JEF-SR 150-03.544
JEF County · est $0.5M
Bid dateThursday, May 8—
JEF County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 50 more items below.
| Item | Quantity | R1Lms Construction INC | R2Ohio-west Virginia Excavating CO | R3Tucson INC | R4Nls Paving, INC | R5Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 287 CY | $235 | $259 | $292 | $250 | $265 | 18% |
| 304E20000 AGGREGATE BASE | 252 CY | $125 | $161 | $128 | $145 | $145 | 8% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (64 CY | $450 | $305 | $606 | $390 | $550 | 7% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 46 CY | $600 | $337 | $551 | $350 | $500 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $24,000 | $17,000 | $33,500 | $20,000 | $47,550 | 6% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM |
| Item | Quantity | R1Lms Construction INC | R2Ohio-west Virginia Excavating CO | R3Tucson INC | R4Nls Paving, INC | R5Shelly & Sands INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $3,600 | $10,120 | $1,000 | $900 |
| 202E30001 WALK REMOVED, AS PER PLAN | 804 SF | $5.00 | $5.00 | $3.50 | $9.00 | $1.50 |
| 202E32000 CURB REMOVED | 65 FT | $12.00 | $27.00 | $18.15 | $13.50 | $9.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 128 FT | $10.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $20,000 |
| $8,500 |
| $9,800 |
| $3,000 |
| $4,725 |
| 5% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $29,500 | $22,600 | $40,000 | $30,000 | 5% |
| 608E13000 6" CONCRETE WALK | 985 SF | $20.00 | $20.00 | $13.65 | $17.50 | $14.00 | 5% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 482 FT | $40.00 | $40.00 | $54.50 | $45.00 | $38.00 | 5% |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 680 FT | $25.00 | $26.00 | $36.00 | $35.00 | $25.00 | 4% |
| 608E21200 TEMPORARY ASPHALT CONCRETE WALK | 735 SF | $20.00 | $13.00 | $6.00 | $10.50 | $10.50 | 4% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 142 SY | $100 | $145 | $132 | $100 | $88.00 | 4% |
| 202E23000 PAVEMENT REMOVED | 1,362 SY | $10.00 | $27.00 | $10.00 | $40.00 | $21.00 | 4% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 9 SNMT | $1,500 | $1,800 | $1,660 | $1,600 | $1,500 | 4% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 77 SY | $140 | $221 | $124 | $170 | $145 | 3% |
| 611E07400 18" CONDUIT, TYPE B | 62 FT | $150 | $265 | $151 | $105 | $200 | 2% |
| 203E10000 EXCAVATION | 252 CY | $35.00 | $40.00 | $57.00 | $48.25 | $47.00 | 2% |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,925 | $2,450 | $2,755 | $3,100 | $2,925 | 2% |
| 609E26000 CURB, TYPE 6 | 168 FT | $50.00 | $75.00 | $42.00 | $66.00 | $63.00 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $7,500 | $8,900 | $8,300 | $8,000 | $8,200 | 2% |
| $95.00 |
| $11.10 |
| $45.00 |
| $42.00 |
| 202E58100 CATCH BASIN REMOVED | 3 EACH | $800 | $1,700 | $380 | $1,625 | $450 |
| 202E98000 REMOVAL MISC.: FOUNDATION | 1 LS | $800 | $1,800 | $1,525 | $950 | $2,250 |
| 202E98000 REMOVAL MISC.: SIGN SUPPORT ON BUILDING | 1 LS | $800 | $1,500 | $2,000 | $450 | $575 |
| 203E20000 EMBANKMENT | 112 CY | $35.00 | $73.00 | $36.50 | $100 | $20.00 |
| 203E98100 ROADWAY, MISC.: REMOVAL AND RESET OF DECORATIVE RO | 47 SY | $10.00 | $90.00 | $104 | $110 | $60.00 |
| 204E10000 SUBGRADE COMPACTION | 1,694 SY | $4.00 | $1.00 | $3.00 | $0.50 | $8.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $300 | $200 | $178 | $250 | $250 |
| 608E52000 CURB RAMP | 244 SF | $25.00 | $40.00 | $32.15 | $44.00 | $45.00 |
| 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO | 290 TON | $25.00 | $100 | $124 | $110 | $128 |
| 690E65024 SPECIAL - WORK INVOLVING REGULATED WATER | 50 GAL | $10.00 | $33.00 | $68.00 | $40.00 | $58.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 182 SY | $5.00 | $6.00 | $17.00 | $8.00 | $15.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $20,000 | $1,475 | $2,430 | $16,500 | $850 |
