MEG-Racine Walk/Ride Ph. 4-5-8
MEG County · est $1.8M
Bid dateThursday, March 21—
MEG County · est $1.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 67 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Alan Stone CO INC | R3Allard Excavation LLC | % of bid |
|---|---|---|---|---|---|
| 625E10481 LIGHT POLE, AESTHETIC, AS PER PLAN, 12' MH | 47 EACH | $5,882 | $6,600 | $5,881 | 18% |
| 625E27403 LUMINAIRE, POST TOP, SOLID STATE (LED), AS PER PLA | 77 EACH | $2,249 | $2,500 | $2,249 | 11% |
| 625E24324 1-1/2" DUCT CABLE WITH THREE NO. 6 AWG 2400 VOLT C | 12,634 FT | $9.66 | $10.00 | $9.66 | 8% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 14,872 SF | $8.00 | $14.00 | $9.00 | 8% |
| 625E10481 LIGHT POLE, AESTHETIC, AS PER PLAN, 18' MH | 14 EACH | $8,153 | $9,200 | $8,153 | 7% |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 61 EACH | $1,438 | $1,600 | $1,437 | 6% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 |
| Item | Quantity | R1Axis Civil Construction LLC | R2Alan Stone CO INC | R3Allard Excavation LLC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,500 | $4,600 | $9,900 |
| 202E23000 PAVEMENT REMOVED | 212 SY | $30.00 | $20.00 | $6.00 |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 295 SY | $30.00 | $25.00 | $12.00 |
| 202E30000 WALK REMOVED | 8,978 SF | $1.80 | $3.00 | $5.00 |
| 202E30001 WALK REMOVED, AS PER PLAN | 1,701 SF | $8.50 | $3.00 | $8.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 2,572 FT |
| $31.50 |
| $35.00 |
| $40.00 |
| 5% |
| 611E04400 12" CONDUIT, TYPE B | 361 FT | $180 | $130 | $112 | 4% |
| 870E10001 PREFABRICATED MODULAR RETAINING WALL, AS PER PLAN | 850 SF | $76.00 | $80.00 | $150 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $60,000 | $53,000 | $175,000 | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 83 CY | $650 | $430 | $485 | 3% |
| 608E52000 CURB RAMP | 1,852 SF | $28.00 | $24.00 | $46.00 | 3% |
| 625E34001 POWER SERVICE, AS PER PLAN | 2 EACH | $22,860 | $26,000 | $22,860 | 3% |
| 625E29000 TRENCH | 4,899 FT | $9.20 | $10.00 | $9.20 | 3% |
| 611E98150 CATCH BASIN, NO. 3 | 5 EACH | $9,000 | $4,900 | $5,515 | 3% |
| 625E25900 CONDUIT, JACKED OR DRILLED, 3" | 840 FT | $45.15 | $50.00 | $45.15 | 2% |
| 630E97700 SIGNING, MISC.: POLE MOUNTED SOLAR POWERED RECTANG | 4 EACH | $8,280 | $9,300 | $8,280 | 2% |
| 608E98000 WALKWAY, MISC.:BRICK PAVERS | 1,624 SF | $20.00 | $15.00 | $31.00 | 2% |
| 304E20000 AGGREGATE BASE | 157 CY | $175 | $120 | $126 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $26,000 | $50,000 | $195,000 | 2% |
| 152 FT |
| $25.00 |
| $110 |
| $35.00 |
| 202E53100 MAILBOX REMOVED | 3 EACH | $85.00 | $240 | $49.00 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $1,900 | $240 | $268 |
| 202E98000 REMOVAL MISC.: CONCRETE BLOCK RETAINING WALL | 1 LS | $19,000 | $5,900 | $7,273 |
| 203E10000 EXCAVATION | 721 CY | $35.00 | $35.00 | $52.00 |
| 203E20000 EMBANKMENT | 184 CY | $35.00 | $110 | $36.00 |
| 204E10000 SUBGRADE COMPACTION | 2,563 SY | $1.50 | $4.50 | $4.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $290 | $270 | $241 |
| 690E50000 SPECIAL - MAILBOX SUPPORT, SINGLE | 3 EACH | $250 | $260 | $294 |
| 690E98000 SPECIAL - SAFETY BARRIER PLANTER | 5 EACH | $4,500 | $2,600 | $3,829 |
| 690E98000 SPECIAL - STEEL BENCH | 4 EACH | $3,500 | $3,300 | $3,453 |
| 690E98100 SPECIAL - DECORATIVE BOLLARD FENCE | 47 FT | $395 | $440 | $494 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $130 | $50.00 |
| 659E00300 TOPSOIL | 143 CY | $100 | $25.00 | $60.00 |
| 659E10000 SEEDING AND MULCHING | 1,290 SY | $2.70 | $3.00 | $3.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 65 SY | $2.70 | $5.00 | $0.05 |
| 659E15000 INTER-SEEDING | 65 SY | $2.70 | $5.00 | $0.05 |
| 659E20000 COMMERCIAL FERTILIZER | 0.18 TON | $1,400 | $630 | $625 |
| 659E31000 LIME | 0.27 ACRE | $150 | $900 | $625 |
