DEL-US 36-18.79 (at Galena)
DEL County · est $2.8M
Bid dateThursday, April 27—
DEL County · est $2.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 143 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Double Z Construction Company | R3Trucco Construction CO INC | R4Axis Civil Construction LLC | R5Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,696 CY | $175 | $175 | $175 | $175 | $175 | 16% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 2,681 CY | $61.00 | $49.00 | $62.84 | $80.00 | $42.00 | 9% |
| 442E22101 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 546 CY | $235 | $235 | $235 | $235 | $235 | 7% |
| 442E22300 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 634 CY | $200 | $200 | $200 | $200 | $200 | 7% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE | — |
| Item | Quantity | R1Shelly & Sands INC | R2Double Z Construction Company | R3Trucco Construction CO INC | R4Axis Civil Construction LLC | R5Complete General Construction Company |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $16,000 | $20,000 | $16,000 | $20,000 | $50,000 |
| 202E20010 HEADWALL REMOVED | 2 EACH | $250 | $100 | $600 | $450 | $850 |
| 202E23000 PAVEMENT REMOVED | 2,291 SY | $15.00 | $24.00 | $36.13 | $20.00 | $22.50 |
| 202E30000 WALK REMOVED | 852 SF |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $14.00 |
| $14.00 |
| $14.00 |
| $14.00 |
| $14.00 |
| 6% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $92,250 | $80,000 | $100,000 | 6% |
| 203E10000 EXCAVATION | 3,543 CY | $27.00 | $38.00 | $26.71 | $24.00 | $45.00 | 5% |
| 204E13000 EXCAVATION OF SUBGRADE | 2,681 CY | $33.00 | $28.00 | $25.38 | $24.00 | $24.00 | 5% |
| 611E07600 18" CONDUIT, TYPE C | 1,429 FT | $60.00 | $87.00 | $115 | $85.00 | $105 | 5% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 1,299 CY | $65.00 | $80.00 | $85.67 | $92.00 | $90.00 | 5% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 1,472 SY | $50.00 | $93.00 | $77.53 | $78.00 | $75.00 | 4% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 2,361 FT | $30.00 | $35.00 | $29.19 | $55.00 | $42.00 | 4% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 3,875 FT | $18.00 | $8.00 | $33.06 | $28.00 | $20.00 | 4% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 4,252 FT | $14.00 | $9.50 | $12.58 | $13.00 | $18.00 | 3% |
| 611E07400 18" CONDUIT, TYPE B | 544 FT | $105 | $92.00 | $150 | $85.00 | $140 | 3% |
| 632E86130 STRAIN POLE, TYPE TC-81.11, DESIGN 10 | 4 EACH | $12,328 | $11,000 | $12,328 | $12,350 | $11,500 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $105,000 | $44,120 | $100,000 | $95,000 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,740 FT | $14.50 | $24.00 | $13.87 | $20.50 | $25.00 | 2% |
| 611E98470 CATCH BASIN, NO. 2-2B | 13 EACH | $3,000 | $2,500 | $5,808 | $4,000 | $1,600 | 2% |
| 204E10000 SUBGRADE COMPACTION | 8,950 SY | $4.00 | $3.50 | $4.11 | $3.00 | $5.00 | 2% |
| $0.80 |
| $2.50 |
| $1.47 |
| $2.75 |
| $4.00 |
| 202E30204 STEPS REMOVED | 1 LS | $400 | $250 | $628 | $500 | $500 |
| 202E56000 BUILDING DEMOLISHED (8597 SR 37-447 OFFICE BLDGS-1 | 1 LS | $14,000 | $2,500 | $14,100 | $24,000 | $19,500 |
| 202E58100 CATCH BASIN REMOVED | 16 EACH | $300 | $375 | $801 | $750 | $550 |
| 202E62700 SEPTIC TANK REMOVED | 1 EACH | $1,000 | $2,000 | $3,465 | $2,500 | $5,000 |
