D01-Erosion Repair FY23
D01 County · est $2.7M
Bid dateThursday, December 1—
D01 County · est $2.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 56 more items below.
| Item | Quantity | R1Smith Paving & Excavating INC | R2Eclipse CO LLC | % of bid |
|---|---|---|---|---|
| 452E14111 11" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 5,035 SY | $94.00 | $185 | 17% |
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 2,028 SY | $216 | $376 | 16% |
| 255E10010 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 2,069 SY | $168 | $366 | 12% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 9,900 FT | $26.50 | $38.00 | 9% |
| 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN | 8,287.5 FT | $25.80 | $28.10 | 8% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $120,000 | $64,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $113,000 | $106,166 | 4% |
| 611E98151 CATCH BASIN, NO. 3, AS PER PLAN | 16 EACH | $6,200 | $5,781 | 4% |
| 690E98000 SPECIAL - INSTALLATION OF DEFORMED BAR (CROSS STI | 1,038 EACH | $85.00 | $166 | 3% |
| 304E20000 AGGREGATE BASE | 903 CY | $95.00 | $150 | 3% |
| 611E06700 15" CONDUIT, TYPE F, 707.05 TYPE C OR 707.21 | 374 FT | $225 | $113 | 3% |
| 202E32000 CURB REMOVED | 7,820 FT | $9.50 | $4.00 | 3% |
| 609E23000 COMBINATION CURB AND GUTTER, TYPE 4 | 2,166 FT | $32.20 | $62.00 | 2% |
| 832E30000 EROSION CONTROL | 60,000 EACH | $1.00 | $1.00 | 2% |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 420 SY | $135 | $94.00 | 2% |
| 252E01500 FULL DEPTH PAVEMENT SAWING (17" THICK) | 9,751 FT | $5.80 | $4.00 | 2% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 5,293 SY | $9.00 | $46.00 | 2% |
| 659E00300 TOPSOIL | 475 CY | $76.00 | $91.00 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $35,500 | $12,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $35,000 | $49,000 | 1% |
| Item | Quantity | R1Smith Paving & Excavating INC | R2Eclipse CO LLC |
|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 313 SY | $8.00 | $43.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 92 FT | $39.00 | $36.00 |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 9,487.5 FT | $1.60 | $3.00 |
| 202E38201 GUARDRAIL REMOVED FOR REUSE, AS PER PLAN | 293.75 FT | $2.40 | $4.00 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 2 EACH | $125 | $123 |
| 202E58101 CATCH BASIN REMOVED, AS PER PLAN | 10 EACH | $500 | $286 |
| 202E98100 REMOVAL MISC.:PRECAST CONCRETE OUTLET | 2 EACH |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $500 |
| $188 |
| 203E10000 EXCAVATION | 79 CY | $60.00 | $32.00 |
| 203E20000 EMBANKMENT | 315 CY | $65.20 | $42.00 |
| 204E10000 SUBGRADE COMPACTION | 763 SY | $3.00 | $1.00 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 87 STA | $45.00 | $66.30 |
| 606E13001 GUARDRAIL, TYPE 5, AS PER PLAN | 125 FT | $23.20 | $25.00 |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 575 FT | $23.60 | $25.50 |
| 606E16501 GUARDRAIL REBUILT, TYPE 5, AS PER PLAN | 293.75 FT | $31.60 | $63.75 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B (MASH 2016) | 1 EACH | $2,295 | $2,142 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 4 EACH | $2,865 | $2,652 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T (MASH 2016) | 3 EACH | $1,340 | $1,377 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 4 EACH | $2,980 | $2,550 |
| 606E35010 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 1 | 2 EACH | $885 | $1,785 |
| 606E35103 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2, AS PER PLAN | 1 EACH | $545 | $510 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 94 FT | $242 | $344 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 5 EACH | $4,050 | $11,072 |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 3 EACH | $4,300 | $11,072 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 10 SY | $150 | $341 |
| 659E00100 SOIL ANALYSIS TEST | 4 EACH | $150 | $214 |
| 659E10000 SEEDING AND MULCHING | 6,295 SY | $1.60 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 300 SY | $3.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.87 TON | $2,000 | $1,609 |
| 659E31000 LIME | 1.27 ACRE | $1,800 | $214 |
| 659E35000 WATER | 35 MGAL | $10.00 | $1.00 |
| 670E00530 SLOPE EROSION PROTECTION MAT, TYPE C | 3,667 SY | $2.50 | $3.00 |
| 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS | 50 FT | $19.50 | $28.00 |
| 605E31100 AGGREGATE DRAINS | 50 FT | $17.00 | $39.00 |
| 611E05200 12" CONDUIT, TYPE F | 50 FT | $45.00 | $73.00 |
| 611E05200 12" CONDUIT, TYPE F, 707.05 TYPE C OR 707.21 | 60 FT | $215 | $109 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 5 EACH | $600 | $547 |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 116 CY | $200 | $198 |
| 252E01500 FULL DEPTH PAVEMENT SAWING (11" THICK) | 7,385 FT | $3.30 | $2.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING (9" THICK) | 329 FT | $2.70 | $2.00 |
| 423E00150 CRACK SEALING, TYPE IV | 777 LB | $18.00 | $17.00 |
| 452E13011 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 66 SY | $146 | $295 |
| 618E40200 RUMBLE STRIPS, SHOULDER (CONCRETE) | 5,448 FT | $4.50 | $7.00 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 6 EACH | $75.00 | $116 |
| 621E00100 RPM | 32 EACH | $135 | $118 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (1-WAY) | 4 EACH | $11.25 | $11.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (1-WAY) | 16 EACH | $12.00 | $11.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 95 EACH | $12.00 | $11.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.96 MILE | $3,000 | $9,772 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $200 | $70.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,200 | $3,185 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $192 | $536 |
| 614E12600 REPLACEMENT DRUM | 5 EACH | $150 | $268 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 200 EACH | $12.00 | $17.00 |
| 614E13350 OBJECT MARKER, ONE WAY, ONE-WAY | 200 EACH | $17.00 | $25.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $950 | $1,520 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,000 | $24,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 452E14111 11" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 5,035 SY | $94 | $473k | 15% |
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 2,028 SY | $216 | $438k | 14% |
| 255E10010 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 2,069 SY | $168 | $348k | 11% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 9,900 FT | $26.5 | $262k | 8% |
| 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN | 8,287.5 FT | $25.8 | $214k | 7% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $120,000 | $120k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $113,000 | $113k | 4% |
| 611E98151 CATCH BASIN, NO. 3, AS PER PLAN | 16 EACH | $6,200 | $99k | 3% |
| 690E98000 SPECIAL - INSTALLATION OF DEFORMED BAR (CROSS STI | 1,038 EACH | $85 | $88k | 3% |
| 304E20000 AGGREGATE BASE | 903 CY | $95 | $86k | 3% |