WOO-SR 199-09.36 Roundabout
WOO County · est $1.8M
Bid dateThursday, April 4—
WOO County · est $1.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 82 more items below.
| Item | Quantity | R1Great Lakes Demolition Company | R2D L Smith Concrete LLC | R3Gerken Paving INC | R4Vernon Nagel INC | R5Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449), 5" | 964 CY | $205 | $177 | $168 | $192 | $168 | 19% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 573 CY | $250 | $252 | $230 | $230 | $230 | 14% |
| 452E19200 NON-REINFORCED CONCRETE PAVEMENT, MISC.:, 8" | 1,490 SY | $88.00 | $105 | $94.50 | $98.00 | $115 | 13% |
| 304E20000 AGGREGATE BASE | 1,714 CY | $50.00 | $45.00 | $52.00 | $85.00 | $101 | 8% |
| 206E10500 CEMENT | 329 TON | $249 | $218 | $235 | $205 | $205 | 8% |
| 624E10000 |
| Item | Quantity | R1Great Lakes Demolition Company | R2D L Smith Concrete LLC | R3Gerken Paving INC | R4Vernon Nagel INC | R5Eclipse CO LLC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $500 | $15,400 | $19,990 | $3,000 | $9,000 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 912 FT | $18.50 | $10.00 | $60.00 | $8.00 | $25.00 |
| 202E38000 GUARDRAIL REMOVED | 257 FT | $2.00 | $2.00 | $2.00 | $4.00 | $2.00 |
| 202E42206 ANCHOR ASSEMBLY REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $44,650 |
| $18,400 |
| $66,250 |
| $40,000 |
| $66,983 |
| 4% |
| 659E00300 TOPSOIL | 948 CY | $35.00 | $55.00 | $23.00 | $30.00 | $63.00 | 3% |
| 609E31001 COMBINATION CURB AND GUTTER, TYPE 9, AS PER PLAN, | 2,035 FT | $15.00 | $18.50 | $25.00 | $29.00 | $18.50 | 3% |
| 832E30000 EROSION CONTROL | 30,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 206E15020 CEMENT STABILIZED SUBGRADE, 14 INCHES DEEP | 10,877 SY | $2.50 | $3.85 | $4.30 | $6.00 | $6.25 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $27,000 | $22,280 | $20,280 | $16,500 | $22,000 | 3% |
| 611E06100 15" CONDUIT, TYPE C | 515 FT | $50.00 | $75.00 | $75.00 | $85.00 | $99.00 | 3% |
| 203E10000 EXCAVATION | 2,206 CY | $11.50 | $19.44 | $18.50 | $22.00 | $20.00 | 2% |
| 203E20000 EMBANKMENT | 2,141 CY | $11.50 | $22.13 | $18.50 | $12.00 | $16.00 | 2% |
| 605E06020 4" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 2,891 FT | $8.00 | $11.00 | $12.00 | $20.00 | $35.00 | 2% |
| 611E04600 12" CONDUIT, TYPE C | 507 FT | $40.00 | $72.00 | $56.00 | $78.00 | $93.00 | 2% |
| 625E39000 TEMPORARY LIGHTING | 1 LS | $20,000 | $20,000 | $10,565 | $10,565 | $20,000 | 2% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 65 CY | $295 | $193 | $295 | $295 | $295 | 2% |
| 611E05900 15" CONDUIT, TYPE B | 335 FT | $55.00 | $82.00 | $115 | $155 | $109 | 2% |
| 202E23000 PAVEMENT REMOVED | 6,593 SY | $2.75 | $3.79 | $6.00 | $3.00 | $9.00 | 2% |
| 2 EACH |
| $150 |
| $145 |
| $145 |
| $150 |
| $145 |
| 202E53100 MAILBOX REMOVED | 1 EACH | $25.00 | $25.00 | $390 | $100 | $139 |
| 202E58100 CATCH BASIN REMOVED | 7 EACH | $800 | $550 | $1,275 | $350 | $615 |
| 204E10000 SUBGRADE COMPACTION | 93 SY | $2.00 | $1.00 | $7.90 | $1.00 | $3.00 |
| 204E45000 PROOF ROLLING | 6 HOUR | $200 | $150 | $140 | $250 | $324 |
| 206E11000 CURING COAT | 10,877 SY | $1.50 | $1.20 | $0.50 | $1.20 | $1.20 |
| 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS | 1 LS | $7,500 | $7,500 | $13,250 | $6,000 | $8,000 |
| 606E15050 GUARDRAIL, TYPE MGS | 257 FT | $31.00 | $28.00 | $28.00 | $28.00 | $28.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 2 EACH | $2,900 | $28.60 | $2,860 | $2,860 | $2,860 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 1 EACH | $1,420 | $2,250 | $1,700 | $800 | $1,866 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 17 SY | $150 | $225 | $160 | $200 | $143 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 112 CY | $120 | $140 | $72.00 | $150 | $152 |
