ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 130 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Miller Bros Const INC | R3Axis Civil Construction LLC | R4Complete General Construction Company | R5Danbert Incorporated | R6Strawser Paving CO INC | R7Double Z Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 422E11001 AGGREGATE, SINGLE CHIP SEAL, TYPE A, AS PER PLAN | 67,600 SY | $2.30 | $2.30 | $2.30 | $2.30 | $2.30 | $4.00 | $2.30 | 11% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 969 CY | $155 | $170 | $170 | $170 | $170 | $209 |
| Item | Quantity | R1Shelly & Sands INC | R2Miller Bros Const INC | R3Axis Civil Construction LLC | R4Complete General Construction Company | R5Danbert Incorporated | R6Strawser Paving CO INC | R7Double Z Construction Company |
|---|---|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 7 EACH | $250 | $700 | $500 | $400 | $1,223 | $400 | $300 |
| 202E30000 WALK REMOVED | 358 SF | $1.00 | $4.45 | $3.20 | $3.50 | $3.42 | $2.50 | $3.50 |
| 202E30200 STEPS REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $170 |
| 10% |
| 304E20000 AGGREGATE BASE | 1,402 CY | $85.00 | $85.00 | $102 | $100 | $95.67 | $98.00 | $120 | 8% |
| 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 915 SY | $110 | $109 | $135 | $118 | $96.10 | $75.00 | $120 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $120,738 | $100,000 | $137,500 | $100,000 | $125,000 | $145,000 | 7% |
| 609E31001 COMBINATION CURB AND GUTTER, TYPE 9, AS PER PLAN - | 1,103 FT | $83.00 | $46.75 | $42.00 | $87.00 | $41.35 | $75.50 | $125 | 6% |
| 203E10000 EXCAVATION | 3,781 CY | $22.00 | $25.00 | $28.50 | $35.00 | $37.55 | $21.50 | $43.00 | 6% |
| 611E16600 36" CONDUIT, TYPE C | 417 FT | $177 | $180 | $215 | $223 | $281 | $228 | $215 | 5% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (327 CY | $180 | $181 | $181 | $181 | $181 | $244 | $181 | 4% |
| 659E00301 TOPSOIL, AS PER PLAN | 1,626 CY | $35.00 | $25.00 | $50.00 | $35.00 | $41.86 | $60.50 | $52.00 | 4% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 250 CY | $220 | $201 | $201 | $201 | $201 | $300 | $201 | 4% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 235 CY | $230 | $221 | $221 | $221 | $221 | $305 | $221 | 4% |
| 206E10500 CEMENT | 228 TON | $228 | $215 | $240 | $210 | $228 | $228 | $228 | 4% |
| 832E30000 EROSION CONTROL | 50,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 202E23000 PAVEMENT REMOVED | 5,081 SY | $9.50 | $15.00 | $13.50 | $13.00 | $11.76 | $10.50 | $20.00 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $44,500 | $40,000 | $40,000 | $25,000 | $19,750 | $19,600 | $55,000 | 3% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 45 SNMT | $950 | $950 | $610 | $1,000 | $614 | $600 | $950 | 3% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 2,202 FT | $19.00 | $13.50 | $29.00 | $23.00 | $27.22 | $13.75 | $20.00 | 3% |
| 609E26000 CURB, TYPE 6 | 1,159 FT | $32.00 | $18.00 | $32.00 | $39.00 | $27.05 | $24.00 | $40.00 | 3% |
