PIK-SR 32-25.87 (Safety)
PIK County · est $3.0M
Bid dateThursday, March 27—
PIK County · est $3.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 109 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Shelly & Sands INC | R3Allard Excavation LLC | R4Alan Stone CO INC | R5Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 2,084 CY | $181 | $159 | $181 | $230 | $181 | 19% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 3,741 CY | $64.90 | $65.00 | $66.00 | $58.00 | $73.64 | 12% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 8,370 FT | $18.00 | $15.00 | $19.40 | $17.00 | $19.40 | 8% |
| 441E10100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 630 CY | $220 | $230 | $220 | $320 | $220 | 7% |
| 304E20000 AGGREGATE BASE | 1,680 CY | $79.00 | $67.00 | $71.00 | $65.00 | $91.10 | 7% |
| 609E50000 4" CONCRETE TRAFFIC ISLAND |
| Item | Quantity | R1Axis Civil Construction LLC | R2Shelly & Sands INC | R3Allard Excavation LLC | R4Alan Stone CO INC | R5Sunesis Construction CO |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $12,000 | $6,075 | $10,000 | $6,219 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 124 FT | $24.00 | $35.00 | $14.00 | $15.00 | $19.42 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $700 | $125 | $154 | $470 | $1,263 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $1,200 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1,553 SY |
| $65.00 |
| $52.00 |
| $59.00 |
| $87.00 |
| $55.91 |
| 5% |
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (401 CY | $230 | $220 | $230 | $315 | $230 | 5% |
| 204E13000 EXCAVATION OF SUBGRADE | 3,741 CY | $22.01 | $26.42 | $18.49 | $30.82 | $36.33 | 4% |
| 203E10000 EXCAVATION | 3,114 CY | $26.00 | $30.00 | $29.00 | $30.00 | $41.29 | 4% |
| 611E96600 CONDUIT, BORED OR JACKED, 24" | 76 FT | $1,030 | $1,050 | $671 | $540 | $1,032 | 4% |
| 609E24510 CURB, TYPE 4-C | 2,477 FT | $29.00 | $28.00 | $25.00 | $27.00 | $29.07 | 4% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 3,233 FT | $20.00 | $14.00 | $11.00 | $15.00 | $15.06 | 3% |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 3,504 FT | $18.00 | $15.00 | $13.00 | $15.00 | $13.04 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $62,000 | $125,000 | $167,472 | $79,500 | $150,957 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $50,000 | $51,950 | $43,563 | $35,000 | $64,867 | 3% |
| 611E07400 18" CONDUIT, TYPE B | 848 FT | $56.00 | $100 | $88.00 | $95.00 | $141 | 2% |
| 202E23000 PAVEMENT REMOVED | 3,380 SY | $12.00 | $13.00 | $4.00 | $22.00 | $16.70 | 2% |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 2,566 FT | $15.00 | $15.00 | $13.85 | $15.00 | $15.00 | 2% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT22B40 | 8 EACH | $4,800 | $4,800 | $5,000 | $5,400 | $4,800 | 2% |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 6 EACH | $5,500 | $7,000 | $7,824 | $6,200 | $7,012 | 2% |
| $200 |
| $555 |
| $120 |
| $556 |
| 202E60010 MONUMENT ASSEMBLY REMOVED | 2 EACH | $400 | $200 | $154 | $300 | $189 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 12" | 42 FT | $75.00 | $60.00 | $110 | $65.00 | $55.55 |
| 203E20000 EMBANKMENT | 1,541 CY | $14.91 | $7.10 | $6.39 | $7.10 | $19.90 |
| 204E10000 SUBGRADE COMPACTION | 10,013 SY | $2.40 | $4.50 | $3.00 | $3.00 | $4.75 |
| 204E45000 PROOF ROLLING | 5 HOUR | $200 | $225 | $260 | $270 | $243 |
