ADA-SR 348-12.09
ADA County · est $0.5M
Bid dateThursday, February 22—
ADA County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 32 more items below.
| Item | Quantity | R1Scioto Valley Paving LLC | R2R C Construction Company And Son INC | R3Axis Civil Construction LLC | R4Djx Construction Company LLC | R5Alan Stone CO INC | % of bid |
|---|---|---|---|---|---|---|---|
| 611E96493 20' X 4' CONDUIT, TYPE A, 706.05, AS PER PLAN | 48 FT | $2,400 | $2,500 | $2,880 | $3,032 | $3,000 | 29% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $45,000 | $25,000 | $25,000 | $6,046 | $19,000 | 11% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 51 CY | $700 | $750 | $620 | $468 | $1,000 | 9% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 61 CY | $500 | $425 | $400 | $315 | $380 | 8% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 54 CY | $500 | $395 | $390 | $299 | $400 | 7% |
| 624E10000 MOBILIZATION |
| Item | Quantity | R1Scioto Valley Paving LLC | R2R C Construction Company And Son INC | R3Axis Civil Construction LLC | R4Djx Construction Company LLC | R5Alan Stone CO INC |
|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 106 FT | $10.00 | $5.00 | $6.00 | $8.75 | $15.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 1 EACH | $500 | $500 | $700 | $1,275 | $520 |
| 202E98200 REMOVAL MISC.:CONCRETE SIDEWALK | 31 FT | $30.00 | $10.00 | $18.00 | $10.75 | $50.00 |
| 203E20000 EMBANKMENT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $18,000 |
| $15,000 |
| $20,000 |
| $41,576 |
| $47,000 |
| 5% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 14 CY | $1,200 | $750 | $2,200 | $1,624 | $3,700 | 4% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 4,412 LB | $3.50 | $3.00 | $3.00 | $2.53 | $5.00 | 4% |
| 203E10000 EXCAVATION | 357 CY | $36.00 | $30.00 | $35.00 | $38.91 | $50.00 | 3% |
| 253E02000 PAVEMENT REPAIR | 139 CY | $80.00 | $50.00 | $220 | $319 | $300 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $17,000 | $5,000 | $7,329 | $6,000 | 3% |
| 304E20000 AGGREGATE BASE | 65 CY | $150 | $100 | $130 | $117 | $160 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,500 | $10,000 | $12,000 | $8,550 | $9,500 | 2% |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 45 CY | $185 | $140 | $135 | $128 | $220 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 1.5" | 529 SY | $15.00 | $30.00 | $14.00 | $18.33 | $25.00 | 2% |
| 621E00100 RPM | 10 EACH | $600 | $1,000 | $209 | $120 | $260 | 2% |
| 512E33000 TYPE 2 WATERPROOFING | 135 SY | $40.00 | $40.00 | $24.00 | $20.69 | $45.00 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $5,500 | $10,000 | $6,502 | $9,600 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,500 | $28,000 | $5,500 | $4,486 | $9,400 | 1% |
| 832E30000 EROSION CONTROL | 2,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 16 CY |
| $35.00 |
| $25.00 |
| $35.00 |
| $7.50 |
| $130 |
| 204E10000 SUBGRADE COMPACTION | 390 SY | $6.00 | $2.00 | $3.00 | $6.69 | $5.50 |
| 623E40500 REFERENCE MONUMENT, TYPE A | 4 EACH | $300 | $1,500 | $600 | $1,062 | $1,100 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 2 EACH | $100 | $275 | $400 | $73.51 | $730 |
| 659E10000 SEEDING AND MULCHING | 525 SY | $3.50 | $10.00 | $6.00 | $2.58 | $6.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 26 SY | $1.00 | $0.10 | $6.00 | $2.50 | $10.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.08 TON | $1,000 | $1,200 | $1,400 | $1,400 | $880 |
| 659E31000 LIME | 0.11 ACRE | $1,000 | $800 | $150 | $450 | $1,000 |
| 659E35000 WATER | 3 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $130 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 60 FT | $15.00 | $50.00 | $6.00 | $6.75 | $30.00 |
| 407E10000 TACK COAT | 103 GAL | $10.00 | $20.00 | $5.00 | $9.33 | $10.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 10 EACH | $20.00 | $50.00 | $40.00 | $120 | $60.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.11 MILE | $20,000 | $12,500 | $13,150 | $20,495 | $17,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.06 MILE | $20,000 | $45,000 | $17,500 | $20,495 | $22,000 |
| 407E10000 TACK COAT | 57 GAL | $10.00 | $10.00 | $5.00 | $9.33 | $5.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 47 CY | $25.00 | $40.00 | $110 | $72.98 | $150 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $20.00 | $20.00 | $65.00 | $130 | $100 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 26 CY | $50.00 | $50.00 | $300 | $375 | $394 |
| 616E10000 WATER | 5 MGAL | $1.00 | $1.00 | $1.00 | $12.51 | $1.00 |
| 202E23500 WEARING COURSE REMOVED | 74 SY | $18.00 | $30.00 | $14.00 | $9.05 | $6.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $800 | $15,000 | $28,000 | $55,708 | $57,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $800 | $15,000 | $17,000 | $8,304 | $15,000 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1 CY | $2,000 | $750 | $1,800 | $4,238 | $9,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 53 SY | $40.00 | $50.00 | $50.00 | $102 | $60.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 28 SF | $15.00 | $40.00 | $8.00 | $6.41 | $6.50 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 15 CY | $150 | $125 | $160 | $130 | $200 |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $200 | $1,000 | $2,200 | $1,660 | $1,500 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $1,000 | $1,000 | $500 | $1,000 | $1,900 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $1,000 | $1,000 | $500 | $1,000 | $1,900 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96493 20' X 4' CONDUIT, TYPE A, 706.05, AS PER PLAN | 48 FT | $2,400 | $115k | 27% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $45,000 | $45k | 11% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 51 CY | $700 | $36k | 8% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 61 CY | $500 | $31k | 7% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 54 CY | $500 | $27k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $18,000 | $18k | 4% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 14 CY | $1,200 | $17k | 4% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 4,412 LB | $3.5 | $15k | 4% |
| 203E10000 EXCAVATION | 357 CY | $36 | $13k | 3% |
| 253E02000 PAVEMENT REPAIR | 139 CY | $80 | $11k | 3% |