| 611E98370 CATCH BASIN, NO. 6 | 10 EACH | $3,650 | $3,850 | $4,400 | $4,450 | $6,170 | $4,200 | $4,000 | 3% |
| 14 FT |
| $10.00 |
| $35.00 |
| $80.00 |
| $68.00 |
| $43.68 |
| $53.00 |
| $35.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 434 FT | $25.00 | $37.00 | $35.00 | $27.00 | $22.38 | $25.00 | $14.00 |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER | 636 FT | $42.00 | $71.00 | $40.00 | $59.00 | $26.18 | $40.00 | $35.00 |
| 202E53100 MAILBOX REMOVED | 2 EACH | $100 | $150 | $150 | $135 | $113 | $96.00 | $100 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $300 | $800 | $880 | $580 | $684 | $400 | $600 |
| 202E62700 SEPTIC TANK REMOVED | 2 EACH | $1,800 | $2,550 | $2,000 | $3,900 | $1,800 | $1,000 | $1,800 |
| 202E66000 SPECIAL - DRILLED WATER WELL ABANDONED | 2 EACH | $2,200 | $2,200 | $5,000 | $2,500 | $1,554 | $1,600 | $2,200 |
| 202E75000 FENCE REMOVED | 34 FT | $3.00 | $25.00 | $15.00 | $22.00 | $34.13 | $2.00 | $15.00 |
| 202E98000 REMOVAL MISC.:LANDSCAPING ROCKS | 1 LS | $250 | $1,150 | $500 | $1,150 | $917 | $50.00 | $300 |
| 202E98100 REMOVAL MISC.: CLOTHESLINE POLE | 2 EACH | $50.00 | $550 | $200 | $185 | $108 | $50.00 | $80.00 |
| 202E98100 REMOVAL MISC.: INSPECTION WELL | 1 EACH | $300 | $800 | $500 | $470 | $432 | $100 | $500 |
| 202E98100 REMOVAL MISC.: PLOW | 1 EACH | $150 | $650 | $250 | $370 | $101 | $50.00 | $100 |
| 202E98100 REMOVAL MISC.: WAGON AND STEEL WHEEL | 1 EACH | $150 | $650 | $250 | $370 | $203 | $50.00 | $100 |
| 202E98200 REMOVAL MISC.: BRICK EDGING | 44 FT | $2.00 | $14.50 | $15.00 | $8.50 | $29.91 | $1.00 | $5.00 |
| 202E98200 REMOVAL MISC.: CONDUIT | 25 FT | $11.00 | $66.00 | $15.00 | $25.00 | $35.62 | $10.00 | $8.00 |
| 203E20000 EMBANKMENT | 2,373 CY | $10.00 | $11.00 | $28.50 | $10.00 | $34.69 | $22.00 | $25.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 10 CY | $25.00 | $70.00 | $42.00 | $25.00 | $343 | $15.00 | $175 |
| 204E10000 SUBGRADE COMPACTION | 8,257 SY | $2.00 | $2.80 | $3.50 | $3.00 | $3.29 | $1.00 | $0.60 |
| 204E45000 PROOF ROLLING | 4 HOUR | $275 | $150 | $300 | $330 | $200 | $150 | $200 |
| 206E11000 CURING COAT | 7,533 SY | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 |
| 206E15020 CEMENT STABILIZED SUBGRADE, 14 INCHES DEEP | 7,533 SY | $3.25 | $3.00 | $3.50 | $4.00 | $3.23 | $3.20 | $9.00 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 9 EACH | $1,700 | $2,800 | $2,200 | $1,600 | $2,302 | $1,400 | $1,600 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 33 EACH | $150 | $438 | $200 | $365 | $438 | $500 | $250 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $2,000 | $3,150 | $800 | $3,400 | $2,500 | $3,700 | $1,200 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $2,000 | $3,150 | $800 | $3,400 | $2,500 | $9,100 | $1,200 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 12 EACH | $200 | $200 | $200 | $250 | $497 | $236 | $212 |
