HAM-SR 4-07.00 Sidewalk
HAM County · est $0.5M
Bid dateThursday, September 28—
HAM County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 80 more items below.
| Item | Quantity | R1Adleta INC | R2Prus Construction Company | R3Sunesis Construction CO | R4Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 739 CY | $76.39 | $35.00 | $54.95 | $40.00 | 17% |
| 608E12000 5" CONCRETE WALK | 4,265 SF | $11.11 | $13.00 | $8.50 | $18.00 | 14% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 756 FT | $39.04 | $47.00 | $51.24 | $80.00 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $25,000 | $41,690 | $20,000 | 6% |
| 870E10000 PREFABRICATED MODULAR RETAINING WALL | 105 SF | $159 | $200 | $159 | $400 | 5% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 564 FT | $28.36 | $26.00 | $30.14 | $35.00 |
| Item | Quantity | R1Adleta INC | R2Prus Construction Company | R3Sunesis Construction CO | R4Complete General Construction Company |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,358 | $11,500 | $13,985 | $24,000 |
| 202E30000 WALK REMOVED | 703 SF | $2.73 | $4.00 | $10.83 | $10.00 |
| 202E32000 CURB REMOVED | 426 FT | $9.19 | $15.00 | $9.60 | $14.00 |
| 202E32500 CURB AND GUTTER REMOVED | 314 FT | $9.19 | $19.00 | $16.65 | $19.00 |
| 204E10000 SUBGRADE COMPACTION | 910 SY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,172 | $45,000 | $162,931 | $144,000 | 4% |
| 203E10000 EXCAVATION | 236 CY | $61.69 | $55.00 | $27.92 | $45.00 | 4% |
| 690E98000 SPECIAL - BUS STOP SHELTER | 1 EACH | $13,951 | $26,500 | $33,090 | $35,000 | 4% |
| 608E52000 CURB RAMP | 593 SF | $22.39 | $20.00 | $41.10 | $32.00 | 4% |
| 661E40120 DECIDUOUS TREE, 3" CALIPER, QUERCUS ROBUR 'FASTIGI | 7 EACH | $1,579 | $1,600 | $1,135 | $1,435 | 3% |
| 680E43100 SPECIAL - COMPLETE IRRIGATION SYSTEM | 1 EACH | $11,000 | $15,000 | $9,782 | $20,000 | 3% |
| 632E64020 PEDESTAL FOUNDATION | 4 EACH | $2,696 | $1,550 | $1,395 | $1,950 | 3% |
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 35 CY | $307 | $360 | $779 | $400 | 3% |
| 661E99900 PLANTING, MISC.: FLOWERING TREE, 2-1/2", CERCIS CA | 7 EACH | $1,485 | $1,500 | $1,050 | $1,350 | 3% |
| 304E20000 AGGREGATE BASE, 6" DEPTH | 148 CY | $69.16 | $150 | $191 | $120 | 3% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 202E23000 PAVEMENT REMOVED | 313 SY | $25.21 | $55.00 | $46.10 | $30.00 | 2% |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 10 EACH | $666 | $900 | $800 | $700 | 2% |
| 644E00630 CROSSWALK LINE, 24" | 740.5 FT | $8.80 | $6.00 | $5.17 | $5.17 | 2% |
| $6.11 |
| $2.70 |
| $9.14 |
| $9.00 |
| 690E98000 SPECIAL - BUS STOP BENCH | 1 EACH | $3,325 | $2,500 | $4,757 | $3,000 |
| 690E98000 SPECIAL - REMOVE IRRIGATION QUCIK DISCONNECT | 2 EACH | $110 | $175 | $251 | $2,000 |
| 690E98100 SPECIAL -REMOVE IRRIGATION LINE | 436 FT | $2.20 | $4.00 | $8.90 | $3.58 |
| 690E98400 SPECIAL - REMOVE IRRIGATION SYSTEM | 1 LS | $1,439 | $2,500 | $1,940 | $16,644 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $1,100 | $1,500 | $7,376 | $5,000 |
| 616E10000 WATER | 1 MGAL | $110 | $135 | $205 | $4,392 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 48 FT | $41.32 | $45.00 | $30.04 | $20.00 |
| 611E00901 6" CONDUIT, TYPE B, AS PER PLAN, FOR DRAINAGE CONN | 100 FT | $37.40 | $28.00 | $24.29 | $80.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 3 EACH | $686 | $1,250 | $811 | $2,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $3,366 | $550 | $579 | $1,000 |