| 202E66500 UNDERGROUND STORAGE TANK REMOVED | 1 EACH | $19,125 | $8,000 | $12,928 | $10,000 | $16,500 |
| 202E75000 FENCE REMOVED | 415 FT | $5.00 | $3.00 | $7.00 | $7.50 | $7.00 |
| 202E98000 REMOVAL MISC.:CONCRETE SLAB REMOVED | 1 LS | $900 | $500 | $1,256 | $500 | $1,000 |
| 202E98100 REMOVAL MISC.:FENCE POST REMOVED | 2 EACH | $100 | $25.00 | $70.47 | $200 | $60.00 |
| 202E98100 REMOVAL MISC.:STONE WALL REMOVED | 2 EACH | $110 | $250 | $1,022 | $1,500 | $500 |
| 202E98100 REMOVAL MISC.:YARD LIGHT, POST AND FOOTING | 1 EACH | $200 | $250 | $600 | $850 | $250 |
| 202E98200 REMOVAL MISC.: BUMPER BLOCKS REMOVED | 60 FT | $8.00 | $5.00 | $16.18 | $10.00 | $5.00 |
| 203E20000 EMBANKMENT | 1,037 CY | $10.00 | $25.00 | $9.58 | $24.00 | $8.00 |
| 204E45000 PROOF ROLLING | 6 HOUR | $240 | $190 | $277 | $200 | $250 |
| 204E50000 GEOTEXTILE FABRIC | 7,635 SY | $0.60 | $1.00 | $1.87 | $1.50 | $2.00 |
| 608E10000 4" CONCRETE WALK | 73 SF | $22.00 | $14.00 | $30.72 | $22.00 | $12.00 |
| 608E40000 CONCRETE STEPS, TYPE A | 15 FT | $200 | $350 | $118 | $165 | $150 |
| 623E38500 MONUMENT ASSEMBLY | 4 EACH | $1,600 | $1,700 | $2,049 | $2,500 | $1,300 |
| 623E40500 REFERENCE MONUMENT | 50 EACH | $90.00 | $600 | $388 | $600 | $750 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 22 EACH | $100 | $300 | $74.30 | $500 | $750 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 7 EACH | $290 | $290 | $290 | $200 | $290 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 2 EACH | $495 | $495 | $495 | $250 | $495 |
| 690E50300 SPECIAL - MAILBOX SUPPORT SYSTEM, MULTIPLE | 2 EACH | $685 | $685 | $685 | $750 | $685 |
| 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO | 350 TON | $70.00 | $55.00 | $68.42 | $112 | $140 |
| 690E65022 SPECIAL - WORK INVOLVING NON-REGULATED WATER | 100 GAL | $12.00 | $15.00 | $3.00 | $5.00 | $4.00 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $17,825 | $15,000 | $25,000 | $40,000 | $10,000 |
| 601E11000 RIPRAP, TYPE D | 12 SY | $500 | $275 | $370 | $300 | $250 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 11 SY | $125 | $175 | $120 | $140 | $150 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 6 CY | $310 | $175 | $183 | $150 | $150 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $98.00 | $75.00 | $98.00 | $150 | $150 |
| 659E00300 TOPSOIL | 123 CY | $65.00 | $55.00 | $209 | $35.00 | $30.00 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 13,874 SY | $0.75 | $0.94 | $0.71 | $0.85 | $0.85 |
| 659E14000 REPAIR SEEDING AND MULCHING | 694 SY | $0.80 | $2.00 | $0.78 | $0.85 | $0.85 |
| 659E15000 INTER-SEEDING | 694 SY | $0.80 | $2.00 | $0.78 | $0.85 | $0.85 |
| 659E20000 COMMERCIAL FERTILIZER | 1.93 TON | $865 | $950 | $865 | $1,400 | $1,400 |
| 659E31000 LIME | 2.87 ACRE | $154 | $10.00 | $154 | $2.87 | $100 |
| 659E35000 WATER | 77 MGAL | $1.00 | $2.00 | $1.00 | $1.00 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION | 631 SY | $1.50 | $2.00 | $1.49 | $2.50 | $2.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $2,000 | $1,475 | $2,000 | $2,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $9,600 | $17,000 | $12,800 | $17,000 | $22,800 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $13,700 | $15,000 | $19,600 | $16,056 | $14,000 |
