HIG-Leesburg-SRTS
HIG County · est $0.2M
Bid dateThursday, November 30—
HIG County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 22 more items below.
| Item | Quantity | R1Fillmore Construction | R2Axis Civil Construction LLC | R3Kt Holden Construction LLC | R4Alan Stone CO INC | % of bid |
|---|---|---|---|---|---|---|
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 96 CY | $270 | $450 | $515 | $400 | 18% |
| 659E00300 TOPSOIL | 250 CY | $60.00 | $60.00 | $60.00 | $30.00 | 11% |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 11% |
| 630E97700 SIGNING, MISC.:SOLAR-POWERED RECTANGULAR RAPID FLA | 2 EACH | $7,000 | $6,912 | $7,000 | $8,000 | 10% |
| 304E20000 AGGREGATE BASE | 210 CY | $60.00 | $100 | $90.00 | $90.00 | 9% |
| 203E10000 EXCAVATION | 493 CY | $20.00 | $25.00 | $67.00 |
| Item | Quantity | R1Fillmore Construction | R2Axis Civil Construction LLC | R3Kt Holden Construction LLC | R4Alan Stone CO INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $100 | $7,000 | $1,000 | $2,000 |
| 202E75000 FENCE REMOVED | 62 FT | $10.00 | $13.00 | $4.50 | $10.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 30 CY | $50.00 | $30.00 | $35.00 | $40.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $150 | $235 | $130 | $220 |
| 204E50000 GEOTEXTILE FABRIC |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $45.00 |
| 7% |
| 203E20000 EMBANKMENT | 153 CY | $50.00 | $25.00 | $60.00 | $40.00 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,500 | $6,000 | $3,000 | $15,000 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $4,500 | $20,000 | $10,000 | $26,000 | 3% |
| 659E10000 SEEDING AND MULCHING | 2,248 SY | $2.00 | $1.60 | $2.70 | $1.50 | 3% |
| 204E10000 SUBGRADE COMPACTION | 1,261 SY | $3.00 | $3.00 | $4.50 | $4.00 | 3% |
| 611E07200 18" CONDUIT, TYPE A, 706.02, 707.01, OR 707.02 | 36 FT | $100 | $150 | $160 | $250 | 3% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 30 CY | $100 | $120 | $105 | $50.00 | 2% |
| 630E80100 SIGN, FLAT SHEET | 108 SF | $25.16 | $25.16 | $25.16 | $30.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $1,800 | $4,520 | $1,500 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $9,000 | $7,000 | $8,000 | 2% |
| 645E30000 REMOVAL OF PAVEMENT MARKINGS | 30 FT | $82.45 | $87.75 | $87.78 | $100 | 2% |
| 608E53020 DETECTABLE WARNING | 40 SF | $50.00 | $50.00 | $55.89 | $130 | 1% |
| 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1 | 97 FT | $19.00 | $16.00 | $16.00 | $20.00 | 1% |
| 632E64020 PEDESTAL FOUNDATION | 2 EACH | $860 | $860 | $860 | $1,000 | 1% |
| 50 SY |
| $5.00 |
| $8.00 |
| $10.00 |
| $10.00 |
| 607E23000 FENCE, TYPE CLT | 44 FT | $30.00 | $86.50 | $86.50 | $95.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $150 | $75.00 | $100 |
| 659E14000 REPAIR SEEDING AND MULCHING | 113 SY | $2.00 | $1.60 | $3.00 | $1.50 |
| 659E15000 INTER-SEEDING | 113 SY | $2.00 | $1.60 | $3.00 | $1.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.3 TON | $1,000 | $1,400 | $760 | $1,400 |
| 659E31000 LIME | 0.46 ACRE | $1,000 | $100 | $50.00 | $450 |
| 659E35000 WATER | 12 MGAL | $10.00 | $1.00 | $50.00 | $1.00 |
| 659E40000 MOWING | 5 MSF | $100 | $450 | $100 | $15.00 |
| 602E20000 CONCRETE MASONRY | 0.7 CY | $2,000 | $8,500 | $2,000 | $3,500 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 32 FT | $5.00 | $12.00 | $15.00 | $10.00 |
| 408E10000 PRIME COAT | 64 GAL | $10.00 | $10.00 | $10.00 | $4.00 |
| 625E32000 GROUND ROD | 2 EACH | $278 | $278 | $278 | $300 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 67 FT | $21.00 | $2.94 | $20.94 | $25.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $45.25 | $45.25 | $45.25 | $50.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $20.84 | $45.25 | $20.84 | $25.00 |
| 642E00630 CROSSWALK LINE, 24", TYPE 1 | 70 FT | $19.00 | $16.00 | $16.00 | $20.00 |
| 642E20802 YIELD LINE, TYPE 1 | 20 FT | $21.10 | $32.50 | $32.00 | $40.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 96 CY | $270 | $26k | 17% |
| 659E00300 TOPSOIL | 250 CY | $60 | $15k | 10% |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1 | $15k | 10% |
| 630E97700 SIGNING, MISC.:SOLAR-POWERED RECTANGULAR RAPID FLA | 2 EACH | $7,000 | $14k | 9% |
| 304E20000 AGGREGATE BASE | 210 CY | $60 | $13k | 8% |
| 203E10000 EXCAVATION | 493 CY | $20 | $10k | 6% |
| 203E20000 EMBANKMENT | 153 CY | $50 | $8k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,500 | $7k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $4,500 | $5k | 3% |
| 659E10000 SEEDING AND MULCHING | 2,248 SY | $2 | $4k | 3% |