| 690E98400 SPECIAL -FAA-CONSTRUCTION EQUIPMENT MARKING | 1 LS | $650 | $650 | $1,500 | $2,000 | $5,000 | $600 | $500 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 2 SY | $135 | $400 | $220 | $135 | $407 | $100 | $300 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 29 CY | $135 | $225 | $160 | $175 | $263 | $100 | $190 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 9 CY | $225 | $212 | $160 | $280 | $346 | $100 | $240 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $135 | $135 | $135 | $100 | $150 | $100 | $150 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 13,011 SY | $0.75 | $0.73 | $0.75 | $0.93 | $0.92 | $0.95 | $0.92 |
| 659E14000 REPAIR SEEDING AND MULCHING | 660 SY | $0.80 | $0.80 | $0.80 | $1.50 | $0.92 | $1.50 | $0.92 |
| 659E15000 INTER-SEEDING | 660 SY | $0.80 | $0.80 | $0.80 | $1.50 | $0.92 | $1.50 | $0.92 |
| 659E20000 COMMERCIAL FERTILIZER | 1.82 TON | $850 | $841 | $650 | $700 | $1,250 | $700 | $1,250 |
| 659E31000 LIME | 2.69 ACRE | $145 | $146 | $160 | $10.00 | $150 | $10.00 | $150 |
| 659E35000 WATER | 72 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 659E40000 MOWING | 29 MSF | $50.00 | $1.00 | $29.00 | $25.00 | $40.00 | $25.00 | $40.00 |
| 670E00500 SLOPE EROSION PROTECTION | 954 SY | $1.40 | $1.39 | $1.40 | $2.25 | $2.25 | $2.25 | $2.25 |
| 670E00700 DITCH EROSION PROTECTION | 510 SY | $1.50 | $1.49 | $1.50 | $2.00 | $2.25 | $2.00 | $2.25 |
| 670E00720 DITCH EROSION PROTECTION MAT, TYPE B | 216 SY | $1.50 | $1.49 | $1.50 | $2.00 | $2.25 | $2.00 | $2.25 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,700 | $2,500 | $2,600 | $2,500 | $2,500 | $2,600 | $2,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $7,000 | $7,250 | $8,560 | $11,750 | $11,750 | $4,300 | $16,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $12,500 | $8,220 | $13,000 | $12,000 | $2,500 | $12,100 | $17,000 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 203 SY | $5.50 | $5.49 | $5.50 | $4.35 | $5.00 | $4.40 | $5.00 |
| 602E20000 CONCRETE MASONRY | 5.9 CY | $3,200 | $2,800 | $2,880 | $4,570 | $5,256 | $3,500 | $4,000 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 759 FT | $20.00 | $24.00 | $30.95 | $39.00 | $25.89 | $13.50 | $20.00 |
| 605E31100 AGGREGATE DRAINS | 20 FT | $18.00 | $50.00 | $50.00 | $30.00 | $34.63 | $10.00 | $30.00 |
| 611E00400 4" CONDUIT, TYPE E | 140 FT | $15.00 | $24.00 | $28.00 | $19.00 | $29.56 | $7.00 | $9.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 333 FT | $30.00 | $45.00 | $35.00 | $21.00 | $29.49 | $21.00 | $14.00 |
| 611E02000 8" CONDUIT, TYPE C | 24 FT | $55.00 | $158 | $95.00 | $87.00 | $141 | $40.00 | $13.00 |
| 611E03100 10" CONDUIT, TYPE B | 75 FT | $50.00 | $48.50 | $42.00 | $62.00 | $120 | $15.00 | $13.00 |
| 611E03600 10" CONDUIT, TYPE E | 75 FT | $40.00 | $37.00 | $42.00 | $49.00 | $120 | $15.00 | $10.00 |
| 611E03700 10" CONDUIT, TYPE F | 75 FT | $40.00 | $37.00 | $42.00 | $49.00 | $120 | $15.00 | $10.00 |
| 611E04400 12" CONDUIT, TYPE B | 325 FT | $100 | $90.00 | $100 | $123 | $157 | $124 | $130 |