| 832E30000 EROSION CONTROL | 35,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 2.8 CY | $3,000 | $2,500 | $3,137 | $4,000 | $2,600 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 210 FT | $29.00 | $15.00 | $20.63 | $30.00 | $20.00 |
| 611E01400 6" CONDUIT, TYPE E, FOR DRAINAGE CONNECTION | 400 FT | $13.00 | $7.00 | $17.90 | $25.00 | $20.00 |
| 611E01500 6" CONDUIT, TYPE F, FOR DRAINAGE CONNECTION | 400 FT | $13.00 | $7.00 | $17.90 | $25.00 | $20.00 |
| 611E02500 8" CONDUIT, TYPE E, FOR DRAINAGE CONNECTION | 400 FT | $16.00 | $8.00 | $23.56 | $32.00 | $25.00 |
| 611E02600 8" CONDUIT, TYPE F, FOR DRAINAGE CONNECTION | 400 FT | $16.00 | $8.00 | $23.56 | $32.00 | $25.00 |
| 611E04400 12" CONDUIT, TYPE B | 229 FT | $85.00 | $82.00 | $126 | $65.00 | $150 |
| 611E04400 12" CONDUIT, TYPE B, 706.02 | 6 FT | $200 | $87.00 | $231 | $350 | $160 |
| 611E04600 12" CONDUIT, TYPE C | 351 FT | $80.00 | $77.00 | $81.43 | $65.00 | $105 |
| 611E06100 15" CONDUIT, TYPE C | 291 FT | $89.00 | $82.00 | $74.37 | $80.00 | $100 |
| 611E07400 18" CONDUIT, TYPE B, 706.02 | 30 FT | $150 | $102 | $226 | $195 | $160 |
| 611E10400 24" CONDUIT, TYPE B | 259 FT | $110 | $130 | $158 | $150 | $190 |
| 611E10400 24" CONDUIT, TYPE B, 706.02 | 69 FT | $145 | $140 | $262 | $165 | $200 |
| 611E10600 24" CONDUIT, TYPE C | 97 FT | $120 | $135 | $151 | $165 | $120 |
| 611E13400 30" CONDUIT, TYPE B, 706.02 | 16 FT | $200 | $265 | $458 | $400 | $225 |
| 611E13600 30" CONDUIT, TYPE C | 12 FT | $300 | $260 | $210 | $250 | $200 |
| 611E16600 36" CONDUIT, TYPE C | 16 FT | $225 | $290 | $219 | $190 | $180 |
| 611E98150 CATCH BASIN, NO. 3 | 3 EACH | $4,500 | $4,800 | $5,524 | $5,000 | $3,400 |
| 611E98180 CATCH BASIN, NO. 3A | 4 EACH | $3,500 | $3,700 | $4,435 | $4,200 | $3,400 |
| 611E98300 CATCH BASIN, NO. 5 | 1 EACH | $7,000 | $5,000 | $4,701 | $5,000 | $3,500 |
| 611E98370 CATCH BASIN, NO. 6 | 1 EACH | $3,500 | $3,500 | $4,426 | $4,400 | $2,500 |
| 611E98450 CATCH BASIN, NO. 2-2A | 1 EACH | $3,100 | $2,500 | $2,951 | $4,000 | $1,600 |
| 611E98510 CATCH BASIN, NO. 2-3 | 2 EACH | $3,000 | $2,900 | $6,907 | $4,000 | $3,600 |
| 611E99574 MANHOLE, NO. 3 | 7 EACH | $4,250 | $4,500 | $5,881 | $5,000 | $5,500 |
| 301E56100 ASPHALT CONCRETE BASE, PG64-22, (449), (DRIVEWAYS) | 50 CY | $300 | $300 | $300 | $300 | $300 |
| 304E20000 AGGREGATE BASE | 116 CY | $125 | $125 | $145 | $95.00 | $85.00 |
| 407E20000 NON-TRACKING TACK COAT | 2,002 GAL | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $330 | $330 | $330 | $330 | $330 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 330 SY | $105 | $75.00 | $96.80 | $112 | $95.00 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 47 SY | $90.00 | $85.00 | $121 | $148 | $100 |
| 609E26000 CURB, TYPE 6 | 16 FT | $135 | $70.00 | $41.24 | $90.00 | $60.00 |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 0.47 MILE | $10,000 | $10,000 | $5,000 | $18,500 | $12,000 |
| 690E12060 SPECIAL - PAVEMENT OVERLAY FABRIC COMPOSITE | 1,458 SY | $0.50 | $5.00 | $5.00 | $5.00 | $5.00 |
| 621E00100 RPM | 135 EACH | $52.00 | $52.00 | $52.00 | $52.00 | $52.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 40 EACH | $12.00 | $10.00 | $21.63 | $15.00 | $12.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 82 FT | $16.50 | $16.50 | $16.50 | $26.00 | $16.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 140 FT | $17.80 | $17.80 | $17.80 | $28.00 | $17.80 |
