MOE-SR 78-08.63
MOE County · est $0.5M
Bid dateThursday, May 11—
MOE County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 46 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Ohio-west Virginia Excavating CO | R3Alan Stone CO INC | R4Wolf Creek Contracting Company LLC | % of bid |
|---|---|---|---|---|---|---|
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 237 CY | $300 | $365 | $375 | $300 | 17% |
| 602E20000 CONCRETE MASONRY | 26.8 CY | $2,500 | $1,740 | $2,495 | $1,537 | 16% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 57 CY | $675 | $366 | $364 | $390 | 9% |
| 611E23600 60" CONDUIT, TYPE A, 706.02, 707.33, 707.35, 707.6 | 52 FT | $550 | $388 | $310 | $262 | 7% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 5,503 SY | $4.50 | $3.50 | $3.00 | $1.50 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $22,500 | $46,000 | $40,000 |
| Item | Quantity | R1Shelly & Sands INC | R2Ohio-west Virginia Excavating CO | R3Alan Stone CO INC | R4Wolf Creek Contracting Company LLC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,200 | $3,500 | $4,000 | $2,465 |
| 202E20010 HEADWALL REMOVED | 2 EACH | $300 | $3,500 | $500 | $714 |
| 202E23000 PAVEMENT REMOVED | 209 SY | $14.00 | $25.00 | $23.54 | $41.32 |
| 202E30000 WALK REMOVED | 632 SF | $3.00 | $3.00 | $8.30 | $4.50 |
| 202E32000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $46,606 |
| 5% |
| 253E02000 PAVEMENT REPAIR | 75 CY | $275 | $416 | $333 | $420 | 5% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 178 CY | $115 | $164 | $133 | $176 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $14,950 | $16,500 | $33,040 | 5% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,000 | $11,000 | $10,000 | $18,595 | 4% |
| 630E97700 SIGNING, MISC.: FLASHING LED WARNING SIGN ASSEMBLY | 2 EACH | $7,350 | $9,000 | $5,000 | $3,919 | 4% |
| 611E98151 CATCH BASIN, NO. 3, AS PER PLAN | 4 EACH | $3,500 | $3,050 | $5,000 | $5,361 | 3% |
| 609E26000 CURB, TYPE 6 | 151 FT | $70.00 | $62.00 | $63.00 | $71.83 | 3% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,320 | $2,500 | $2,450 | $2,683 | 2% |
| 608E52000 CURB RAMP | 427 SF | $21.00 | $7.00 | $30.62 | $20.84 | 2% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 112 SY | $75.00 | $136 | $101 | $177 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 220 FT | $32.00 | $28.50 | $21.00 | $78.14 | 2% |
| 611E07600 18" CONDUIT, TYPE C | 51 FT | $110 | $70.00 | $80.00 | $74.74 | 1% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 17 SY | $330 | $254 | $250 | $1,077 | 1% |
| 202E58201 INLET REMOVED, AS PER PLAN | 5 EACH | $1,000 | $1,088 | $1,000 | $974 | 1% |
| 214 FT |
| $9.00 |
| $9.00 |
| $25.00 |
| $17.09 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 82 FT | $30.00 | $28.00 | $30.00 | $59.38 |
| 202E35200 PIPE REMOVED, OVER 24" | 59 FT | $17.00 | $77.00 | $30.00 | $50.80 |
| 202E98200 REMOVAL MISC.: CONDUIT | 20 FT | $37.00 | $90.00 | $30.00 | $56.91 |
| 204E10000 SUBGRADE COMPACTION | 230 SY | $7.50 | $5.50 | $4.62 | $5.75 |
| 209E98300 LINEAR GRADING, MISC.: RESHAPING GRAVEL PAVEMENT | 15 SY | $30.00 | $75.00 | $44.12 | $38.64 |
| 608E10000 4" CONCRETE WALK | 233 SF | $17.00 | $13.00 | $20.73 | $34.12 |
| 608E53020 DETECTABLE WARNING | 8 SF | $55.00 | $36.00 | $21.00 | $49.56 |
| 202E58400 INLET ABANDONED | 1 EACH | $550 | $1,500 | $1,500 | $3,747 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 7 CY | $250 | $322 | $134 | $320 |