| 616E10000 WATER | 12 MGAL | $1.00 | $45.00 | $100 | $10.00 | $50.00 |
| 659E10000 SEEDING AND MULCHING | 8,524 SY | $2.00 | $2.50 | $1.50 | $3.00 | $1.10 |
| 659E20000 COMMERCIAL FERTILIZER | 2 TON | $800 | $229 | $800 | $600 | $631 |
| 659E35000 WATER | 47 MGAL | $1.00 | $25.00 | $1.00 | $5.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,000 | $2,000 | $1,650 | $2,500 | $2,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $1,800 | $3,520 | $3,250 | $6,000 | $2,175 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $11,000 | $8,836 | $10,000 | $9,000 | $9,289 |
| 602E20000 CONCRETE MASONRY | 1 CY | $2,020 | $1,500 | $2,500 | $2,500 | $1,594 |
| 605E05210 4" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 980 FT | $8.00 | $11.00 | $11.50 | $20.00 | $31.00 |
| 611E00100 4" CONDUIT, TYPE B | 30 FT | $10.00 | $25.00 | $45.00 | $50.00 | $33.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 103 FT | $10.00 | $12.00 | $43.00 | $35.00 | $34.00 |
| 611E00900 6" CONDUIT, TYPE B | 20 FT | $10.00 | $20.00 | $33.75 | $15.00 | $40.00 |
| 611E01400 6" CONDUIT, TYPE E | 20 FT | $10.00 | $15.00 | $16.50 | $12.00 | $28.00 |
| 611E01500 6" CONDUIT, TYPE F | 20 FT | $10.00 | $15.00 | $22.50 | $12.00 | $28.00 |
| 611E04400 12" CONDUIT, TYPE B | 237 FT | $45.00 | $78.00 | $98.00 | $132 | $103 |
| 611E04900 12" CONDUIT, TYPE D | 50 FT | $45.00 | $73.00 | $49.00 | $107 | $97.00 |
| 611E07600 18" CONDUIT, TYPE C | 62 FT | $70.00 | $115 | $102 | $102 | $112 |
| 611E98370 CATCH BASIN, NO. 6 | 2 EACH | $2,850 | $4,200 | $3,000 | $6,500 | $5,000 |
| 611E98470 CATCH BASIN, NO. 2-2B | 8 EACH | $1,650 | $3,100 | $3,200 | $3,000 | $4,800 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $3,825 | $4,800 | $5,600 | $8,500 | $7,200 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 11 EACH | $200 | $250 | $375 | $500 | $565 |
| 304E20000 AGGREGATE BASE 6" | 16 CY | $50.00 | $45.00 | $70.00 | $100 | $139 |
| 407E10000 TACK COAT | 930 GAL | $1.00 | $3.30 | $2.75 | $2.75 | $2.75 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 16 CY | $500 | $287 | $465 | $465 | $465 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 856 FT | $20.00 | $27.45 | $25.00 | $26.00 | $27.45 |
| 609E26000 CURB, TYPE 6 | 260 FT | $14.00 | $30.00 | $17.25 | $32.00 | $30.00 |
| 609E31001 COMBINATION CURB AND GUTTER, TYPE 9, AS PER PLAN, | 865 FT | $20.00 | $27.45 | $21.00 | $30.00 | $27.45 |
| 617E10100 COMPACTED AGGREGATE | 34 CY | $50.00 | $65.00 | $82.00 | $75.00 | $153 |
| 617E10100 COMPACTED AGGREGATE, TYPE A | 200 CY | $50.00 | $89.00 | $100 | $75.00 | $144 |
| 625E00450 CONNECTION, FUSED PULL APART | 22 EACH | $150 | $150 | $142 | $142 | $150 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 11 EACH | $150 | $150 | $136 | $136 | $150 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 24 EACH | $100 | $100 | $136 | $136 | $100 |
| 625E10503 LIGHT POLE (INSTALLATION ONLY), AS PER PLAN | 11 EACH | $1,000 | $1,000 | $502 | $502 | $1,000 |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 11 EACH | $1,000 | $1,000 | $1,130 | $1,130 | $1,000 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 537 FT | $3.00 | $3.00 | $5.06 | $5.06 | $3.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,342 FT | $1.50 | $1.50 | $2.52 | $2.52 | $1.50 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 1,411 FT | $9.75 | $9.75 | $14.83 | $15.00 | $9.75 |