| 630E80100 SIGN, FLAT SHEET | 58.75 SF | $20.00 | $20.00 | $20.00 | $35.00 | $20.00 |
| 630E80600 SIGN, DOUBLE FACED, MILE MARKER | 1 EACH | $175 | $175 | $175 | $75.00 | $175 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 9 EACH | $10.00 | $10.00 | $10.00 | $30.00 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $65.00 | $65.00 | $65.00 | $150 | $65.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 11 EACH | $15.00 | $15.00 | $15.00 | $30.00 | $15.00 |
| 644E00104 EDGE LINE, 6" | 0.53 MILE | $8,152 | $8,152 | $8,152 | $8,152 | $8,152 |
| 644E00300 CENTER LINE | 0.77 MILE | $11,690 | $11,690 | $11,690 | $11,690 | $11,690 |
| 644E00400 CHANNELIZING LINE, 8" | 1,215 FT | $2.20 | $2.20 | $2.20 | $2.20 | $2.20 |
| 644E00500 STOP LINE | 108 FT | $10.25 | $10.25 | $10.25 | $10.25 | $110 |
| 644E01300 LANE ARROW | 14 EACH | $120 | $120 | $120 | $120 | $120 |
| 625E25500 CONDUIT, 3", 725.04 | 56 FT | $31.85 | $25.00 | $31.85 | $72.66 | $39.00 |
| 625E29000 TRENCH | 36 FT | $14.35 | $20.00 | $14.35 | $22.22 | $30.00 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,130 | $1,300 | $1,130 | $1,072 | $1,480 |
| 625E32000 GROUND ROD | 5 EACH | $412 | $275 | $412 | $450 | $400 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 36 FT | $2.05 | $3.00 | $2.05 | $2.99 | $2.50 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 10 EACH | $1,091 | $1,200 | $1,091 | $1,384 | $1,100 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 10 EACH | $33.75 | $40.00 | $33.75 | $156 | $65.00 |
| 632E29900 MESSENGER WIRE, 7 STRAND, 1/4" DIAMETER WITH ACCES | 359 FT | $31.59 | $16.00 | $31.59 | $18.68 | $16.00 |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 359 FT | $26.85 | $16.00 | $26.85 | $22.43 | $23.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 1,141 FT | $4.99 | $3.00 | $4.99 | $4.18 | $5.00 |
| 632E64000 STRAIN POLE FOUNDATION | 4 EACH | $4,106 | $7,250 | $4,106 | $6,240 | $8,500 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 65 FT | $6.61 | $6.00 | $6.61 | $5.34 | $6.00 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 60 FT | $9.09 | $8.00 | $9.09 | $3.86 | $7.00 |
| 632E70000 POWER SERVICE | 1 EACH | $4,835 | $1,600 | $4,835 | $3,170 | $2,860 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $7,463 | $2,811 | $7,463 | $2,620 | $8,000 |
| 632E90400 SIGNALIZATION, MISC.: CDMA MODEM, FURNISH ONLY | 1 EACH | $2,771 | $2,500 | $2,772 | $2,878 | $3,000 |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $16,933 | $15,000 | $16,933 | $17,034 | $20,000 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $1,369 | $3,100 | $1,369 | $1,672 | $5,000 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $919 | $505 | $919 | $550 | $3,000 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $9,401 | $8,800 | $9,401 | $9,236 | $9,000 |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 2 EACH | $10,223 | $9,800 | $10,223 | $9,860 | $9,150 |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 2 EACH | $9,878 | $9,450 | $9,878 | $9,500 | $8,800 |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 1 EACH | $6,390 | $6,600 | $6,390 | $6,710 | $7,500 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 258 SY | $40.00 | $40.00 | $40.00 | $40.00 | $20.