MED-IR 271-05.64
MED County · est $0.4M
Bid dateThursday, July 31—
MED County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.
| Item | Quantity | R1Great Lakes Construction CO | R2Alan Stone CO INC | R3Ohio-west Virginia Excavating CO | R4Craig Edward Susany INC | % of bid |
|---|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: W16x57 FURNISHED | 1,513 FT | $75.00 | $55.00 | $68.00 | $112 | 26% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 1,074.6 FT | $95.00 | $90.00 | $97.00 | $289 | 23% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 24" DIAMETER UNR | 576 FT | $100 | $90.00 | $97.00 | $90.00 | 13% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 455.4 FT | $95.00 | $150 | $92.00 | $289 | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $39,000 | $65,000 | $41,117 | $10,000 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $22,400 | $64,000 | $79,750 |
| Item | Quantity | R1Great Lakes Construction CO | R2Alan Stone CO INC | R3Ohio-west Virginia Excavating CO | R4Craig Edward Susany INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,500 | $10,000 | $6,000 | $1,000 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 175 FT | $10.00 | $10.00 | $11.00 | $10.00 |
| 203E20000 EMBANKMENT | 9.1 CY | $120 | $40.00 | $298 | $300 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $180 | $200 | $25.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $20,000 |
| 5% |
| 619E16020 FIELD OFFICE, TYPE C | 3 MNTH | $4,000 | $3,000 | $6,500 | $4,000 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 260 FT | $35.00 | $40.00 | $81.00 | $100 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $100 | $100 | $200 | $100 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $7,000 | $2,500 | $10,000 | 1% |
| 606E16500 GUARDRAIL REBUILT, TYPE 5 | 175 FT | $25.00 | $30.00 | $34.00 | $40.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,000 | $6,000 | $8,000 | $25,000 | 1% |
| 659E10000 SEEDING AND MULCHING | 110 SY | $28.00 | $25.00 | $40.00 | $31.00 | 1% |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 4 SNMT | $750 | $1,200 | $1,500 | $1,200 | 1% |
| 511E81300 CONCRETE, MISC.: PRECAST CONCRETE LAGGING PANEL | 1 EACH | $3,000 | $3,100 | $7,128 | $3,000 | 1% |
| 690E98000 SPECIAL - INCLINOMETER | 1 EACH | $2,750 | $2,200 | $10,000 | $5,000 | 1% |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $2,500 | $2,700 | $2,020 | $10,000 | 1% |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $2,500 | $2,700 | $2,020 | $1,000 | 1% |
| 832E30000 EROSION CONTROL | 2,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,100 | $2,400 | $2,727 | $3,000 | 0% |
| 12 CY |
| $120 |
| $90.00 |
| $225 |
| $100 |
| 659E14000 REPAIR SEEDING AND MULCHING | 6 SY | $8.00 | $320 | $40.00 | $120 |
| 659E15000 INTER-SEEDING | 6 SY | $1.00 | $55.00 | $40.00 | $115 |
| 659E20000 COMMERCIAL FERTILIZER | 0.01 TON | $1,000 | $660 | $1,700 | $1,200 |
| 659E31000 LIME | 0.02 ACRE | $100 | $940 | $202 | $600 |
| 659E35000 WATER | 0.61 MGAL | $50.00 | $1.00 | $1.00 | $1.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (1WAY) | 4 EACH | $15.00 | $15.00 | $15.00 | $20.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $47.00 | $150 | $175 | $200 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 1 EACH | $48.00 | $320 | $370 | $400 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 4 EACH | $150 | $290 | $336 | $300 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 (1WAY) | 6 EACH | $7.95 | $15.00 | $16.00 | $20.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 6 EACH | $13.00 | $25.00 | $26.00 | $20.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: W16x57 FURNISHED | 1,513 FT | $75 | $113k | 25% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 1,074.6 FT | $95 | $102k | 23% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 24" DIAMETER UNR | 576 FT | $100 | $58k | 13% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 455.4 FT | $95 | $43k | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $39,000 | $39k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $22,400 | $22k | 5% |
| 619E16020 FIELD OFFICE, TYPE C | 3 MNTH | $4,000 | $12k | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 260 FT | $35 | $9k | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $100 | $8k | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $5k | 1% |