| 611E04900 12" CONDUIT, TYPE D | 139 FT | $85.00 | $90.00 | $100 | $106 | $110 | $143 | $100 |
| 611E05700 15" CONDUIT, TYPE A, 706.01, 707.04 (0.079), 707. | 99 FT | $110 | $102 | $100 | $114 | $121 | $147 | $160 |
| 611E06400 15" CONDUIT, TYPE D | 122 FT | $90.00 | $100 | $110 | $107 | $140 | $142 | $110 |
| 611E07600 18" CONDUIT, TYPE C | 8 FT | $230 | $215 | $220 | $155 | $198 | $164 | $230 |
| 611E10900 24" CONDUIT, TYPE D | 62 FT | $140 | $150 | $145 | $157 | $233 | $192 | $160 |
| 611E13200 30" CONDUIT, TYPE A, 706.02, 707.04 (0.109), 707. | 81 FT | $180 | $218 | $210 | $172 | $273 | $300 | $260 |
| 611E13400 30" CONDUIT, TYPE B | 85 FT | $199 | $215 | $210 | $194 | $289 | $300 | $260 |
| 611E97400 CONDUIT, MISC.:TYPE B FOR DRAINAGE DISCHARGE CONTI | 50 FT | $30.00 | $41.00 | $30.00 | $50.00 | $113 | $12.00 | $13.00 |
| 611E97400 CONDUIT, MISC.:TYPE C FOR DRAINAGE DISCHARGE CONTI | 50 FT | $24.00 | $41.00 | $30.00 | $35.00 | $113 | $12.00 | $12.00 |
| 611E97400 CONDUIT, MISC.:TYPE E FOR DRAINAGE DISCHARGE CONTI | 25 FT | $24.00 | $41.00 | $50.00 | $23.00 | $116 | $12.00 | $10.00 |
| 611E97400 CONDUIT, MISC.:TYPE F FOR DRAINAGE DISCHARGE CONTI | 25 FT | $24.00 | $41.00 | $50.00 | $23.00 | $116 | $42.50 | $10.00 |
| 611E99574 MANHOLE, NO. 3 | 4 EACH | $5,600 | $6,300 | $9,500 | $7,950 | $11,074 | $6,900 | $6,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $275 | $650 | $500 | $500 | $546 | $250 | $625 |
| 611E99720 INSPECTION WELL | 1 EACH | $750 | $1,850 | $1,500 | $1,400 | $2,961 | $500 | $1,000 |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 200 SY | $55.00 | $110 | $110 | $110 | $110 | $75.00 | $115 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 104 FT | $5.00 | $3.50 | $6.00 | $8.00 | $4.27 | $2.50 | $8.00 |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 200 SY | $135 | $140 | $140 | $140 | $140 | $200 | $150 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2" | 231 SY | $9.00 | $10.50 | $10.50 | $10.50 | $15.37 | $10.00 | $10.50 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 968 SY | $9.00 | $10.50 | $10.50 | $10.50 | $15.37 | $12.00 | $10.50 |
| 407E20000 NON-TRACKING TACK COAT | 1,285 GAL | $3.50 | $4.10 | $4.10 | $4.10 | $4.10 | $5.50 | $4.10 |
| 408E10000 PRIME COAT | 50 GAL | $5.00 | $10.00 | $10.00 | $10.00 | $10.00 | $4.75 | $10.00 |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 50 CY | $325 | $450 | $450 | $450 | $450 | $400 | $450 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $370 | $265 | $265 | $265 | $265 | $700 | $265 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 340 SY | $79.00 | $79.00 | $125 | $113 | $91.60 | $129 | $115 |
| 609E31001 COMBINATION CURB AND GUTTER, TYPE 9, AS PER PLAN - | 308 FT | $75.00 | $40.00 | $40.00 | $94.00 | $37.10 | $46.50 | $120 |
| 609E54000 6" CONCRETE TRAFFIC ISLAND | 269 SY | $72.00 | $79.75 | $105 | $90.00 | $87.25 | $84.00 | $100 |
| 617E10100 COMPACTED AGGREGATE | 40 CY | $125 | $140 | $250 | $250 | $211 | $295 | $250 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 47 CY | $125 | $150 | $215 | $215 | $186 | $224 | $215 |
