FAI-US 33-12.53
FAI County · est $0.8M
Bid dateThursday, November 14—
FAI County · est $0.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 79 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Shelly & Sands INC | R3Alan Stone CO INC | R4Complete General Construction Company | R5D G M INC | % of bid |
|---|---|---|---|---|---|---|---|
| 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 868 SY | $109 | $140 | $97.00 | $125 | $175 | 16% |
| 203E20000 EMBANKMENT | 3,901 CY | $19.00 | $22.00 | $22.50 | $18.00 | $35.00 | 13% |
| 203E10000 EXCAVATION | 2,569 CY | $19.00 | $18.00 | $4.00 | $45.00 | $30.00 | 8% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,428 FT | $28.00 | $17.00 | $30.00 | $30.00 | $27.50 | 7% |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL (RAMP C & S.R. | 1 EACH | $36,648 | $40,000 | $43,000 | $58,000 | $40,000 | 6% |
| 632E72130 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 12 |
| Item | Quantity | R1Axis Civil Construction LLC | R2Shelly & Sands INC | R3Alan Stone CO INC | R4Complete General Construction Company | R5D G M INC |
|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 274 SY | $25.00 | $16.00 | $30.00 | $32.00 | $12.00 |
| 202E35101 PIPE REMOVED, 24" DIAMETER AND UNDER, AS PER PLAN | 4 FT | $50.00 | $95.00 | $95.00 | $400 | $75.00 |
| 202E38000 GUARDRAIL REMOVED | 300 FT | $2.80 | $3.00 | $5.00 | $2.00 | $2.00 |
| 202E42050 ANCHOR ASSEMBLY REMOVED, TYPE B | 1 EACH |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 2 EACH |
| $17,000 |
| $17,000 |
| $20,000 |
| $17,250 |
| $18,000 |
| 6% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 3 EACH | $9,950 | $9,950 | $12,000 | $8,600 | $11,000 | 5% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 3 EACH | $8,900 | $8,900 | $8,900 | $8,700 | $9,000 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $23,000 | $46,000 | $24,000 | $50,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $20,000 | $26,000 | $45,000 | $40,000 | 4% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 364 FT | $66.00 | $66.00 | $66.00 | $86.00 | $70.00 | 4% |
| 632E72140 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 13 | 1 EACH | $21,000 | $21,000 | $24,500 | $20,250 | $22,500 | 4% |
| 832E30000 EROSION CONTROL | 20,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 2 EACH | $9,500 | $9,500 | $11,000 | $8,200 | $10,000 | 3% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $15,000 | $12,000 | $13,000 | $11,222 | $12,500 | 3% |
| 304E20000 AGGREGATE BASE | 151 CY | $98.00 | $87.00 | $90.00 | $125 | $110 | 2% |
| 633E65521 CABINET, TYPE 332, AS PER PLAN | 1 EACH | $14,000 | $14,000 | $14,000 | $17,850 | $15,000 | 2% |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 6 EACH | $1,800 | $1,800 | $1,800 | $1,500 | $2,000 | 2% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $10,000 | $22,400 | $19,000 | $14,000 | $10,000 | 2% |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 111 SY | $80.00 | $70.00 | $75.00 | $114 | $80.00 | 1% |
| $150 |
| $150 |
| $490 |
| $80.00 |
| $300 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 744 FT | $3.50 | $4.00 | $5.00 | $2.00 | $5.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 275 FT | $21.00 | $21.00 | $26.00 | $23.40 | $50.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 1 EACH | $2,500 | $2,500 | $2,900 | $2,720 | $3,000 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $500 | $500 | $590 | $640 | $4,000 |
| 659E00300 TOPSOIL | 67 CY | $65.00 | $45.00 | $50.00 | $65.00 | $20.00 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 5,657 SY | $0.95 | $0.80 | $1.00 | $0.76 | $1.75 |