| 625E25500 CONDUIT, 3", 725.04 | 149 FT | $26.00 | $26.00 | $34.30 | $34.30 | $26.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 11 EACH | $400 | $400 | $562 | $562 | $400 |
| 625E29002 TRENCH, 24" DEEP | 1,420 FT | $8.00 | $8.00 | $7.24 | $7.24 | $8.00 |
| 625E30700 PULL BOX, 725.08, 18" | 6 EACH | $970 | $970 | $1,042 | $1,042 | $970 |
| 625E32000 GROUND ROD | 12 EACH | $250 | $250 | $305 | $305 | $250 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $2,500 | $2,500 | $2,815 | $2,815 | $2,500 |
| 625E34450 CONTROL CENTER CABINET, COMPLETE | 1 EACH | $5,750 | $5,750 | $4,540 | $4,540 | $5,750 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 1,420 FT | $2.00 | $2.00 | $2.26 | $2.26 | $2.00 |
| 632E70200 CONDUIT RISER, 1" DIAMETER | 1 EACH | $300 | $300 | $337 | $337 | $300 |
| 620E70000 DELINEATOR, MISC.:HIGH INTENSITY RETRO-REFLECTIVE | 4 EACH | $565 | $550 | $550 | $550 | $445 |
| 621E00100 RPM (TWO-WAY, YELLOW/YELLOW) | 30 EACH | $165 | $143 | $143 | $143 | $145 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 40 EACH | $50.00 | $2.00 | $5.50 | $22.11 | $5.00 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 611 FT | $15.00 | $12.00 | $12.00 | $15.00 | $15.00 |
| 630E08601 SIGN POST REFLECTOR, AS PER PLAN | 20 EACH | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 630E80100 SIGN, FLAT SHEET | 286 SF | $18.00 | $25.00 | $25.00 | $17.50 | $17.50 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 71 EACH | $10.00 | $20.00 | $20.00 | $10.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 32 EACH | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 630E86292 REMOVAL OF GROUND MOUNTED WOODEN BOX BEAM SUPPORT | 4 EACH | $250 | $250 | $250 | $245 | $245 |
| 630E97700 SIGNING, MISC.: SALVAGE OF EXISTING FLASHING LED S | 2 EACH | $320 | $250 | $250 | $320 | $200 |
| 644E00104 EDGE LINE, 6", WHITE | 1 MILE | $6,000 | $6,000 | $6,000 | $6,000 | $8,270 |
| 644E00104 EDGE LINE, 6", YELLOW | 1 MILE | $6,000 | $6,000 | $6,000 | $6,000 | $8,270 |
| 644E00300 CENTER LINE, DOUBLE YELLOW | 1 MILE | $8,000 | $12,000 | $12,000 | $8,000 | $10,880 |
| 644E00700 TRANSVERSE/DIAGONAL LINE, YELLOW | 96 FT | $8.00 | $12.00 | $12.00 | $8.00 | $14.00 |
| 644E01300 LANE ARROW | 4 EACH | $150 | $150 | $150 | $150 | $245 |
| 644E01510 DOTTED LINE, 6", WHITE | 396 FT | $2.00 | $3.00 | $3.00 | $2.00 | $1.85 |
| 644E20800 YIELD LINE | 143 FT | $15.00 | $15.00 | $15.00 | $15.00 | $25.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $150 | $55.00 | $84.51 | $80.00 | $68.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,000 | $25,000 | $30.25 | $25,000 | $28,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,500 | $6,000 | $8,000 | $13,174 | $22,000 |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 5 MNTH | $1,800 | $500 | $3,000 | $2,500 | $683 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449), 5" | 964 CY | $205 | $198k | 14% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 573 CY | $250 | $143k | 10% |
| 452E19200 NON-REINFORCED CONCRETE PAVEMENT, MISC.:, 8" | 1,490 SY | $88 | $131k | 9% |
| 304E20000 AGGREGATE BASE | 1,714 CY | $50 | $86k | 6% |
| 206E10500 CEMENT | 329 TON | $249 | $82k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $44,650 | $45k | 3% |
| 659E00300 TOPSOIL | 948 CY | $35 | $33k | 2% |
| 609E31001 COMBINATION CURB AND GUTTER, TYPE 9, AS PER PLAN, | 2,035 FT | $15 | $31k | 2% |
| 832E30000 EROSION CONTROL | 30,000 EACH | $1 | $30k | 2% |
| 206E15020 CEMENT STABILIZED SUBGRADE, 14 INCHES DEEP | 10,877 SY | $2.5 | $27k | 2% |