COL-East Lincoln St Conn Trail
COL County · est $1.0M
Bid dateThursday, December 15—
COL County · est $1.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 45 more items below.
| Item | Quantity | R1Marucci & Gaffney Excavating CO | R2Mike Pusateri Excavating INC | R3Eclipse CO LLC | R4Digioia-suburban Excavating LLC | R5Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 4,663 CY | $24.00 | $20.00 | $20.00 | $48.00 | $32.00 | 13% |
| 304E20000 AGGREGATE BASE | 1,184 CY | $80.00 | $68.00 | $88.00 | $65.00 | $80.00 | 11% |
| 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN | 1,466 CY | $56.00 | $67.00 | $63.00 | $55.00 | $62.00 | 9% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (264 CY | $301 | $317 | $200 | $335 | $200 | 9% |
| 659E00300 TOPSOIL | 1,463 CY | $46.00 | $40.00 | $53.00 | $40.00 | $52.00 | 8% |
| 441E70000 |
| Item | Quantity | R1Marucci & Gaffney Excavating CO | R2Mike Pusateri Excavating INC | R3Eclipse CO LLC | R4Digioia-suburban Excavating LLC | R5Shelly & Sands INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $9,000 | $34,000 | $32,000 | $10,500 | $15,000 |
| 202E23000 PAVEMENT REMOVED | 832 SY | $5.00 | $12.00 | $5.00 | $16.50 | $8.00 |
| 202E32000 CURB REMOVED | 27 FT | $10.00 | $13.00 | $15.00 | $8.00 | $19.00 |
| 204E13001 EXCAVATION OF SUBGRADE, AS PER PLAN |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 189 CY |
| $344 |
| $362 |
| $260 |
| $380 |
| $260 |
| 7% |
| 832E30000 EROSION CONTROL | 62,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 7% |
| 530E00600 SPECIAL - STRUCTURES: BOARDWALK WITH RAIL | 558 SF | $90.95 | $104 | $144 | $90.00 | $146 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $11,880 | $38,654 | $42,000 | $40,000 | 5% |
| 607E98000 FENCE, MISC.: WOOD FENCE | 877 FT | $43.50 | $47.00 | $47.00 | $48.00 | $46.00 | 4% |
| 203E10000 EXCAVATION | 1,664 CY | $18.75 | $17.00 | $15.00 | $25.00 | $27.00 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $3,500 | $30,000 | $15,500 | $20,000 | 3% |
| 530E50030 SPECIAL - RETAINING WALL: HEAVY TIMBER RETAINING W | 1 LS | $22,000 | $29,000 | $19,763 | $35,000 | $52,000 | 2% |
| 630E97700 SIGNING, MISC.:SOLAR POWERED RRFB SIGN ASSEMBLY | 4 EACH | $5,150 | $6,450 | $6,953 | $6,000 | $5,530 | 2% |
| 611E98700 INLET, SIDE DITCH | 5 EACH | $3,400 | $1,500 | $4,155 | $2,600 | $2,745 | 2% |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $288 | $303 | $600 | $320 | $600 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $15,000 | $16,000 | $15,000 | $26,500 | $18,000 | 2% |
| 608E52000 CURB RAMP | 393 SF | $35.00 | $25.00 | $21.00 | $28.00 | $26.00 | 2% |
| 659E10000 SEEDING AND MULCHING | 13,176 SY | $1.00 | $0.71 | $0.65 | $0.75 | $1.00 | 1% |
| 204E10000 SUBGRADE COMPACTION | 8,723 SY | $1.50 | $1.50 | $1.00 | $1.75 | $4.00 | 1% |
| 1,466 CY |
| $5.00 |
| $17.00 |
| $27.00 |
| $28.00 |
| $20.00 |
| 204E45000 PROOF ROLLING | 3 HOUR | $100 | $195 | $265 | $200 | $230 |
| 204E50000 GEOTEXTILE FABRIC | 1,466 SY | $1.00 | $2.00 | $1.00 | $2.50 | $7.00 |
| 608E10000 4" CONCRETE WALK | 69 SF | $15.00 | $11.00 | $35.00 | $24.00 | $15.00 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $395 | $395 | $261 | $200 | $539 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 37 CY | $105 | $150 | $113 | $120 | $187 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $5.00 | $110 | $103 | $115 | $105 |
| 659E14000 REPAIR SEEDING AND MULCHING | 659 SY | $0.10 | $0.86 | $0.79 | $1.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 1.84 TON | $500 | $892 | $812 | $875 | $870 |
| 659E31000 LIME | 2.72 ACRE | $50.00 | $170 | $2.75 | $175 | $165 |