| 407E10000 TACK COAT | 10 GAL | $11.00 | $11.00 | $71.55 | $10.00 |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 7 CY | $430 | $700 | $1,206 | $1,000 |
| 451E10011 6" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, AS P | 11 SY | $133 | $220 | $112 | $450 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 2 SY | $174 | $520 | $140 | $800 |
| 690E98400 SPECIAL -CONSULTANT FOR CONCRETE QUALITY CONTROL I | 1 LS | $1,100 | $11,000 | $11,592 | $15,000 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 3 EACH | $58.60 | $500 | $151 | $350 |
| 625E31600 PULL BOX, MISC.:ADJUST TO GRADE | 3 EACH | $165 | $350 | $250 | $400 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 0.75 SF | $55.00 | $350 | $45.00 | $280 |
| 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 1 EACH | $275 | $84.00 | $75.00 | $3,965 |
| 644E00104 EDGE LINE, 6" | 0.06 MILE | $10,450 | $7,324 | $6,539 | $6,539 |
| 644E00204 LANE LINE, 6" | 0.09 MILE | $6,050 | $2,600 | $2,329 | $2,329 |
| 644E00300 CENTER LINE | 0.11 MILE | $12,100 | $11,000 | $9,503 | $9,503 |
| 644E00400 CHANNELIZING LINE, 8" | 63 FT | $3.03 | $2.00 | $1.71 | $1.71 |
| 644E00404 CHANNELIZING LINE, 12" | 430 FT | $3.30 | $2.60 | $2.32 | $2.32 |
| 644E00500 STOP LINE | 77 FT | $14.08 | $11.75 | $10.39 | $10.39 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 194.81 FT | $6.60 | $8.00 | $6.84 | $6.85 |
| 644E01300 LANE ARROW | 4 EACH | $253 | $150 | $97.94 | $97.94 |
| 644E01400 WORD ON PAVEMENT, 72" | 1 EACH | $275 | $250 | $199 | $199 |
| 625E25301 CONDUIT, 1-1/2", 725.04, AS PER PLAN | 52 FT | $14.19 | $30.00 | $26.80 | $31.00 |
| 625E25400 CONDUIT, 2", 725.04 | 17 FT | $14.19 | $45.00 | $39.80 | $46.00 |
| 625E29000 TRENCH | 59 FT | $12.38 | $17.00 | $14.90 | $12.00 |
| 625E32000 GROUND ROD | 4 EACH | $418 | $415 | $370 | $325 |
| 630E79001 SIGN HANGER ASSEMBLY, SPAN WIRE, AS PER PLAN | 12 EACH | $330 | $750 | $319 | $740 |
| 630E80100 SIGN, FLAT SHEET | 82 SF | $33.00 | $65.00 | $26.50 | $22.50 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 14 EACH | $138 | $265 | $52.00 | $95.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 1 EACH | $66.00 | $70.00 | $26.00 | $65.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 10 EACH | $77.00 | $42.50 | $38.00 | $35.00 |
| 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN | 10 EACH | $292 | $285 | $255 | $300 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 241 FT | $2.31 | $3.65 | $3.25 | $3.50 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 1,209 FT | $2.59 | $4.25 | $3.65 | $4.50 |
| 632E89802 PEDESTAL, 5', TRANSFORMER BASE | 1 EACH | $1,524 | $815 | $728 | $775 |
| 632E89804 PEDESTAL, 7', TRANSFORMER BASE | 3 EACH | $1,579 | $850 | $757 | $850 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM, AND | 6 EACH | $220 | $120 | $105 | $250 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM, AND | 6 EACH | $220 | $58.00 | $52.00 | $150 |
| 632E90500 SIGNALIZATION, MISC.:UNLASH AND RELASH MESSENGER W | 465 FT | $11.99 | $6.25 | $5.65 | $8.25 |
| 633E99400 CONTROLLER ITEM, MISC.:CONTROLLER PROGRAMMING | 1 HOUR | $2,585 | $123 | $110 | $3,150 |
| 659E98000 SEEDING, MISC.: SEEDED FESCUE LAWN, AS PER PLAN | 1,335 SY | $4.60 | $5.15 | $33.99 | $4.60 |
