LAK-SR 44-06.05/VAR Slope
LAK County · est $0.4M
Bid dateThursday, February 9—
LAK County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 14 more items below.
| Item | Quantity | R1Ruhlin Company | R2Eclipse CO LLC | R3Becdir Construction Company | % of bid |
|---|---|---|---|---|---|
| 690E98300 SPECIAL - MISC.: PLATE PILES | 1,141 SY | $195 | $260 | $330 | 51% |
| 690E98000 SPECIAL - UTILITY TEST HOLE | 3 EACH | $11,167 | $1,442 | $400 | 8% |
| 203E98500 ROADWAY, MISC.: EARTHWORK | 1 LS | $25,000 | $35,000 | $25,000 | 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $23,110 | $15,000 | $45,000 | 5% |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, AS DIRECTED BY T | 600 SF | $25.00 | $33.75 | $20.00 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $14,700 | $44,000 | $20,000 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3 INCH | 149 SY | $97.50 |
| Item | Quantity | R1Ruhlin Company | R2Eclipse CO LLC | R3Becdir Construction Company |
|---|---|---|---|---|
| 202E32500 CURB AND GUTTER REMOVED | 72 FT | $25.00 | $16.00 | $21.00 |
| 202E38000 GUARDRAIL REMOVED | 275 FT | $2.20 | $2.00 | $10.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $200 | $50.00 | $210 |
| 659E00530 SEEDING AND MULCHING, CLASS 3B | 1,315 SY | $0.95 | $2.85 | $1.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 59 SY | $3.36 | $0.70 | $3.15 |
| 659E15000 INTER-SEEDING | 59 SY | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $25.00 |
| $47.25 |
| 3% |
| 659E00300 TOPSOIL | 132 CY | $83.00 | $56.00 | $88.00 | 3% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $15,563 | $30,000 | 2% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 7 CY | $1,400 | $700 | $1,155 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $3,000 | $684 | $2,850 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 275 FT | $24.20 | $25.40 | $27.00 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $65.00 | $67.00 | $70.00 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $6,000 | $10,000 | 1% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 3 CY | $1,550 | $700 | $1,835 | 1% |
| 609E23000 COMBINATION CURB AND GUTTER, TYPE 4 | 72 FT | $60.00 | $76.00 | $178 | 1% |
| 441E70200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (3 CY | $1,400 | $700 | $1,680 | 1% |
| 670E00520 SLOPE EROSION PROTECTION MAT, TYPE B | 1,185 SY | $2.50 | $2.65 | $2.65 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 5 SNMT | $520 | $1,418 | $1,100 | 1% |
| $0.10 |
| $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.16 TON | $1,200 | $630 | $1,260 |
| 659E31000 LIME | 0.25 ACRE | $1.00 | $40.00 | $400 |
| 659E35000 WATER | 6 MGAL | $1.00 | $1.50 | $1.00 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 6 CY | $420 | $142 | $300 |
| 407E10000 TACK COAT | 21 GAL | $4.00 | $57.00 | $47.00 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 70 FT | $28.58 | $70.00 | $74.00 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 0.04 MILE | $47,765 | $41,850 | $50,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,101 | $9,500 | $12,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 690E98300 SPECIAL - MISC.: PLATE PILES | 1,141 SY | $195 | $222k | 50% |
| 690E98000 SPECIAL - UTILITY TEST HOLE | 3 EACH | $11,167 | $34k | 7% |
| 203E98500 ROADWAY, MISC.: EARTHWORK | 1 LS | $25,000 | $25k | 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $23,110 | $23k | 5% |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, AS DIRECTED BY T | 600 SF | $25 | $15k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $14,700 | $15k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3 INCH | 149 SY | $97.5 | $15k | 3% |
| 659E00300 TOPSOIL | 132 CY | $83 | $11k | 2% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1 | $10k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 2% |