MAR-US 23-03.32/03.93, MAR-SR 423-01.60
MAR County · est $1.1M
Bid dateThursday, January 11—
MAR County · est $1.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 54 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Park Enterprise Construction CO INC | R3Eclipse CO LLC | R4Rietschlin Construction INC | % of bid |
|---|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 607 CY | $250 | $214 | $253 | $267 | 19% |
| 607E15000 FENCE, TYPE 47 | 10,506 FT | $9.00 | $8.45 | $14.00 | $9.50 | 12% |
| 659E00300 TOPSOIL | 1,055 CY | $50.00 | $28.28 | $74.00 | $45.00 | 6% |
| 203E20000 EMBANKMENT | 2,049 CY | $24.00 | $26.60 | $17.00 | $29.50 | 6% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 3,431 SY | $14.00 | $13.60 | $12.00 | $21.50 | 6% |
| 304E20000 AGGREGATE BASE | 523 CY | $85.00 | $68.84 | $93.00 | $96.00 | 5% |
| Item | Quantity | R1Shelly & Sands INC | R2Park Enterprise Construction CO INC | R3Eclipse CO LLC | R4Rietschlin Construction INC |
|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 2 EACH | $250 | $201 | $461 | $750 |
| 202E20011 HEADWALL REMOVED, AS PER PLAN | 1 EACH | $650 | $650 | $1,849 | $1,300 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 145 FT | $15.00 | $42.23 | $25.00 | $20.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 92 FT | $40.00 | $162 | $61.00 | $175 |
| 202E58000 MANHOLE REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 203E10000 EXCAVATION | 1,718 CY | $24.00 | $43.28 | $21.00 | $27.50 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $43,061 | $62,474 | $85,000 | 5% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 92 CY | $425 | $322 | $395 | $417 | 5% |
| 442E22400 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 107 CY | $350 | $284 | $326 | $345 | 5% |
| 611E52702 29" X 45" CONDUIT, TYPE B, 706.04 | 76 FT | $400 | $299 | $393 | $490 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $27,000 | $31,019 | $60,208 | $55,000 | 3% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 1,570 FT | $17.00 | $17.83 | $18.00 | $15.50 | 3% |
| 832E30000 EROSION CONTROL | 25,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,960 FT | $12.00 | $35.00 | $29.00 | $24.75 | 3% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 38 CY | $550 | $345 | $837 | $883 | 3% |
| 607E40501 GATE, TYPE 47, AS PER PLAN | 9 EACH | $2,000 | $2,201 | $1,389 | $2,150 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $15,000 | $29,742 | $8,537 | $9,100 | 2% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $15,000 | $13,727 | $9,060 | $14,000 | 2% |
| 611E99575 MANHOLE, NO. 3, AS PER PLAN | 1 EACH | $13,000 | $9,492 | $9,574 | $19,900 | 2% |
| 1 EACH |
| $2,000 |
| $650 |
| $566 |
| $1,800 |
| 202E75000 FENCE REMOVED | 80 FT | $20.00 | $6.46 | $4.00 | $16.00 |
| 204E10000 SUBGRADE COMPACTION | 2,935 SY | $4.00 | $3.23 | $1.00 | $4.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 74 CY | $35.00 | $93.51 | $42.00 | $47.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 74 CY | $70.00 | $69.67 | $75.00 | $74.00 |
| 204E45000 PROOF ROLLING | 4 HOUR | $250 | $289 | $313 | $325 |
| 204E50000 GEOTEXTILE FABRIC | 222 SY | $1.50 | $4.85 | $2.00 | $6.00 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $11,000 | $14,299 | $9,724 | $10,000 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 4 SY | $260 | $257 | $234 | $310 |
| 659E10000 SEEDING AND MULCHING | 9,476 SY | $1.30 | $3.03 | $1.00 | $1.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 474 SY | $0.80 | $4.29 | $1.00 | $1.00 |
| 659E15000 INTER-SEEDING | 474 SY | $0.80 | $4.00 | $1.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 1.28 TON | $950 | $972 | $964 | $1,050 |
| 659E31000 LIME | 1.96 ACRE | $160 | $28.60 | $166 | $200 |