| 659E35000 WATER | 7 MGAL | $1.00 | $110 | $1.00 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E04600 12" CONDUIT, TYPE C | 5 FT | $180 | $140 | $176 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 5,388 FT | $3.00 | $3.50 | $4.00 |
| 407E20000 NON-TRACKING TACK COAT | 25 GAL | $25.00 | $50.00 | $3.70 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 33 CY | $675 | $590 | $525 |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (17 CY | $675 | $470 | $415 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 52 SY | $90.00 | $290 | $209 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 78 SY | $100 | $180 | $223 |
| 609E26000 CURB, TYPE 6 | 284 FT | $29.00 | $50.00 | $58.00 |
| 638E10500 FIRE HYDRANT REMOVED AND RESET | 1 EACH | $9,000 | $2,900 | $8,856 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 7 EACH | $380 | $400 | $730 |
| 625E00450 CONNECTION, FUSED PULL APART | 183 EACH | $115 | $130 | $114 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 61 EACH | $108 | $120 | $108 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 96 EACH | $178 | $200 | $177 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 2,448 FT | $5.72 | $6.50 | $5.72 |
| 625E30700 PULL BOX, 725.08, 18" | 25 EACH | $1,040 | $1,200 | $1,040 |
| 625E30706 PULL BOX, 725.08, 24" | 3 EACH | $1,247 | $1,400 | $1,247 |
| 625E32000 GROUND ROD | 61 EACH | $310 | $350 | $310 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 4,899 FT | $0.05 | $0.10 | $0.05 |
| 625E98000 LIGHTING, MISC.: CLAMP ON FLOWER POTS | 8 EACH | $888 | $1,000 | $888 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 159 FT | $18.00 | $20.00 | $18.00 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 18 EACH | $195 | $220 | $195 |
| 630E80100 SIGN, FLAT SHEET | 132 SF | $22.75 | $25.00 | $22.75 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 24 EACH | $10.00 | $10.00 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $65.00 | $75.00 | $65.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 13 EACH | $20.00 | $20.00 | $25.00 |
| 642E01200 PARKING LOT STALL MARKING, TYPE 1 | 346 FT | $1.50 | $1.50 | $4.30 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 136 FT | $7.00 | $8.00 | $26.00 |
| 646E10400 STOP LINE | 45 FT | $15.00 | $15.00 | $31.00 |
| 646E10510 CROSSWALK LINE, 12" | 655 FT | $8.00 | $9.00 | $16.00 |
| 646E10520 CROSSWALK LINE, 24" | 82 FT | $14.00 | $15.00 | $31.00 |
| 646E20800 YIELD LINE | 36 FT | $14.00 | $15.00 | $27.75 |
| 870E11000 WALL EXCAVATION | 150 CY | $60.00 | $95.00 | $45.00 |
| 870E11100 NATURAL SOIL | 50 CY | $155 | $60.00 | $44.00 |
| 870E12000 6" DRAINAGE PIPE, PERFORATED | 210 FT | $25.50 | $20.00 | $3.00 |
| 870E12100 6" DRAINAGE PIPE, NON-PERFORATED | 10 FT | $95.00 | $20.00 | $5.00 |
| 870E14000 ON-SITE ASSISTANCE | 2 DAY | $820 | $1,000 | $63.00 |
| 870E15000 PMRW INSPECTION AND COMPACTION TESTING | 1 LS | $2,500 | $5,500 | $4,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $18,000 | $13,000 | $30,400 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $3,500 | $1,200 | $1,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $35,000 | $16,875 |
| 990E25100 UTILITY CONFLICT/DELAYS | 1 LS | $4,000 | $2,500 | $1,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 625E10481 LIGHT POLE, AESTHETIC, AS PER PLAN, 12' MH | 47 EACH | $5,882 | $276k | 13% |
| 625E27403 LUMINAIRE, POST TOP, SOLID STATE (LED), AS PER PLA | 77 EACH | $2,249 | $173k | 8% |
| 625E24324 1-1/2" DUCT CABLE WITH THREE NO. 6 AWG 2400 VOLT C | 12,634 FT | $9.66 | $122k | 6% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 14,872 SF | $8 | $119k | 6% |
| 625E10481 LIGHT POLE, AESTHETIC, AS PER PLAN, 18' MH | 14 EACH | $8,153 | $114k | 6% |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 61 EACH | $1,438 | $88k | 4% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 2,572 FT | $31.5 | $81k | 4% |
| 611E04400 12" CONDUIT, TYPE B | 361 FT | $180 | $65k | 3% |
| 870E10001 PREFABRICATED MODULAR RETAINING WALL, AS PER PLAN | 850 SF | $76 | $65k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $60,000 | $60k | 3% |