CLE-SR 125-11.98
CLE County · est $1.1M
Bid dateThursday, April 18—
CLE County · est $1.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 50 more items below.
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC | R3Axis Civil Construction LLC | % of bid |
|---|---|---|---|---|---|
| 605E14000 6" BASE PIPE UNDERDRAINS | 6,280 FT | $18.14 | $13.00 | $16.00 | 13% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 502 CY | $225 | $198 | $230 | 13% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 672 CY | $165 | $198 | $205 | 13% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 1,260 CY | $66.13 | $73.00 | $92.00 | 10% |
| 304E20000 AGGREGATE BASE | 826 CY | $76.51 | $82.00 | $90.00 | 7% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,830 FT | $20.22 | $20.22 | $30.00 | 7% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (158 CY |
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC | R3Axis Civil Construction LLC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,500 | $1,000 | $20,000 |
| 203E20000 EMBANKMENT | 69 CY | $55.13 | $25.00 | $32.00 |
| 204E10000 SUBGRADE COMPACTION | 3,783 SY | $1.90 | $3.25 | $3.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $224 | $1,600 | $250 |
| 204E50000 GEOTEXTILE FABRIC | 3,093 SY | $1.99 | $2.50 | $1.30 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $320 |
| $300 |
| $320 |
| 6% |
| 204E13000 EXCAVATION OF SUBGRADE | 1,260 CY | $32.34 | $37.00 | $32.00 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,229 | $32,500 | $60,000 | 5% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,216 | $2,216 | $2,100 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1 1/2") | 8,794 SY | $3.00 | $3.05 | $3.00 | 3% |
| 202E23000 PAVEMENT REMOVED | 3,222 SY | $7.33 | $11.00 | $11.00 | 3% |
| 832E30000 EROSION CONTROL | 20,000 EACH | $1.00 | $1.00 | $1.00 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $30,000 | $40,000 | 2% |
| 203E10000 EXCAVATION | 541 CY | $35.16 | $47.50 | $32.00 | 2% |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 1.52 MILE | $10,557 | $10,557 | $4,930 | 2% |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 1.13 MILE | $13,658 | $13,658 | $7,394 | 2% |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 126 FT | $89.18 | $80.00 | $30.00 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $9,702 | $11,000 | $15,000 | 1% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 30 CY | $305 | $350 | $250 | 1% |
| 3 SY |
| $313 |
| $250 |
| $400 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $145 | $145 | $150 |
| 659E00300 TOPSOIL | 381 CY | $4.15 | $55.00 | $55.00 |
| 659E10000 SEEDING AND MULCHING | 3,431 SY | $1.31 | $1.31 | $2.20 |
| 659E14000 REPAIR SEEDING AND MULCHING | 172 SY | $1.31 | $1.31 | $2.20 |
| 659E20000 COMMERCIAL FERTILIZER | 0.46 TON | $925 | $925 | $1,200 |
| 659E31000 LIME | 0.71 ACRE | $100 | $100 | $150 |
| 659E35000 WATER | 19 MGAL | $1.00 | $1.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,735 | $1,735 | $3,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $3,160 | $3,520 | $6,500 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $8,795 | $10,000 | $10,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 3 EACH | $636 | $300 | $500 |
| 407E20000 NON-TRACKING TACK COAT | 1,115 GAL | $5.00 | $4.00 | $6.00 |
| 617E10100 COMPACTED AGGREGATE | 39 CY | $187 | $255 | $300 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 0.28 MILE | $21,500 | $27,000 | $21,500 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 3 EACH | $125 | $90.00 | $125 |
| 621E00100 RPM | 90 EACH | $56.30 | $56.30 | $52.60 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 60 EACH | $19.78 | $9.00 | $27.05 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 104 FT | $16.00 | $28.44 | $15.50 |
| 630E08600 SIGN POST REFLECTOR | 3 EACH | $60.00 | $80.59 | $55.00 |
| 630E80100 SIGN, FLAT SHEET | 20 SF | $20.00 | $31.04 | $16.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 7 EACH | $95.00 | $78.46 | $45.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $35.00 | $20.83 | $20.00 |
| 644E00104 EDGE LINE, 6" | 0.56 MILE | $5,510 | $5,510 | $4,725 |
| 644E00204 LANE LINE, 6" | 0.56 MILE | $2,625 | $2,625 | $2,000 |
| 644E00300 CENTER LINE | 0.45 MILE | $7,070 | $7,070 | $7,275 |
| 644E00404 CHANNELIZING LINE, 12" | 617 FT | $2.10 | $2.10 | $3.15 |
| 644E00500 STOP LINE | 42 FT | $6.75 | $6.75 | $9.10 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 254 FT | $6.50 | $6.50 | $9.10 |
| 644E01300 LANE ARROW | 6 EACH | $150 | $150 | $145 |
| 647E21012 SPEED MEASUREMENT MARKING, TYPE B125 | 2 EACH | $887 | $250 | $192 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 10 CY | $275 | $250 | $80.00 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 10 CY | $275 | $245 | $80.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $92.21 | $85.00 | $85.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 64 EACH | $14.62 | $14.62 | $20.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 64 EACH | $22.24 | $22.25 | $32.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $992 | $992 | $1,050 |
| 614E20210 WORK ZONE LANE LINE, CLASS I, 6", 740.06, TYPE I | 0.44 MILE | $5,093 | $5,093 | $3,286 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 0.56 MILE | $400 | $400 | $1,643 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.45 MILE | $1,410 | $1,410 | $3,697 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.56 MILE | $1,095 | $1,095 | $2,465 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 617 FT | $1.55 | $1.55 | $3.15 |
| 614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I | 1,320 FT | $1.07 | $1.07 | $16.40 |
| 616E10000 WATER | 30 MGAL | $100 | $45.00 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,782 | $2,832 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 605E14000 6" BASE PIPE UNDERDRAINS | 6,280 FT | $18.14 | $114k | 12% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 502 CY | $225 | $113k | 11% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 672 CY | $165 | $111k | 11% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 1,260 CY | $66.13 | $83k | 8% |
| 304E20000 AGGREGATE BASE | 826 CY | $76.51 | $63k | 6% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,830 FT | $20.22 | $57k | 6% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (158 CY | $320 | $51k | 5% |
| 204E13000 EXCAVATION OF SUBGRADE | 1,260 CY | $32.34 | $41k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,229 | $40k | 4% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,216 | $27k | 3% |