PAU-SR 637-12.27
PAU County · est $1.0M
Bid dateThursday, May 8—
PAU County · est $1.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 34 more items below.
| Item | Quantity | R1Miller Contracting Group INC | R2Vernon Nagel INC | R3Fenson Contracting LLC | R4Vtf Excavation LLC | R5Advanced Excavating & Demolition | R6LLC Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 601E28001 DUMPED ROCK FILL, TYPE D, AS PER PLAN | 3,506 CY | $47.00 | $72.00 | $62.00 | $78.03 | $76.00 | $98.00 | 24% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 721 CY | $88.00 | $44.00 | $47.50 | $46.17 | $56.00 | $117 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $59,095 | $37,000 | $20,000 |
| Item | Quantity | R1Miller Contracting Group INC | R2Vernon Nagel INC | R3Fenson Contracting LLC | R4Vtf Excavation LLC | R5Advanced Excavating & Demolition | R6LLC Eclipse CO LLC |
|---|---|---|---|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 294 FT | $13.00 | $6.00 | $10.00 | $16.55 | $20.00 | $28.00 |
| 202E38000 GUARDRAIL REMOVED | 1,212.5 FT | $2.25 | $4.00 | $2.10 | $2.69 | $2.00 | $2.00 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 2 EACH | $211 | $290 | $305 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $69,195 |
| $60,000 |
| $56,800 |
| 9% |
| 203E10000 EXCAVATION | 7,185 CY | $8.00 | $10.00 | $17.25 | $15.75 | $25.00 | $30.00 | 9% |
| 203E20000 EMBANKMENT | 3,095 CY | $18.00 | $10.00 | $7.75 | $19.46 | $20.00 | $20.00 | 8% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 220 CY | $222 | $225 | $225 | $333 | $240 | $210 | 7% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 163 CY | $265 | $250 | $265 | $391 | $290 | $250 | 6% |
| 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN | 1,400 FT | $25.00 | $23.40 | $25.50 | $31.52 | $23.50 | $23.00 | 5% |
| 304E20000 AGGREGATE BASE | 463 CY | $62.00 | $65.00 | $57.75 | $55.09 | $62.00 | $76.00 | 4% |
| 659E00300 TOPSOIL | 510 CY | $31.00 | $30.00 | $50.00 | $20.44 | $30.00 | $68.00 | 2% |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 202E23000 PAVEMENT REMOVED | 1,933 SY | $6.00 | $10.00 | $9.00 | $6.46 | $11.00 | $8.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,275 | $9,500 | $18,000 | $8,835 | $12,000 | $13,687 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $10,000 | $25,000 | $9,891 | $20,000 | $1,500 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,800 | $7,500 | $9,000 | $6,818 | $20,000 | $12,981 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $9,520 | $5,000 | $25,000 | $11,583 | $45,000 | $10,266 | 1% |
| 253E02000 PAVEMENT REPAIR | 20 CY | $450 | $475 | $550 | $830 | $600 | $475 | 1% |
| 605E31100 AGGREGATE DRAINS | 272 FT | $33.00 | $15.00 | $18.50 | $18.42 | $25.00 | $22.00 | 1% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $8,440 | $8,500 | $8,500 | $10,794 | $8,200 | $8,014 | 1% |
| 611E04600 12" CONDUIT, TYPE C | 190 FT | $44.00 | $65.00 | $48.00 | $64.97 | $90.00 | $116 | 1% |
| $1,009 |
| $290 |
| $290 |
| 202E58100 CATCH BASIN REMOVED | 4 EACH | $454 | $250 | $350 | $558 | $780 | $450 |
| 202E98100 REMOVAL MISC.: WOOD POLE | 1 EACH | $123 | $250 | $250 | $309 | $750 | $450 |
| 204E10000 SUBGRADE COMPACTION | 2,164 SY | $1.25 | $1.00 | $1.50 | $1.13 | $2.00 | $1.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $233 | $250 | $150 | $292 | $345 | $292 |
| 204E50000 GEOTEXTILE FABRIC | 5,705 SY | $1.25 | $1.75 | $1.75 | $4.36 | $3.50 | $4.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 2 EACH | $2,611 | $3,150 | $2,600 | $3,340 | $2,480 | $2,480 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $2,950 | $3,000 | $1,800 | $3,367 | $2,000 | $2,500 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $2,950 | $2,000 | $1,800 | $3,367 | $2,000 | $2,500 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 13 CY | $163 | $120 | $150 | $133 | $162 | $143 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $55.00 | $60.00 | $60.00 | $67.35 | $60.00 | $70.00 |
| 659E10000 SEEDING AND MULCHING | 4,590 SY | $1.65 | $1.25 | $2.25 | $1.63 | $1.10 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 230 SY | $0.80 | $1.10 | $1.10 | $0.67 | $1.10 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.62 TON | $800 | $850 | $850 | $943 | $850 | $820 |
| 659E31000 LIME | 0.95 ACRE | $5.00 | $35.00 | $35.00 | $6.74 | $35.00 | $35.00 |
| 659E35000 WATER | 25 MGAL | $5.00 | $1.00 | $1.00 | $6.73 | $1.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,448 | $1,500 | $2,500 | $3,131 | $750 | $2,325 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $4,300 | $7,000 | $3,500 | $5,960 | $8,750 | $3,150 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $2,050 | $2,800 | $2,400 | $3,462 | $3,000 | $4,955 |
| 407E20000 NON-TRACKING TACK COAT | 214 GAL | $2.75 | $2.50 | $2.50 | $1.35 | $1.00 | $3.00 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 2 EACH | $79.00 | $180 | $190 | $242 | $180 | $180 |
| 621E00100 RPM | 10 EACH | $320 | $300 | $455 | $512 | $380 | $300 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 16 EACH | $13.25 | $12.00 | $15.00 | $16.84 | $12.50 | $13.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $110 | $100 | $100 | $128 | $100 | $95.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 3 EACH | $160 | $150 | $150 | $330 | $150 | $245 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.27 MILE | $3,850 | $3,650 | $2,450 | $3,098 | $2,300 | $3,650 |
| 642E00300 CENTER LINE, TYPE 1 | 0.14 MILE | $3,850 | $3,650 | $4,850 | $6,196 | $4,600 | $3,650 |
| 407E20000 NON-TRACKING TACK COAT | 20 GAL | $2.75 | $2.50 | $2.50 | $1.35 | $1.00 | $3.00 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 10 CY | $500 | $500 | $550 | $943 | $700 | $500 |
| 616E10000 WATER | 21 MGAL | $1.00 | $1.00 | $25.00 | $1.35 | $1.00 | $35.00 |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $55.00 | $90.00 | $60.00 | $68.23 | $78.00 | $150 |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $950 | $2,200 | $4,500 | $3,367 | $2,000 | $857 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E28001 DUMPED ROCK FILL, TYPE D, AS PER PLAN | 3,506 CY | $47 | $165k | 22% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 721 CY | $88 | $63k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $59,095 | $59k | 8% |
| 203E10000 EXCAVATION | 7,185 CY | $8 | $57k | 8% |
| 203E20000 EMBANKMENT | 3,095 CY | $18 | $56k | 8% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 220 CY | $222 | $49k | 7% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 163 CY | $265 | $43k | 6% |
| 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN | 1,400 FT | $25 | $35k | 5% |
| 304E20000 AGGREGATE BASE | 463 CY | $62 | $29k | 4% |
| 659E00300 TOPSOIL | 510 CY | $31 | $16k | 2% |