| 659E35000 WATER | 73 MGAL | $0.10 | $1.00 | $77.00 | $1.20 | $1.00 |
| 670E00550 SLOPE EROSION PROTECTION MAT, TYPE E | 2,670 SY | $2.50 | $3.70 | $2.49 | $2.80 | $3.00 |
| 670E00750 DITCH EROSION PROTECTION MAT, TYPE E | 1,496 SY | $3.00 | $2.70 | $2.49 | $2.80 | $3.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $3,000 | $3,789 | $5,500 | $1,580 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $4,600 | $5,000 | $15,154 | $800 | $9,800 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $10,200 | $10,000 | $10,645 | $12,500 | $10,900 |
| 602E20000 CONCRETE MASONRY | 0.4 CY | $5,500 | $2,000 | $2,162 | $4,800 | $3,450 |
| 611E04900 12" CONDUIT, TYPE D | 29 FT | $75.00 | $140 | $88.00 | $75.00 | $73.00 |
| 611E06400 15" CONDUIT, TYPE D | 55 FT | $62.00 | $65.00 | $74.00 | $80.00 | $84.00 |
| 611E07900 18" CONDUIT, TYPE D | 72 FT | $81.00 | $62.00 | $90.00 | $85.00 | $89.00 |
| 611E09400 21" CONDUIT, TYPE D | 126 FT | $88.50 | $158 | $99.00 | $105 | $107 |
| 611E10900 24" CONDUIT, TYPE D | 18 FT | $285 | $114 | $150 | $105 | $220 |
| 611E12400 27" CONDUIT, TYPE D | 10 FT | $234 | $223 | $189 | $185 | $256 |
| 611E98150 CATCH BASIN, NO. 3 | 2 EACH | $3,500 | $1,500 | $4,468 | $4,750 | $4,275 |
| 407E10000 TACK COAT | 351 GAL | $3.00 | $3.15 | $4.00 | $3.50 | $3.50 |
| 441E70700 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (20 CY | $342 | $360 | $525 | $380 | $525 |
| 609E26000 CURB, TYPE 6 | 19 FT | $50.00 | $45.00 | $68.00 | $95.00 | $54.00 |
| 638E10300 FIRE HYDRANT EXTENDED AND ADJUSTED TO GRADE | 5 EACH | $1,400 | $1,100 | $2,219 | $3,000 | $4,000 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 8 EACH | $50.00 | $300 | $1,841 | $215 | $932 |
| 625E32000 GROUND ROD | 4 EACH | $350 | $330 | $473 | $370 | $376 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 484.3 FT | $13.00 | $12.00 | $13.00 | $17.00 | $16.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 182.3 FT | $14.00 | $12.00 | $14.00 | $17.00 | $17.00 |
| 630E80100 SIGN, FLAT SHEET | 269.8 SF | $15.50 | $15.40 | $15.50 | $34.00 | $35.00 |
| 632E64020 PEDESTAL FOUNDATION | 4 EACH | $1,175 | $1,100 | $1,587 | $1,300 | $1,260 |
| 646E10520 CROSSWALK LINE, 24" | 80 FT | $22.00 | $17.50 | $23.00 | $17.00 | $24.00 |
| 646E20650 SHARED LANE MARKING | 8 EACH | $420 | $325 | $289 | $315 | $451 |
| 646E20800 YIELD LINE | 40 FT | $20.00 | $22.00 | $30.00 | $22.00 | $22.00 |
| 507E00410 STEEL PILES, MISC.: HELICAL PILE BRACE WITH ATTACH | 2 EACH | $1,300 | $2,500 | $1,486 | $1,600 | $1,590 |
| 507E00410 STEEL PILES, MISC.: HELICAL PILE WITH ATTACHMENTS | 8 EACH | $1,300 | $2,500 | $1,486 | $1,600 | $1,590 |
| 518E21201 POROUS BACKFILL WITH GEOTEXTILE FABRIC, AS PER PLA | 12 CY | $200 | $104 | $151 | $145 | $312 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $11,000 | $14,300 | $17,000 | $9,500 | $7,300 |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $1,000 | $1,500 | $684 | $2,200 | $2,700 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 4,663 CY | $24 | $112k | 11% |
| 304E20000 AGGREGATE BASE | 1,184 CY | $80 | $95k | 9% |
| 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN | 1,466 CY | $56 | $82k | 8% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (264 CY | $301 | $79k | 8% |
| 659E00300 TOPSOIL | 1,463 CY | $46 | $67k | 6% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 189 CY | $344 | $65k | 6% |
| 832E30000 EROSION CONTROL | 62,000 EACH | $1 | $62k | 6% |
| 530E00600 SPECIAL - STRUCTURES: BOARDWALK WITH RAIL | 558 SF | $90.95 | $51k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 4% |
| 607E98000 FENCE, MISC.: WOOD FENCE | 877 FT | $43.5 | $38k | 4% |