| 204E50000 GEOTEXTILE FABRIC | 10,013 SY | $1.90 | $0.50 | $1.00 | $1.50 | $2.80 |
| 606E13000 GUARDRAIL, TYPE 5 | 63 FT | $25.00 | $75.00 | $75.00 | $30.00 | $25.00 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 1 EACH | $1,200 | $1,200 | $2,180 | $1,400 | $1,200 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 1 EACH | $2,700 | $1,600 | $1,282 | $3,800 | $1,408 |
| 623E40500 REFERENCE MONUMENT, TYPE A | 2 EACH | $600 | $1,400 | $1,502 | $4,000 | $1,141 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 11 SY | $150 | $145 | $94.00 | $170 | $226 |
| 659E00300 TOPSOIL | 433 CY | $65.00 | $22.00 | $33.00 | $30.00 | $50.57 |
| 659E10000 SEEDING AND MULCHING | 3,903 SY | $1.25 | $1.25 | $4.75 | $1.50 | $2.23 |
| 659E14000 REPAIR SEEDING AND MULCHING | 195 SY | $1.25 | $1.25 | $0.05 | $3.50 | $2.00 |
| 659E31000 LIME | 0.81 ACRE | $150 | $150 | $50.00 | $910 | $450 |
| 659E35000 WATER | 22 MGAL | $1.00 | $1.00 | $1.00 | $110 | $10.00 |
| 670E00700 DITCH EROSION PROTECTION | 131 SY | $2.50 | $2.50 | $2.50 | $7.00 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,500 | $3,500 | $2,969 | $2,700 | $2,375 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $20,000 | $11,975 | $12,750 | $15,000 | $9,180 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $9,200 | $9,300 | $11,378 | $10,000 | $9,101 |
| 832E30000 EROSION CONTROL | 22,400 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 1 CY | $2,200 | $1,150 | $2,100 | $890 | $1,540 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 300 FT | $22.00 | $16.00 | $12.00 | $15.00 | $23.63 |
| 605E31100 AGGREGATE DRAINS | 129 FT | $18.00 | $16.00 | $43.00 | $30.00 | $21.51 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 301 FT | $24.00 | $27.00 | $9.00 | $35.00 | $47.56 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $31.00 | $20.00 | $12.00 | $30.00 | $26.05 |
| 611E04400 12" CONDUIT, TYPE B | 280 FT | $40.00 | $75.00 | $71.00 | $90.00 | $110 |
| 611E04400 12" CONDUIT, TYPE B, 706.02 | 10 FT | $170 | $300 | $130 | $190 | $464 |
| 611E05900 15" CONDUIT, TYPE B | 231 FT | $46.00 | $80.00 | $78.00 | $95.00 | $113 |
| 611E06100 15" CONDUIT, TYPE C | 8 FT | $100 | $225 | $88.00 | $150 | $198 |
| 611E10400 24" CONDUIT, TYPE B, 706.02 | 7 FT | $280 | $375 | $178 | $330 | $536 |
| 611E98151 CATCH BASIN, NO. 3, AS PER PLAN | 4 EACH | $6,500 | $7,700 | $10,089 | $6,000 | $7,682 |
| 611E98180 CATCH BASIN, NO. 3A | 2 EACH | $3,900 | $4,300 | $4,838 | $5,900 | $4,039 |
| 611E98410 CATCH BASIN, NO. 8 | 2 EACH | $5,200 | $8,500 | $5,484 | $6,600 | $6,242 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $4,800 | $4,000 | $5,701 | $4,500 | $4,723 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 4 EACH | $350 | $425 | $445 | $550 | $445 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 1.25" | 10,095 SY | $2.60 | $3.00 | $2.60 | $3.50 | $3.04 |
| 304E20000 AGGREGATE BASE, UNDER GUARDRAIL | 14 CY | $120 | $100 | $239 | $90.00 | $287 |
| 407E20000 NON-TRACKING TACK COAT | 2,389 GAL | $3.90 | $3.50 | $3.90 | $6.00 | $3.90 |
| 441E70200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (3 CY | $950 | $585 | $950 | $800 | $950 |
| 609E54000 6" CONCRETE TRAFFIC ISLAND | 58 SY | $90.00 | $165 | $185 | $200 | $180 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 2,211 FT | $8.20 | $2.75 | $3.00 | $9.50 | $3.08 |