| 659E35000 WATER | 51.18 MGAL | $1.00 | $1.14 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 5,131 SY | $1.50 | $2.23 | $2.00 | $1.75 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,000 | $1,087 | $1,710 | $1,850 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $5,500 | $5,491 | $3,473 | $6,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $10,000 | $12,841 | $9,854 | $11,000 |
| 602E20000 CONCRETE MASONRY | 0.5 CY | $3,500 | $4,606 | $2,820 | $4,000 |
| 605E31100 AGGREGATE DRAINS | 24 FT | $34.00 | $16.69 | $20.00 | $38.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 58 FT | $18.00 | $34.24 | $20.00 | $36.00 |
| 611E01500 6" CONDUIT, TYPE F | 12 FT | $40.00 | $35.81 | $22.00 | $41.00 |
| 611E04600 12" CONDUIT, TYPE C | 12 FT | $300 | $154 | $172 | $220 |
| 611E06400 15" CONDUIT, TYPE D, 706.02 | 54 FT | $145 | $97.77 | $120 | $165 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $490 | $265 | $597 | $410 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIABLE DEPTH | 120 SY | $70.00 | $15.89 | $32.00 | $34.00 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 45 CY | $85.00 | $56.14 | $117 | $85.00 |
| 407E20000 NON-TRACKING TACK COAT | 436 GAL | $3.50 | $9.89 | $3.00 | $3.50 |
| 617E10100 COMPACTED AGGREGATE | 10 CY | $350 | $65.92 | $149 | $150 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 1,904 FT | $2.00 | $3.72 | $3.00 | $4.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 140 FT | $10.00 | $16.16 | $15.00 | $15.75 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 280 FT | $13.00 | $20.24 | $19.00 | $19.75 |
| 630E80100 SIGN, FLAT SHEET | 142.5 SF | $24.00 | $25.11 | $23.00 | $24.50 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 18 EACH | $10.00 | $17.88 | $16.00 | $20.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 5 EACH | $100 | $51.79 | $48.00 | $51.00 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 0.2 MILE | $1,600 | $11,382 | $1,263 | $25,600 |
| 644E00104 EDGE LINE, 6" | 0.54 MILE | $12,000 | $10,078 | $9,271 | $15,100 |
| 644E00300 CENTER LINE | 0.02 MILE | $25,000 | $21,335 | $19,627 | $18,900 |
| 644E00404 CHANNELIZING LINE, 12" | 665 FT | $4.00 | $3.60 | $3.00 | $3.50 |
| 644E01300 LANE ARROW | 8 EACH | $160 | $137 | $126 | $280 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 982 FT | $3.00 | $2.57 | $2.00 | $6.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 125 HOUR | $95.00 | $85.79 | $68.00 | $89.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,200 | $2,781 | $2,179 | $2,300 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $800 | $519 | $158 | $425 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE WAY | 43 EACH | $12.00 | $29.74 | $17.00 | $18.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 43 EACH | $18.00 | $40.04 | $25.00 | $27.00 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 6 SNMT | $1,200 | $1,617 | $1,212 | $1,300 |
| 616E10000 WATER | 1 MGAL | $1,000 | $599 | $28.00 | $20.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $10,295 | $12,524 | $16,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 607 CY | $250 | $152k | 15% |
| 607E15000 FENCE, TYPE 47 | 10,506 FT | $9 | $95k | 9% |
| 659E00300 TOPSOIL | 1,055 CY | $50 | $53k | 5% |
| 203E20000 EMBANKMENT | 2,049 CY | $24 | $49k | 5% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 3,431 SY | $14 | $48k | 5% |
| 304E20000 AGGREGATE BASE | 523 CY | $85 | $44k | 4% |
| 203E10000 EXCAVATION | 1,718 CY | $24 | $41k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 4% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 92 CY | $425 | $39k | 4% |
| 442E22400 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 107 CY | $350 | $37k | 4% |