CUY-Wolf Road Intersection
CUY County · est $0.3M
Bid dateThursday, March 9—
CUY County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 49 more items below.
| Item | Quantity | R1Cook Paving & Construction CO INC | R2Digioia-suburban Excavating LLC | R3S E T INC | R4Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (100 CY | $335 | $495 | $345 | $330 | 13% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 72 CY | $420 | $648 | $445 | $430 | 11% |
| 609E16001 CURB, TYPE 2-B, AS PER PLAN | 293 FT | $85.00 | $80.00 | $55.00 | $45.00 | 9% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $21,800 | $15,000 | $51,231 | $39,230 | 8% |
| 608E52001 CURB RAMP, AS PER PLAN | 694 SF | $27.00 | $25.00 | $25.00 | $21.00 | 7% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (T | 2,064 SY | $8.00 | $15.00 | $10.00 |
| Item | Quantity | R1Cook Paving & Construction CO INC | R2Digioia-suburban Excavating LLC | R3S E T INC | R4Eclipse CO LLC |
|---|---|---|---|---|---|
| 202E30001 WALK REMOVED, AS PER PLAN | 939 SF | $3.00 | $4.50 | $5.00 | $2.00 |
| 202E32001 CURB REMOVED, AS PER PLAN | 35 FT | $20.00 | $35.00 | $11.00 | $29.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 22 FT | $25.00 | $15.00 | $45.00 | $23.00 |
| 202E58100 CATCH BASIN REMOVED | 4 EACH | $800 | $300 | $600 | $603 |
| 608E10001 4" CONCRETE WALK, AS PER PLAN |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $9.50 |
| 6% |
| 624E10000 MOBILIZATION | 1 LS | $15,500 | $15,500 | $70,000 | $11,868 | 6% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 307 SY | $50.00 | $36.00 | $25.00 | $19.00 | 6% |
| 203E20000 EMBANKMENT | 177 CY | $75.00 | $30.00 | $20.00 | $55.00 | 5% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $10,000 | $10,500 | $12,000 | $9,000 | 4% |
| 611E98151 CATCH BASIN, NO. 3, AS PER PLAN | 2 EACH | $4,500 | $7,200 | $4,500 | $7,500 | 3% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 11 EACH | $800 | $650 | $400 | $6,000 | 3% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 5,000 LB | $1.75 | $1.80 | $2.00 | $5.00 | 3% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 206 SY | $40.00 | $140 | $100 | $98.00 | 3% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 303 FT | $26.00 | $23.00 | $17.00 | $34.00 | 3% |
| 632E26500 DETECTOR LOOP | 3 EACH | $2,000 | $2,100 | $1,600 | $1,250 | 2% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $1,500 | $1,000 | $950 | $1,418 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $5,500 | $3,500 | $9,500 | 2% |
| 644E00620 CROSSWALK LINE, 12" | 904 FT | $4.50 | $5.50 | $5.00 | $8.10 | 2% |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 1 EACH | $3,600 | $7,200 | $3,500 | $7,500 | 1% |
| 355 SF |
| $8.50 |
| $15.00 |
| $18.00 |
| $8.00 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 1 EACH | $700 | $500 | $650 | $1,500 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $200 | $250 | $125 | $105 |
| 659E00300 TOPSOIL | 35 CY | $70.00 | $90.00 | $90.00 | $150 |
| 659E00501 SEEDING AND MULCHING, CLASS 1, AS PER PLAN | 312 SY | $3.50 | $3.00 | $5.25 | $13.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.05 TON | $1,000 | $600 | $1,100 | $1,053 |
| 659E31000 LIME | 0.06 ACRE | $1,500 | $300 | $500 | $211 |
| 659E35000 WATER | 2 MGAL | $25.00 | $200 | $100 | $2.00 |
| 832E30001 EROSION CONTROL, AS PER PLAN | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 40 FT | $33.00 | $35.00 | $30.00 | $40.00 |
