CUY-Mayfield Hts TLCI
CUY County · est $0.3M
Bid dateThursday, April 28—
CUY County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 46 more items below.
| Item | Quantity | R1Cook Paving & Construction CO INC | R2Perk Company INC | % of bid |
|---|---|---|---|---|
| 608E52000 CURB RAMP | 3,417 SF | $21.00 | $29.00 | 24% |
| 608E10000 4" CONCRETE WALK | 4,632 SF | $6.00 | $15.00 | 9% |
| 451E13010 8" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 313 SY | $84.00 | $150 | 9% |
| 609E26000 CURB, TYPE 6 | 563 FT | $41.50 | $60.00 | 8% |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 2,900 FT | $5.50 | $5.00 | 5% |
| 644E00631 CROSSWALK LINE, 24", AS PER PLAN | 1,340 FT | $9.00 | $8.00 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,000 | $35,000 | 4% |
| 202E30000 WALK REMOVED | 4,069 SF | $2.75 |
| Item | Quantity | R1Cook Paving & Construction CO INC | R2Perk Company INC |
|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $4,000 | $1,000 |
| 202E20010 HEADWALL REMOVED | 1 EACH | $450 | $550 |
| 203E10000 EXCAVATION | 47 CY | $53.00 | $75.00 |
| 203E20000 EMBANKMENT | 11 CY | $58.00 | $80.00 |
| 204E10000 SUBGRADE COMPACTION | 313 SY | $4.00 | $2.00 |
| 611E99700 SPECIAL - GAS VALVE BOX ADJUSTED TO GRADE | 5 EACH | $250 | $275 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 1 EACH | $250 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $2.75 |
| 4% |
| 632E64020 PEDESTAL FOUNDATION | 10 EACH | $1,100 | $950 | 4% |
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 72 SY | $150 | $250 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $15,000 | 3% |
| 644E00621 CROSSWALK LINE, 12", AS PER PLAN | 1,860 FT | $4.50 | $4.00 | 3% |
| 202E23000 PAVEMENT REMOVED | 316 SY | $24.00 | $25.00 | 3% |
| 832E30000 EROSION CONTROL | 7,500 EACH | $1.00 | $1.00 | 3% |
| 644E30010 REMOVAL OF PAVEMENT MARKING | 2,287 SF | $3.25 | $3.00 | 3% |
| 202E32000 CURB REMOVED | 624 FT | $11.00 | $9.15 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,500 | $3,000 | 2% |
| 659E00300 TOPSOIL | 91 CY | $70.00 | $60.00 | 2% |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 4 EACH | $1,500 | $1,400 | 2% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 53 SY | $110 | $180 | 2% |
| $1,500 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 815 SY | $3.00 | $4.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.11 TON | $600 | $600 |
| 659E35000 WATER | 5 MGAL | $12.00 | $10.00 |
| 602E20000 CONCRETE MASONRY | 0.2 CY | $4,000 | $20,000 |
| 611E04600 12" CONDUIT, TYPE C | 25 FT | $55.00 | $120 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $1,000 | $2,000 |
| 304E20000 AGGREGATE BASE | 35 CY | $110 | $100 |
| 609E14000 CURB, TYPE 2-A | 61 FT | $36.00 | $62.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 28.7 FT | $18.00 | $15.00 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $75.00 | $65.00 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 4 EACH | $65.00 | $55.00 |
| 630E80100 SIGN, FLAT SHEET | 20.9 SF | $20.00 | $18.00 |
| 630E84600 GROUND MOUNTED PIPE SUPPORT FOUNDATION | 2 EACH | $1,000 | $850 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $35.00 | $30.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $100 | $85.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $40.00 | $35.00 |
| 630E86274 REMOVAL OF GROUND MOUNTED PIPE SUPPORT AND REERECT | 2 EACH | $1,800 | $1,500 |
| 644E00500 STOP LINE | 487 FT | $9.00 | $8.00 |
| 644E01300 LANE ARROW | 4 EACH | $135 | $125 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 4 EACH | $120 | $100 |
| 625E25400 CONDUIT, 2", 725.04 | 180 FT | $26.00 | $25.00 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 2" | 17 FT | $115 | $95.00 |
| 625E29000 TRENCH | 163 FT | $18.00 | $15.00 |
| 625E30700 PULL BOX, 725.08, 18" | 2 EACH | $1,000 | $900 |
| 625E32000 GROUND ROD | 10 EACH | $400 | $350 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 180 FT | $2.50 | $2.50 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 2 EACH | $720 | $625 |
| 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN | 10 EACH | $300 | $275 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 1,035 FT | $2.50 | $2.25 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 1,775 FT | $1.75 | $1.55 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 2 EACH | $500 | $4,560 |
| 632E89802 PEDESTAL, 5', TRANSFORMER BASE | 4 EACH | $700 | $600 |
| 632E89900 PEDESTAL, 8', TRANSFORMER BASE | 6 EACH | $900 | $800 |
| 632E90203 REUSE OF PEDESTRIAN SIGNAL HEAD, AS PER PLAN | 4 EACH | $350 | $300 |
| 632E90211 REUSE OF PEDESTRIAN PUSHBUTTON, AS PER PLAN | 6 EACH | $200 | $175 |
| 632E90400 SIGNALIZATION, MISC.: SIGNAL SUPPORT FOUNDATION MO | 1 EACH | $4,000 | $3,500 |
| 633E99000 CONTROLLER ITEM, MISC.: CONTROLLER MODIFICATIONS | 1 EACH | $4,000 | $3,500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $75.00 | $75.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 608E52000 CURB RAMP | 3,417 SF | $21 | $72k | 19% |
| 608E10000 4" CONCRETE WALK | 4,632 SF | $6 | $28k | 7% |
| 451E13010 8" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 313 SY | $84 | $26k | 7% |
| 609E26000 CURB, TYPE 6 | 563 FT | $41.5 | $23k | 6% |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 2,900 FT | $5.5 | $16k | 4% |
| 644E00631 CROSSWALK LINE, 24", AS PER PLAN | 1,340 FT | $9 | $12k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,000 | $12k | 3% |
| 202E30000 WALK REMOVED | 4,069 SF | $2.75 | $11k | 3% |
| 632E64020 PEDESTAL FOUNDATION | 10 EACH | $1,100 | $11k | 3% |
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 72 SY | $150 | $11k | 3% |