| 659E20000 COMMERCIAL FERTILIZER | 0.68 TON | $1,250 | $675 | $660 | $673 | $1,500 |
| 659E31000 LIME | 1.04 ACRE | $150 | $155 | $940 | $151 | $300 |
| 659E35000 WATER | 28 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 600 SY | $3.00 | $1.60 | $3.00 | $1.57 | $3.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,000 | $2,000 | $2,300 | $2,000 | $2,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $8,100 | $9,000 | $14,000 | $8,100 | $8,500 |
| 611E00406 4" CONDUIT, TYPE F | 15 FT | $20.00 | $40.00 | $65.00 | $125 | $40.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $650 | $550 | $720 | $1,000 | $400 |
| 204E10000 SUBGRADE COMPACTION | 987 SY | $5.00 | $5.00 | $4.50 | $5.00 | $2.50 |
| 408E10001 PRIME COAT, AS PER PLAN | 67 GAL | $15.00 | $12.00 | $15.00 | $20.00 | $10.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 23 CY | $120 | $80.00 | $120 | $125 | $150 |
| 625E24330 1-1/2" DUCT CABLE WITH THREE NO. 2 AWG 2400 VOLT C | 86 FT | $15.00 | $15.00 | $15.00 | $18.00 | $16.00 |
| 625E25500 CONDUIT, 3", 725.04 | 16 FT | $44.00 | $44.00 | $44.00 | $37.00 | $50.00 |
| 625E29002 TRENCH, 24" DEEP | 76 FT | $14.00 | $14.00 | $14.00 | $8.50 | $15.00 |
| 625E30700 PULL BOX, 725.08, 18" | 1 EACH | $1,000 | $1,000 | $1,000 | $1,300 | $1,100 |
| 625E31510 PULL BOX REMOVED | 1 EACH | $175 | $175 | $175 | $200 | $200 |
| 621E00100 RPM | 68 EACH | $75.00 | $59.00 | $90.00 | $75.00 | $75.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 31 EACH | $25.00 | $25.00 | $30.00 | $48.00 | $5.00 |
| 630E02101 GROUND MOUNTED SUPPORT, NO. 2 POST, AS PER PLAN | 56 FT | $14.00 | $14.00 | $15.00 | $25.00 | $25.00 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 60 FT | $14.50 | $14.50 | $15.00 | $27.20 | $25.00 |
| 630E08600 SIGN POST REFLECTOR | 16 EACH | $50.00 | $50.00 | $60.00 | $50.00 | $75.00 |
| 630E80100 SIGN, FLAT SHEET | 94 SF | $24.00 | $24.00 | $30.00 | $24.50 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 9 EACH | $20.00 | $20.00 | $25.00 | $15.00 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 5 EACH | $20.00 | $20.00 | $25.00 | $20.00 | $20.00 |
| 646E10010 EDGE LINE, 6" | 0.15 MILE | $12,900 | $12,000 | $12,000 | $12,900 | $17,000 |
| 646E10110 LANE LINE, 6" | 0.15 MILE | $8,720 | $12,000 | $5,900 | $8,720 | $17,000 |
| 646E10200 CENTER LINE | 0.16 MILE | $19,800 | $12,000 | $23,000 | $19,800 | $27,000 |
| 646E10310 CHANNELIZING LINE, 12" | 770 FT | $3.50 | $2.50 | $4.00 | $3.50 | $8.00 |
| 646E10400 STOP LINE | 126 FT | $12.00 | $11.00 | $15.00 | $12.00 | $25.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 84 FT | $12.00 | $11.00 | $15.00 | $12.00 | $25.00 |
| 646E10800 ISLAND MARKING | 94 SF | $5.00 | $10.00 | $7.50 | $5.00 | $12.00 |
| 646E20300 LANE ARROW | 11 EACH | $150 | $165 | $230 | $150 | $400 |
| 646E20320 WRONG WAY ARROW | 1 EACH | $300 | $200 | $260 | $300 | $800 |
| 646E20410 WORD ON PAVEMENT, 96" | 3 EACH | $250 | $200 | $260 | $250 | $450 |
| 646E50000 REMOVAL OF PAVEMENT MARKING | 6 EACH | $200 | $200 | $590 | $434 | $350 |
| 625E25402 CONDUIT, 2", 725.05 | 234 FT | $13.00 | $13.00 | $13.00 | $10.00 | $14.00 |
| 625E25502 CONDUIT, 3", 725.05 | 14 FT | $24.00 | $24.00 | $24.00 | $15.00 | $25.00 |
| 625E29002 TRENCH, 24" DEEP | 124 FT | $14.00 | $14.00 | $14.00 | $8.50 | $15.00 |
| 625E30706 PULL BOX, 725.08, 24" | 6 EACH | $1,250 | $1,250 | $1,250 | $1,500 | $1,500 |
| 625E32000 GROUND ROD | 4 EACH | $275 | $275 | $275 | $300 | $300 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (CONTROLLER) | 1 EACH | $3,300 | $3,300 | $3,300 | $2,100 | $3,400 |