| 625E00450 CONNECTION, FUSED PULL APART | 20 EACH | $165 | $165 | $144 | $190 | $165 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 18 EACH | $155 | $155 | $115 | $180 | $155 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT10B30 | 2 EACH | $3,400 | $3,400 | $3,300 | $3,800 | $3,400 |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 2 EACH | $1,925 | $1,925 | $2,000 | $2,200 | $1,925 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 8 EACH | $1,950 | $1,950 | $2,400 | $2,200 | $1,950 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 909 FT | $4.00 | $4.00 | $4.10 | $4.50 | $4.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,728 FT | $2.50 | $2.50 | $2.00 | $3.00 | $2.50 |
| 625E25408 CONDUIT, 2", 725.051 | 20 FT | $3.80 | $3.80 | $16.00 | $4.50 | $3.80 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 619 FT | $32.00 | $32.00 | $78.00 | $35.00 | $32.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 10 EACH | $550 | $550 | $475 | $620 | $550 |
| 625E29000 TRENCH | 1,898 FT | $9.00 | $9.00 | $15.00 | $10.00 | $9.00 |
| 625E30700 PULL BOX, 725.08, 18" | 5 EACH | $1,450 | $1,450 | $1,150 | $1,600 | $1,450 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,800 | $1,800 | $1,500 | $2,000 | $1,800 |
| 625E31510 PULL BOX REMOVED | 1 EACH | $500 | $500 | $250 | $560 | $500 |
| 625E32000 GROUND ROD | 10 EACH | $400 | $400 | $305 | $450 | $400 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $16,500 | $16,500 | $8,257 | $19,000 | $16,500 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 1,898 FT | $2.50 | $2.50 | $3.00 | $3.00 | $2.50 |
| 625E75402 LIGHT POLE REMOVED FOR STORAGE AS PER PLAN | 2 EACH | $1,000 | $1,000 | $350 | $1,100 | $1,000 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 2 EACH | $750 | $750 | $200 | $850 | $750 |
| 625E75550 DISTRIBUTION CABLE REMOVED | 825 FT | $1.30 | $1.30 | $0.40 | $1.50 | $1.30 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL LIGHTING CONTROL | 1 EACH | $3,800 | $3,800 | $3,500 | $4,300 | $3,800 |
| 625E98100 LIGHTING, MISC.: FILL AND PLUG EXISTING LIGHTING C | 275 FT | $20.00 | $20.00 | $5.00 | $25.00 | $20.00 |
| 620E60000 DELINEATOR, POST SURFACE MOUNTED | 47 EACH | $155 | $155 | $155 | $130 | $115 |
| 621E00100 RPM | 199 EACH | $42.00 | $42.00 | $42.00 | $65.00 | $45.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 174 EACH | $28.00 | $9.00 | $14.00 | $10.00 | $13.08 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 630 FT | $14.00 | $15.00 | $15.00 | $15.00 | $14.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 91 FT | $21.00 | $21.00 | $17.00 | $25.00 | $21.00 |
| 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7 | 253 FT | $21.00 | $21.00 | $35.00 | $25.00 | $21.00 |
| 630E08600 SIGN POST REFLECTOR | 29 EACH | $45.00 | $45.00 | $45.00 | $50.00 | $45.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 14 EACH | $310 | $310 | $620 | $350 | $310 |
| 630E80100 SIGN, FLAT SHEET | 643 SF | $20.31 | $20.31 | $16.25 | $23.36 | $20.31 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 14 EACH | $500 | $500 | $975 | $560 | $500 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 43 EACH | $20.00 | $20.00 | $15.00 | $25.00 | $20.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $125 | $125 | $65.00 | $140 | $125 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 27 EACH | $20.00 | $20.00 | $20.00 | $25.00 | $20.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 2 EACH | $250 | $250 | $125 | $280 | $250 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 4 EACH | $375 | $375 | $280 | $420 | $375 |