| 659E31000 LIME | 0.04 ACRE | $10,000 | $180 | $2,500 | $4,000 | $50.00 |
| 659E35000 WATER | 5 MGAL | $5.00 | $1.00 | $1.00 | $275 | $1.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E04600 12" CONDUIT, TYPE C | 43 FT | $80.00 | $140 | $178 | $104 | $150 |
| 611E05900 15" CONDUIT, TYPE B | 8 FT | $200 | $516 | $178 | $230 | $200 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $6,000 | $4,700 | $4,650 | $4,425 | $5,300 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $3,500 | $2,960 | $3,325 | $4,150 | $3,100 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $600 | $1,490 | $1,008 | $950 | $100 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 203 FT | $5.00 | $15.00 | $8.85 | $10.50 | $8.00 |
| 301E56100 ASPHALT CONCRETE BASE, PG64-22, (449), (DRIVEWAYS) | 3 CY | $950 | $1,105 | $991 | $450 | $900 |
| 407E20000 NON-TRACKING TACK COAT | 247 GAL | $3.00 | $9.00 | $4.00 | $4.00 | $3.50 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 7 CY | $950 | $765 | $1,050 | $575 | $950 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $2,000 | $3,772 | $1,000 | $1,500 | $900 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 27 SY | $150 | $360 | $109 | $300 | $130 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 5 EACH | $300 | $675 | $825 | $585 | $1,045 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 26 FT | $48.00 | $6.00 | $52.25 | $50.00 | $48.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $45.00 | $14.00 | $150 | $50.00 | $45.00 |
| 630E80100 SIGN, FLAT SHEET | 26 SF | $52.00 | $25.00 | $57.00 | $55.00 | $52.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $15.00 | $60.00 | $18.00 | $230 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $85.00 | $236 | $145 | $460 | $85.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $20.00 | $180 | $108 | $230 | $20.00 |
| 646E10010 EDGE LINE, 6" | 0.12 MILE | $15,000 | $19,260 | $32,000 | $17,400 | $16,320 |
| 646E10200 CENTER LINE | 0.06 MILE | $25,000 | $34,000 | $42,650 | $30,800 | $28,965 |
| 646E20504 DOTTED LINE, 6" | 21 FT | $6.00 | $6.00 | $4.60 | $5.50 | $5.00 |
| 410E10000 TRAFFIC COMPACTED SURFACE, TYPE A | 50 CY | $82.53 | $198 | $115 | $190 | $95.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $100 | $200 | $372 | $350 | $500 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 9 EACH | $50.00 | $55.00 | $55.50 | $50.00 | $10.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 9 EACH | $50.00 | $55.00 | $55.50 | $50.00 | $17.00 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.57 MILE | $3,325 | $3,900 | $3,660 | $3,600 | $3,325 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.57 MILE | $9,750 | $11,500 | $10,730 | $11,000 | $9,750 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $3,000 | $7,000 | $12,300 | $6,700 | $13,000 |
| 616E10000 WATER | 2 MGAL | $5.00 | $1.00 | $5.00 | $185 | $60.00 |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $1,400 | $3,800 | $2,375 | $3,000 | $7,900 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $4,000 | $16,300 | $27,000 | $18,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 287 CY | $235 | $67k | 14% |
| 304E20000 AGGREGATE BASE | 252 CY | $125 | $32k | 6% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (64 CY | $450 | $29k | 6% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 46 CY | $600 | $28k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $24,000 | $24k | 5% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $20k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 4% |
| 608E13000 6" CONCRETE WALK | 985 SF | $20 | $20k | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 482 FT | $40 | $19k | 4% |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 680 FT | $25 | $17k | 3% |