| 630E79200 SIGN ATTACHMENT ASSEMBLY, MAST ARM | 3 EACH | $800 | $800 | $940 | $565 | $500 |
| 630E80100 SIGN, FLAT SHEET | 20.6 SF | $35.00 | $35.00 | $40.00 | $25.00 | $30.00 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 5 EACH | $1,100 | $1,100 | $1,100 | $975 | $1,200 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 11 EACH | $40.00 | $40.00 | $40.00 | $40.00 | $50.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 932 FT | $3.00 | $3.00 | $3.00 | $3.00 | $4.00 |
| 632E67300 POWER CABLE, 3 CONDUCTOR, NO. 8 AWG | 160 FT | $7.00 | $7.00 | $8.00 | $5.00 | $8.00 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $2,350 | $2,350 | $2,750 | $2,750 | $2,400 |
| 632E90400 SIGNALIZATION, MISC.: REMOVAL OF 3-SECTION SIGNAL | 5 EACH | $75.00 | $75.00 | $80.00 | $150 | $100 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $3,100 | $3,100 | $3,100 | $4,100 | $3,200 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 1 EACH | $550 | $550 | $650 | $2,000 | $600 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $8,500 | $8,500 | $10,000 | $7,700 | $9,000 |
| 809E69123 ATC CONTROLLER, AS PER PLAN (INSTALLATION ONLY) | 1 EACH | $1,000 | $1,000 | $2,000 | $500 | $1,100 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,100 | $2,100 | $2,500 | $3,240 | $2,500 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,100 | $2,100 | $2,500 | $3,240 | $2,500 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (1 WAY) | 31 EACH | $20.00 | $8.00 | $30.00 | $25.00 | $25.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 3 EACH | $20.00 | $25.00 | $90.00 | $75.00 | $50.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 31 EACH | $30.00 | $15.00 | $35.00 | $30.00 | $25.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 3 EACH | $30.00 | $40.00 | $90.00 | $75.00 | $50.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $1,600 | $1,000 | $1,900 | $1,600 | $1,600 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 0.07 MILE | $900 | $10,000 | $19,000 | $900 | $17,000 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.33 MILE | $11,500 | $13,020 | $12,000 | $11,500 | $12,000 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.15 MILE | $1,200 | $10,000 | $9,600 | $1,200 | $8,500 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 770 FT | $0.90 | $1.50 | $1.50 | $0.90 | $1.50 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 39 FT | $20.00 | $9.00 | $15.00 | $20.00 | $15.00 |
| 622E41060 DUAL PORTABLE BARRIER TRANSITION/TERMINATION | 1 EACH | $5,000 | $5,000 | $5,900 | $10,000 | $15,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,500 | $4,800 | $10,000 | $7,000 | $30,000 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $2,000 | $2,500 | $2,600 | $1,000 | $2,000 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $2,000 | $2,500 | $2,600 | $1,000 | $2,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 868 SY | $109 | $95k | 13% |
| 203E20000 EMBANKMENT | 3,901 CY | $19 | $74k | 10% |
| 203E10000 EXCAVATION | 2,569 CY | $19 | $49k | 6% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,428 FT | $28 | $40k | 5% |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL (RAMP C & S.R. | 1 EACH | $36,648 | $37k | 5% |
| 632E72130 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 12 | 2 EACH | $17,000 | $34k | 4% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 3 EACH | $9,950 | $30k | 4% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 3 EACH | $8,900 | $27k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $25k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $25k | 3% |