| 644E00104 EDGE LINE, 6" | 1.31 MILE | $6,390 | $6,390 | $7,200 | $7,600 | $6,150 |
| 644E00204 LANE LINE, 6" | 1.33 MILE | $2,470 | $2,470 | $3,600 | $2,900 | $2,900 |
| 644E00300 CENTER LINE, TYPE 1 (DOUBLE SOLID) | 0.07 MILE | $11,350 | $11,350 | $12,000 | $13,000 | $7,885 |
| 644E00400 CHANNELIZING LINE, 8" | 1,937 FT | $1.80 | $1.80 | $1.75 | $2.00 | $1.50 |
| 644E00500 STOP LINE | 39 FT | $7.50 | $7.50 | $15.00 | $9.00 | $5.50 |
| 644E01300 LANE ARROW | 18 EACH | $150 | $150 | $200 | $180 | $200 |
| 644E01510 DOTTED LINE, 6" | 843 FT | $1.25 | $1.25 | $1.95 | $1.50 | $1.40 |
| 644E20800 YIELD LINE | 117 FT | $4.00 | $4.00 | $30.00 | $4.50 | $7.75 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $3,800 | $3,800 | $2,500 | $4,300 | $3,800 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $65.00 | $100 | $106 | $100 | $75.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,800 | $2,100 | $2,100 | $2,400 | $2,037 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 4 EACH | $125 | $125 | $125 | $220 | $248 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 171 EACH | $20.00 | $8.00 | $22.00 | $30.00 | $11.26 |
| 614E13350 OBJECT MARKER, ONE WAY | 171 EACH | $20.00 | $14.00 | $26.00 | $15.00 | $20.35 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $1,500 | $1,500 | $1,500 | $1,300 | $1,113 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.1 MILE | $27,750 | $27,750 | $27,750 | $8,100 | $3,345 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 3.51 MILE | $1,500 | $1,500 | $1,500 | $4,900 | $1,880 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 1,751 FT | $1.35 | $1.35 | $1.35 | $1.50 | $1.05 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 1,560 FT | $0.95 | $0.95 | $0.95 | $1.00 | $1.00 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 95 FT | $12.00 | $12.00 | $15.00 | $5.50 | $3.50 |
| 616E10000 WATER | 1 MGAL | $1.00 | $110 | $1.00 | $110 | $14.61 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $18,657 | $18,954 | $20,000 | $16,130 |
| 619E16000 FIELD OFFICE, TYPE A | 9 MNTH | $1,350 | $4,400 | $1,500 | $1,200 | $1,174 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $20,000 | $43,000 | $77,875 | $75,000 | $38,900 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $1,600 | $1,700 | $3,500 | $2,500 | $2,800 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $1,600 | $1,700 | $1,625 | $2,500 | $2,800 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 2,084 CY | $180.5 | $376k | 14% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 3,741 CY | $64.9 | $243k | 9% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 8,370 FT | $18 | $151k | 6% |
| 441E10100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 630 CY | $219.5 | $138k | 5% |
| 304E20000 AGGREGATE BASE | 1,680 CY | $79 | $133k | 5% |
| 609E50000 4" CONCRETE TRAFFIC ISLAND | 1,553 SY | $65 | $101k | 4% |
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (401 CY | $229.5 | $92k | 3% |
| 204E13000 EXCAVATION OF SUBGRADE | 3,741 CY | $22.01 | $82k | 3% |
| 203E10000 EXCAVATION | 3,114 CY | $26 | $81k | 3% |
| 611E96600 CONDUIT, BORED OR JACKED, 24" | 76 FT | $1,030 | $78k | 3% |