| 625E00450 CONNECTION, FUSED PULL APART | 16 EACH | $110 | $110 | $110 | $150 | $157 | $158 | $110 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 24 EACH | $110 | $110 | $110 | $120 | $121 | $127 | $110 |
| 625E02500 TRANSFORMER BASE, TYPE AT-A | 1 EACH | $975 | $975 | $975 | $650 | $650 | $700 | $975 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT12B35 | 3 EACH | $3,900 | $3,900 | $3,900 | $3,200 | $3,622 | $3,400 | $3,900 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT15B35 | 5 EACH | $4,200 | $4,200 | $4,200 | $3,250 | $3,772 | $3,400 | $4,200 |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 8 EACH | $1,800 | $1,800 | $1,800 | $2,100 | $1,349 | $2,000 | $1,800 |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 738 FT | $3.50 | $3.50 | $3.50 | $3.00 | $3.07 | $3.20 | $3.50 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 782 FT | $2.00 | $2.00 | $2.00 | $2.00 | $2.94 | $2.10 | $2.00 |
| 625E24324 1-1/2" DUCT CABLE WITH THREE NO. 6 AWG 2400 VOLT C | 1,375 FT | $11.00 | $11.00 | $11.00 | $18.00 | $15.75 | $19.00 | $11.00 |
| 625E25500 CONDUIT, 3", 725.04 | 177 FT | $31.00 | $31.00 | $31.00 | $37.00 | $69.73 | $39.00 | $31.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 8 EACH | $275 | $275 | $275 | $500 | $603 | $500 | $275 |
| 625E29000 TRENCH | 1,270 FT | $12.00 | $12.00 | $12.00 | $10.00 | $7.71 | $10.50 | $12.00 |
| 625E30700 PULL BOX, 725.08, 18" | 6 EACH | $1,050 | $1,050 | $1,050 | $1,350 | $1,222 | $1,400 | $1,050 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,305 | $1,305 | $1,305 | $1,600 | $1,342 | $1,700 | $1,305 |
| 625E32000 GROUND ROD | 8 EACH | $265 | $265 | $265 | $350 | $381 | $400 | $265 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $9,150 | $9,150 | $9,150 | $10,000 | $17,775 | $9,100 | $9,150 |
| 625E34300 TRANSFORMER PAD, CONCRETE | 1 EACH | $750 | $750 | $750 | $2,950 | $1,900 | $3,100 | $750 |
| 625E36010 UNDERGROUND WARNING MARKING TAPE | 1,270 FT | $3.00 | $3.00 | $3.00 | $2.00 | $0.17 | $2.10 | $3.00 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (S.R. 158/COONPAT | 1 EACH | $3,450 | $3,450 | $3,450 | $3,700 | $3,710 | $3,900 | $3,450 |
| 621E00100 RPM | 121 EACH | $54.00 | $53.00 | $53.00 | $72.83 | $46.00 | $53.00 | $72.83 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 27 EACH | $10.00 | $15.00 | $40.00 | $29.00 | $44.20 | $14.25 | $17.81 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 275 FT | $20.00 | $18.00 | $20.00 | $18.00 | $19.80 | $20.00 | $19.11 |
| 630E08600 SIGN POST REFLECTOR | 4 EACH | $50.00 | $75.00 | $50.00 | $75.00 | $70.48 | $50.00 | $79.63 |
| 630E80100 SIGN, FLAT SHEET | 195.2 SF | $22.00 | $20.00 | $22.00 | $20.00 | $23.11 | $22.00 | $21.24 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 27 EACH | $30.00 | $35.00 | $30.00 | $35.00 | $48.94 | $30.00 | $37.16 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 15 EACH | $30.00 | $30.00 | $30.00 | $30.00 | $48.94 | $30.00 | $31.85 |