| 659E10000 SEEDING AND MULCHING | 417 SY | $6.00 | $7.00 | $4.27 | $7.20 |
| 659E14000 REPAIR SEEDING AND MULCHING | 21 SY | $6.00 | $7.00 | $2.89 | $7.20 |
| 659E20000 COMMERCIAL FERTILIZER | 0.04 TON | $1,400 | $1,700 | $980 | $1,680 |
| 659E31000 LIME | 0.09 ACRE | $100 | $125 | $400 | $120 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 601E37500 PAVED GUTTER, TYPE 1-2 | 21 FT | $150 | $131 | $160 | $221 |
| 605E31100 AGGREGATE DRAINS | 24 FT | $18.00 | $23.00 | $77.00 | $46.29 |
| 611E04400 12" CONDUIT, TYPE B | 30 FT | $100 | $87.00 | $60.00 | $132 |
| 611E04600 12" CONDUIT, TYPE C | 6 FT | $150 | $140 | $50.00 | $219 |
| 611E97400 CONDUIT, MISC.: TYPE F FOR DRAINAGE DISCHARGE CONT | 20 FT | $20.00 | $87.50 | $530 | $195 |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 1 EACH | $2,900 | $2,400 | $3,261 | $4,960 |
| 611E98371 CATCH BASIN, NO. 6, AS PER PLAN | 2 EACH | $2,500 | $2,900 | $3,100 | $5,179 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $2,000 | $2,625 | $2,288 | $4,794 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $750 | $802 | $2,500 | $1,841 |
| 304E20000 AGGREGATE BASE | 38 CY | $125 | $208 | $104 | $176 |
| 407E20000 NON-TRACKING TACK COAT | 454 GAL | $3.25 | $7.00 | $5.15 | $6.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 5 EACH | $145 | $185 | $91.01 | $60.78 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 3 EACH | $285 | $300 | $128 | $101 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.12 MILE | $2,880 | $7,800 | $6,519 | $3,456 |
| 642E00300 CENTER LINE, TYPE 1 | 0.4 MILE | $2,880 | $3,600 | $11,359 | $3,456 |
| 645E00622 CROSSWALK LINE, 12", TYPE A2 | 49 FT | $18.00 | $25.00 | $35.00 | $21.60 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 4 EACH | $110 | $130 | $48.40 | $105 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $3,800 | $4,500 | $3,310 | $4,702 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 3 CY | $225 | $700 | $98.14 | $150 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 11 EACH | $12.00 | $40.25 | $22.29 | $17.98 |
| 614E13360 OBJECT MARKER, TWO WAY | 11 EACH | $14.00 | $50.00 | $27.20 | $24.82 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 1.57 MILE | $2,250 | $2,800 | $11,208 | $3,977 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 1.06 MILE | $2,050 | $2,500 | $4,151 | $3,977 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 22 FT | $12.00 | $15.00 | $12.00 | $6.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $2,400 | $2,300 | $15,000 | $1,982 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,625 | $7,305 | $4,200 | $6,545 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,700 | $1,885 | $12,000 | $8,160 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 237 CY | $300 | $71k | 14% |
| 602E20000 CONCRETE MASONRY | 26.8 CY | $2,500 | $67k | 13% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 57 CY | $675 | $38k | 8% |
| 611E23600 60" CONDUIT, TYPE A, 706.02, 707.33, 707.35, 707.6 | 52 FT | $550 | $29k | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 5,503 SY | $4.5 | $25k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $22,500 | $23k | 5% |
| 253E02000 PAVEMENT REPAIR | 75 CY | $275 | $21k | 4% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 178 CY | $115 | $20k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,000 | $15k | 3% |