| 661E40100 DECIDUOUS TREE, 2-1/2" CALIPER, CARYA OVATA, B&B | 4 EACH | $1,485 | $1,500 | $1,050 | $1,350 |
| 661E40100 DECIDUOUS TREE, 2-1/2" CALIPER, LIQUIDAMBER STYRAC | 3 EACH | $1,293 | $1,300 | $875 | $1,175 |
| 661E40120 DECIDUOUS TREE, 3" CALIPER, ACER RUBRUM 'OCTOBER G | 3 EACH | $1,315 | $1,350 | $895 | $1,195 |
| 661E40120 DECIDUOUS TREE, 3" CALIPER, ACER SACCHARUM 'GREEN | 2 EACH | $1,485 | $1,500 | $1,050 | $1,350 |
| 661E40120 DECIDUOUS TREE, 3" CALIPER, CLADRASTIS KENTUKEA, B | 3 EACH | $1,485 | $1,500 | $1,050 | $1,350 |
| 661E40120 DECIDUOUS TREE, 3" CALIPER, LIRIODENRON TULLIPIFER | 3 EACH | $1,386 | $1,400 | $960 | $1,260 |
| 661E40120 DECIDUOUS TREE, 3" CALIPER, METASEQUOIA GLPYTOSTRO | 2 EACH | $1,293 | $1,300 | $875 | $1,175 |
| 661E40120 DECIDUOUS TREE, 3" CALIPER, ULMUS X 'FRONTIER', B& | 2 EACH | $1,386 | $1,400 | $960 | $1,260 |
| 661E50160 EVERGREEN TREE, 8' HEIGHT, THUJA PLICATA 'GROVEPLI | 3 EACH | $1,100 | $1,125 | $700 | $1,000 |
| 661E99900 PLANTING, MISC.: FLOWERING TREE, 2-1/2", AMELANCHI | 4 EACH | $1,007 | $1,025 | $615 | $915 |
| 661E99900 PLANTING, MISC.: FLOWERING TREE, 2-1/2", ASIMINA T | 4 EACH | $1,386 | $1,400 | $960 | $1,260 |
| 661E99900 PLANTING, MISC.: FLOWERING TREE, 2-1/2", NYSSA SYL | 2 EACH | $1,386 | $1,400 | $960 | $1,260 |
| 661E99920 PLANTING, MISC.: TOPSOIL AND MULCH AT PERENNIAL BE | 605 SF | $7.15 | $7.25 | $6.50 | $6.50 |
| 614E12800 WORK ZONE RAISED PAVEMENT MARKER | 28 EACH | $55.00 | $7.00 | $6.00 | $210 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 1 MILE | $2,750 | $15,000 | $12,900 | $12,900 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 1 MILE | $1,100 | $11,000 | $9,500 | $9,500 |
| 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 740.06, | 758 FT | $2.20 | $3.25 | $2.90 | $2.90 |
| 614E30400 WORK ZONE ARROW, CLASS I, 740.06, TYPE I | 4 EACH | $275 | $250 | $220 | $220 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 4 SY | $174 | $350 | $136 | $400 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 13 SY | $297 | $85.00 | $92.88 | $50.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $1,804 | $380 | $579 | $300 |
| 870E11000 WALL EXCAVATION | 12 CY | $61.75 | $145 | $65.71 | $200 |
| 870E11100 NATURAL SOIL | 5 CY | $57.68 | $200 | $36.50 | $160 |
| 870E12000 6" DRAINAGE PIPE, PERFORATED | 29 FT | $41.32 | $30.00 | $16.02 | $50.00 |
| 870E12100 6" DRAINAGE PIPE, NON-PERFORATED | 20 FT | $60.93 | $14.00 | $23.70 | $45.00 |
| 870E14000 ON-SITE ASSISTANCE | 2 DAY | $715 | $250 | $0.01 | $1,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,526 | $65,000 | $5,041 | $7,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,650 | $12,000 | $9,900 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 739 CY | $76.39 | $56k | 11% |
| 608E12000 5" CONCRETE WALK | 4,265 SF | $11.11 | $47k | 9% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 756 FT | $39.04 | $30k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 4% |
| 870E10000 PREFABRICATED MODULAR RETAINING WALL | 105 SF | $159.39 | $17k | 3% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 564 FT | $28.36 | $16k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,172 | $15k | 3% |
| 203E10000 EXCAVATION | 236 CY | $61.69 | $15k | 3% |
| 690E98000 SPECIAL - BUS STOP SHELTER | 1 EACH | $13,951 | $14k | 3% |
| 608E52000 CURB RAMP | 593 SF | $22.39 | $13k | 3% |