| 644E00104 EDGE LINE, 6" | 0.9 MILE | $6,300 | $5,315 | $7,250 | $5,315 | $6,300 | $7,976 | $5,315 |
| 644E00300 CENTER LINE, DOUBLE YELLOW | 0.37 MILE | $6,700 | $10,500 | $8,400 | $10,500 | $6,700 | $9,242 | $10,500 |
| 644E00400 CHANNELIZING LINE, 8" | 132 FT | $8.00 | $10.00 | $2.65 | $10.00 | $8.00 | $2.90 | $10.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE, YELLOW | 257 FT | $8.80 | $10.00 | $8.00 | $10.00 | $8.00 | $8.80 | $10.00 |
| 644E01514 DOTTED LINE, 8", WHITE | 137 FT | $1.75 | $5.00 | $3.00 | $5.00 | $1.75 | $3.30 | $5.00 |
| 644E20800 YIELD LINE | 60 FT | $13.00 | $50.00 | $11.25 | $50.00 | $13.00 | $12.50 | $50.00 |
| 204E50000 GEOTEXTILE FABRIC | 896 SY | $2.40 | $2.39 | $2.39 | $2.39 | $3.01 | $3.00 | $4.00 |
| 657E10001 RIPRAP FOR TREE PROTECTION, AS PER PLAN | 448 SY | $62.00 | $61.37 | $62.00 | $61.36 | $34.53 | $111 | $100 |
| 661E19000 DECIDUOUS SHRUB, 12" HEIGHT (RHUS AROMATICA, B&B 5 | 27 EACH | $95.50 | $95.37 | $96.00 | $95.37 | $100 | $183 | $100 |
| 661E50040 EVERGREEN TREE, 2' HEIGHT (PINUS MUGO, B&B 8" MIN. | 5 EACH | $108 | $107 | $108 | $107 | $500 | $183 | $500 |
| 202E56000 BUILDING DEMOLISHED, PARCEL 18, 2-STORY FRAMED HOU | 1 LS | $32,750 | $50,000 | $65,000 | $53,000 | $48,350 | $42,600 | $56,350 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $104 | $90.00 | $75.00 | $125 | $120 | $109 | $75.00 |
| 614E12421 DETOUR SIGNING, AS PER PLAN | 1 LS | $15,000 | $16,995 | $30,000 | $50,000 | $33,706 | $33,700 | $25,000 |
| 616E10000 WATER | 1 MGAL | $100 | $90.00 | $1.00 | $180 | $500 | $192 | $100 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 1 MILE | $1,380 | $2,060 | $995 | $2,060 | $1,380 | $1,100 | $2,060 |
| 642E00300 CENTER LINE, TYPE 1 | 0.5 MILE | $1,380 | $4,120 | $1,700 | $4,120 | $1,380 | $1,870 | $4,120 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $16,396 | $11,969 | $25,000 | $20,000 | $22,000 | $15,200 | $20,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $32,840 | $30,000 | $45,000 | $50,000 | $100,000 | $56,000 | $105,000 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $26,500 | $36,800 | $35,000 | $44,000 | $55,550 | $53,900 | $40,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 422E11001 AGGREGATE, SINGLE CHIP SEAL, TYPE A, AS PER PLAN | 67,600 SY | $2.3 | $155k | 7% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 969 CY | $155 | $150k | 6% |
| 304E20000 AGGREGATE BASE | 1,402 CY | $85 | $119k | 5% |
| 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 915 SY | $110 | $101k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 4% |
| 609E31001 COMBINATION CURB AND GUTTER, TYPE 9, AS PER PLAN - | 1,103 FT | $83 | $92k | 4% |
| 203E10000 EXCAVATION | 3,781 CY | $22 | $83k | 4% |
| 611E16600 36" CONDUIT, TYPE C | 417 FT | $177 | $74k | 3% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (327 CY | $180 | $59k | 3% |
| 659E00301 TOPSOIL, AS PER PLAN | 1,626 CY | $35 | $57k | 2% |