| 611E04400 12" CONDUIT, TYPE B | 30 FT | $56.00 | $188 | $155 | $102 |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 1 EACH | $2,000 | $1,500 | $3,500 | $7,500 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $1,200 | $1,250 | $1,000 | $7,500 |
| 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN | 1 EACH | $1,500 | $1,950 | $3,500 | $7,500 |
| 407E13900 TACK COAT, 702.13 | 144 GAL | $5.00 | $18.00 | $13.00 | $12.00 |
| 407E20000 NON-TRACKING TACK COAT | 113 GAL | $5.00 | $18.00 | $13.00 | $12.00 |
| 638E10901 SERVICE BOX ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $400 | $125 | $550 | $6,000 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 135 FT | $15.00 | $20.00 | $11.00 | $24.00 |
| 630E80100 SIGN, FLAT SHEET | 103.5 SF | $20.00 | $25.00 | $21.00 | $26.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $25.00 | $30.00 | $27.00 | $16.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $30.00 | $30.00 | $21.00 | $21.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 5 EACH | $20.00 | $30.00 | $27.00 | $32.00 |
| 644E00100 EDGE LINE, 4" | 0.02 MILE | $10,000 | $34,000 | $32,000 | $67,500 |
| 644E00300 CENTER LINE | 0.04 MILE | $16,000 | $17,000 | $16,000 | $67,500 |
| 644E00400 CHANNELIZING LINE, 8" | 157 FT | $2.75 | $2.00 | $1.50 | $2.70 |
| 644E00500 STOP LINE | 84 FT | $9.25 | $8.00 | $7.25 | $5.40 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 37 FT | $8.00 | $9.00 | $8.50 | $8.10 |
| 644E01100 SCHOOL SYMBOL MARKING, 72" | 1 EACH | $1,000 | $450 | $425 | $810 |
| 644E01300 LANE ARROW | 5 EACH | $145 | $150 | $135 | $230 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 1 EACH | $575 | $500 | $375 | $675 |
| 625E32000 GROUND ROD | 3 EACH | $400 | $400 | $475 | $232 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 3 EACH | $750 | $950 | $700 | $555 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 3 EACH | $260 | $400 | $300 | $237 |
| 632E40200 SIGNAL CABLE, 2 CONDUCTOR, NO. 14 AWG | 432 FT | $2.50 | $3.00 | $2.50 | $1.50 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 462 FT | $3.75 | $4.00 | $3.25 | $2.25 |
| 632E89900 PEDESTAL, 8', TRANSFORMER BASE | 3 EACH | $1,000 | $950 | $750 | $1,630 |
| 632E90300 SIGNALIZATION, MISC.: REMOVAL OF PEDESTRIAN SIGNAL | 1 LS | $2,500 | $980 | $6,000 | $600 |
| 632E90400 SIGNALIZATION, MISC.: FOUNDATION TEST HOLE | 3 EACH | $700 | $230 | $725 | $140 |
| 625E25504 CONDUIT, 3", 725.051 | 63 FT | $23.00 | $21.00 | $20.00 | $18.00 |
| 625E29000 TRENCH | 63 FT | $20.00 | $29.00 | $25.00 | $27.00 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 63 FT | $3.00 | $1.00 | $2.00 | $3.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $75.00 | $85.00 | $80.00 | $68.00 |
| 614E18000 MAINTAINING TRAFFIC, MISC.: MAINTAINING EXISTING T | 3 EACH | $1,200 | $1,100 | $1,600 | $650 |
| 616E10000 WATER | 10 MGAL | $30.00 | $80.00 | $100 | $169 |
| 616E20000 CALCIUM CHLORIDE | 0.1 TON | $1,500 | $1,500 | $2,100 | $421 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (100 CY | $335 | $34k | 10% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 72 CY | $420 | $30k | 9% |
| 609E16001 CURB, TYPE 2-B, AS PER PLAN | 293 FT | $85 | $25k | 8% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $21,800 | $22k | 7% |
| 608E52001 CURB RAMP, AS PER PLAN | 694 SF | $27 | $19k | 6% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (T | 2,064 SY | $8 | $17k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $15,500 | $16k | 5% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 307 SY | $50 | $15k | 5% |
| 203E20000 EMBANKMENT | 177 CY | $75 | $13k | 4% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $10,000 | $10k | 3% |