JEF-SR 151-12.45
JEF County · est $0.6M
Bid dateThursday, May 11—
JEF County · est $0.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 53 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Tucson INC | R3Nls Paving, INC | R4Ohio-west Virginia Excavating CO | % of bid |
|---|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 267 CY | $350 | $303 | $240 | $294 | 19% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 200 CY | $350 | $212 | $200 | $317 | 14% |
| 203E10000 EXCAVATION | 1,595 CY | $22.00 | $37.00 | $32.00 | $26.00 | 7% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (87 CY | $400 | $308 | $300 | $321 | 7% |
| 304E20000 AGGREGATE BASE | 330 CY | $88.00 | $108 | $135 | $147 | 6% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 62 CY | $400 | $372 | $360 | $404 | 5% |
| Item | Quantity | R1Shelly & Sands INC | R2Tucson INC | R3Nls Paving, INC | R4Ohio-west Virginia Excavating CO |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $950 | $5,500 | $2,500 | $3,200 |
| 202E23500 WEARING COURSE REMOVED | 214 SY | $7.00 | $13.55 | $12.00 | $14.00 |
| 202E30001 WALK REMOVED, AS PER PLAN | 619 SF | $2.00 | $3.35 | $4.00 | $4.00 |
| 202E30200 STEPS REMOVED | 15 FT | $25.00 | $33.00 | $45.00 | $127 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 10 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 571 FT | $40.00 | $53.40 | $85.00 | $60.00 | 5% |
| 202E23000 PAVEMENT REMOVED | 1,478 SY | $15.00 | $13.15 | $20.00 | $25.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $40,000 | $20,000 | 4% |
| 410E10000 TRAFFIC COMPACTED SURFACE, TYPE A | 200 CY | $95.00 | $40.00 | $40.00 | $147 | 4% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 76 SY | $220 | $105 | $85.00 | $147 | 3% |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $3,200 | $2,050 | $3,200 | $1,500 | 3% |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 3 EACH | $4,250 | $11,900 | $6,000 | $4,500 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 773 FT | $16.00 | $31.00 | $20.00 | $29.00 | 3% |
| 611E04400 12" CONDUIT, TYPE B, 707.11 | 105 FT | $115 | $168 | $185 | $172 | 2% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,280 | $2,500 | $2,280 | $2,100 | 2% |
| 659E00300 TOPSOIL | 128 CY | $65.00 | $57.00 | $65.00 | $49.50 | 2% |
| 202E98200 REMOVAL MISC.:RETAINING WALL REMOVED | 228 FT | $35.00 | $13.00 | $35.00 | $20.00 | 2% |
| 611E04400 12" CONDUIT, TYPE B | 71 FT | $105 | $139 | $140 | $149 | 2% |
| $25.00 |
| $25.55 |
| $25.00 |
| $134 |
| 202E38000 GUARDRAIL REMOVED | 14 FT | $5.00 | $8.60 | $15.00 | $24.00 |
| 202E53100 MAILBOX REMOVED | 2 EACH | $100 | $130 | $100 | $37.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $500 | $255 | $575 | $1,600 |
| 202E98000 REMOVAL MISC.:SEGMENTED WALL REMOVED | 1 LS | $1,000 | $2,450 | $575 | $463 |
| 203E20000 EMBANKMENT | 92 CY | $17.00 | $21.00 | $25.00 | $72.50 |
| 204E10000 SUBGRADE COMPACTION | 1,941 SY | $3.00 | $1.90 | $2.00 | $4.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $225 | $174 | $300 | $150 |
| 606E15050 GUARDRAIL, TYPE MGS | 25 FT | $112 | $121 | $112 | $120 |
| 606E20000 FLARED END SECTION | 2 EACH | $105 | $114 | $105 | $76.00 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 2 EACH | $285 | $308 | $285 | $344 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 22 CY | $100 | $175 | $170 | $150 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $200 | $75.00 | $200 | $250 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 1,152 SY | $3.60 | $3.90 | $3.60 | $4.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 58 SY | $3.60 | $0.70 | $3.60 | $4.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.16 TON | $1,400 | $2,065 | $1,400 | $2,000 |
| 659E31000 LIME | 0.24 ACRE | $100 | $626 | $100 | $200 |
| 659E35000 WATER | 7 MGAL | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E04600 12" CONDUIT, TYPE C | 10 FT | $120 | $188 | $130 | $226 |
| 611E98180 CATCH BASIN, NO. 3A | 2 EACH | $2,800 | $3,150 | $3,900 | $2,850 |
| 611E98450 CATCH BASIN, NO. 2-2A | 1 EACH | $2,000 | $2,745 | $3,400 | $2,800 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $3,200 | $4,420 | $6,250 | $3,500 |
| 407E10000 TACK COAT | 212 GAL | $3.50 | $5.50 | $3.00 | $6.00 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $1,200 | $524 | $400 | $920 |
| 441E70700 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (6 CY | $1,000 | $524 | $350 | $780 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 170 FT | $17.00 | $18.40 | $17.00 | $34.00 |
| 630E08600 SIGN POST REFLECTOR | 11 EACH | $49.00 | $53.00 | $49.00 | $47.00 |
| 630E80100 SIGN, FLAT SHEET | 78 SF | $22.00 | $23.80 | $22.00 | $43.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $10.00 | $11.00 | $10.00 | $38.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $65.00 | $70.25 | $65.00 | $279 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $15.00 | $16.25 | $15.00 | $38.00 |
| 644E00100 EDGE LINE, 4" | 0.36 MILE | $6,930 | $7,500 | $6,930 | $8,800 |
| 644E00300 CENTER LINE | 0.2 MILE | $11,965 | $13,000 | $11,965 | $15,175 |
| 644E00500 STOP LINE | 36 FT | $11.65 | $13.00 | $11.65 | $15.00 |
| 644E01500 DOTTED LINE, 4" | 139 FT | $3.00 | $3.50 | $3.00 | $4.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 24 HOUR | $78.00 | $90.00 | $85.00 | $89.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 16 EACH | $12.00 | $30.25 | $28.00 | $35.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 16 EACH | $10.00 | $39.00 | $36.00 | $45.00 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.07 MILE | $17,750 | $19,200 | $17,750 | $22,500 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 0.08 MILE | $15,250 | $16,500 | $15,250 | $19,300 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.51 MILE | $6,850 | $7,400 | $6,850 | $8,700 |
| 614E24400 WORK ZONE DOTTED LINE, CLASS I, 4", 740.06, TYPE I | 120 FT | $4.00 | $4.35 | $4.00 | $5.00 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 54 FT | $12.00 | $13.00 | $12.00 | $15.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $5,400 | $6,300 | $9,500 | $1,200 |
| 616E10000 WATER | 4 MGAL | $100 | $1.00 | $100 | $1.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $2,500 | $2,700 | $2,500 | $3,100 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,700 | $9,205 | $5,330 | $9,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,200 | $44,800 | $45,500 | $36,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,000 | $11,525 | $8,000 | $4,050 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 267 CY | $350 | $93k | 16% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 200 CY | $350 | $70k | 12% |
| 203E10000 EXCAVATION | 1,595 CY | $22 | $35k | 6% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (87 CY | $400 | $35k | 6% |
| 304E20000 AGGREGATE BASE | 330 CY | $88 | $29k | 5% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 62 CY | $400 | $25k | 4% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 571 FT | $40 | $23k | 4% |
| 202E23000 PAVEMENT REMOVED | 1,478 SY | $15 | $22k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 3% |
| 410E10000 TRAFFIC COMPACTED SURFACE, TYPE A | 200 CY | $95 | $19k | 3% |