.00 | $7.82 | $1.00 | 4% |
| 659E10000 SEEDING AND MULCHING | 3,499 SY | $2.80 | $3.07 | $1.85 | 4% |
| 204E10000 SUBGRADE COMPACTION | 2,229 SY | $3.00 | $3.10 | $1.00 | 3% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $6,500 | $6,000 | $6,500 | 2% |
| 658E10000 TREE ROOT AERATION | 29 CY | $210 | $126 | $110 | 2% |
| 608E52000 CURB RAMP | 403 SF | $15.00 | $23.90 | $15.00 | 2% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 100 CY | $45.00 | $71.67 | $58.00 | 2% |
| 608E10000 4" CONCRETE WALK | 666 SF | $6.00 | $9.67 | $8.50 | 2% |
| 657E10000 RIPRAP FOR TREE PROTECTION | 67 SY | $55.00 | $276 | $45.00 | 1% |
| $250 |
| $305 |
| $258 |
| 204E50000 GEOTEXTILE FABRIC | 58 SY | $3.00 | $13.71 | $2.00 |
| 607E30001 FENCE, SNOW, AS PER PLAN | 500 FT | $3.50 | $4.96 | $8.00 |
| 607E35000 FENCE REMOVED AND REBUILT | 55 FT | $35.00 | $54.43 | $65.00 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 44 EACH | $80.00 | $122 | $1,300 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 2 EACH | $200 | $223 | $178 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 1 EACH | $300 | $563 | $178 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION | 1 LS | $2,500 | $3,126 | $4,000 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $220 | $289 | $105 |
| 659E14000 REPAIR SEEDING AND MULCHING | 175 SY | $0.75 | $0.81 | $1.85 |
| 659E15000 INTER-SEEDING | 175 SY | $0.75 | $0.81 | $0.11 |
| 659E20000 COMMERCIAL FERTILIZER | 0.49 TON | $1,050 | $1,148 | $263 |
| 659E31000 LIME | 0.72 ACRE | $320 | $344 | $26.00 |
| 659E35000 WATER | 19 MGAL | $5.00 | $18.53 | $0.26 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,500 | $3,529 | $866 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $3,500 | $9,842 | $4,400 |
| 611E01200 6" CONDUIT, TYPE D | 96 FT | $23.50 | $22.96 | $28.00 |
| 611E04600 12" CONDUIT, TYPE C | 59 FT | $46.00 | $61.01 | $62.00 |
| 611E04900 12" CONDUIT, TYPE D | 49 FT | $45.00 | $51.42 | $125 |
| 611E07600 18" CONDUIT, TYPE C | 7 FT | $105 | $254 | $64.00 |
| 611E10600 24" CONDUIT, TYPE C | 11 FT | $159 | $185 | $81.00 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $1,750 | $2,356 | $2,341 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $3,620 | $3,287 | $4,657 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $350 | $1,053 | $622 |
| 407E10000 TACK COAT | 151 GAL | $3.00 | $3.47 | $5.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 24 CY | $133 | $129 | $146 |
| 609E26000 CURB, TYPE 6 | 91 FT | $31.00 | $42.20 | $54.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 60 FT | $14.00 | $18.53 | $22.00 |
| 630E80100 SIGN, FLAT SHEET | 48 SF | $48.00 | $37.05 | $44.00 |
| 646E10010 EDGE LINE, 6" | 0.02 MILE | $3,120 | $11,579 | $8,600 |
| 646E10510 CROSSWALK LINE, 12" | 203 FT | $9.00 | $11.58 | $12.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 277 FT | $10.00 | $13.89 | $13.00 |
| 614E12460 WORK ZONE MARKING SIGN | 5 EACH | $116 | $139 | $156 |
| 616E10000 WATER | 7 MGAL | $5.00 | $29.56 | $22.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $11,174 | $7,000 |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $900 | $550 | $683 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 1,216 CY | $32 | $39k | 12% |
| 823E15000 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (74 CY | $375 | $28k | 9% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $25,500 | $26k | 8% |
| 659E00300 TOPSOIL | 545 CY | $40 | $22k | 7% |
| 823E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | 53 CY | $375 | $20k | 6% |
| 304E20000 AGGREGATE BASE | 302 CY | $55 | $17k | 5% |
| 203E10000 EXCAVATION | 510 CY | $25 | $13k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $12k | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $11,900 | $12k | 4% |
| 832E30000 EROSION CONTROL | 11,000 EACH | $1 | $11k | 3% |