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 75 CY | $43.00 | $40.00 | $116 | $80.00 | $100 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 75 CY | $50.00 | $40.00 | $116 | $80.00 | $100 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 130 CY | $88.00 | $100 | $83.86 | $80.00 | $100 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 11 CY | $400 | $400 | $400 | $400 | $400 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $80.00 | $65.00 | $133 | $80.00 | $90.00 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,180 | $2,180 | $2,181 | $2,350 | $2,200 |
| 614E12420 DETOUR SIGNING | 1 LS | $20,000 | $23,000 | $11,635 | $11,635 | $22,500 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 8 CY | $750 | $250 | $387 | $350 | $250 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, TWO WAY | 188 EACH | $7.00 | $10.00 | $14.00 | $16.00 | $12.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 64 EACH | $19.00 | $20.00 | $21.00 | $22.00 | $15.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $900 | $800 | $1,050 | $1,050 | $1,250 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 1.34 MILE | $2,490 | $2,490 | $2,290 | $2,490 | $2,900 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.38 MILE | $1,665 | $1,665 | $2,900 | $1,665 | $1,650 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.05 MILE | $1,455 | $1,455 | $1,380 | $1,455 | $1,700 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 1.9 MILE | $1,465 | $1,465 | $1,835 | $1,465 | $1,700 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.47 MILE | $1,085 | $1,085 | $2,530 | $1,085 | $1,260 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 745 FT | $1.70 | $1.70 | $0.75 | $1.70 | $1.97 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 470 FT | $1.55 | $1.55 | $0.70 | $1.55 | $1.80 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 117 FT | $3.40 | $3.40 | $3.50 | $3.40 | $4.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 48 FT | $3.05 | $3.05 | $3.45 | $3.05 | $4.00 |
| 614E30000 WORK ZONE ARROW, CLASS I | 8 EACH | $140 | $140 | $75.00 | $140 | $165 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 6 EACH | $135 | $135 | $70.00 | $135 | $160 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $12,500 | $84,000 | $34,366 | $20,000 | $85,000 |
| 616E10000 WATER | 14 MGAL | $125 | $35.00 | $77.02 | $10.00 | $80.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $17,600 | $19,598 | $25,000 | $20,000 |
| 619E16010 FIELD OFFICE, TYPE B | 9 MNTH | $3,750 | $2,000 | $2,988 | $1,800 | $3,250 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $27,755 | $40,000 | $26,000 | $30,000 | $60,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,696 CY | $175 | $297k | 11% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 2,681 CY | $61 | $164k | 6% |
| 442E22101 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 546 CY | $235 | $128k | 5% |
| 442E22300 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 634 CY | $200 | $127k | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE | — | $14 | $102k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 4% |
| 203E10000 EXCAVATION | 3,543 CY | $27 | $96k | 3% |
| 204E13000 EXCAVATION OF SUBGRADE | 2,681 CY | $33 | $88k | 3% |
| 611E07600 18" CONDUIT, TYPE C | 1,429 FT | $60 | $86k | 3% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 1,299 CY | $65 | $84k | 3% |