HAM-IR 74-00.00 Cable
HAM County · est $1.4M
Bid dateThursday, November 13—
HAM County · est $1.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 1 more items below.
| Item | Quantity | R1Rmd Holdings LTD | R2Lake Erie Construction Company | R3John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|
| 690E98300 SPECIAL - 4'' CONCRETE MOW STRIP | 10,851 SY | $55.25 | $59.50 | $80.47 | 45% |
| AA2 606E55000 SPECIAL - CABLE BARRIER (GILBALTAR) (ALTERNATE 2) | 25,232 FT | $13.50 | $27.50 | $22.15 | 26% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $120,000 | $98,500 | $142,020 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $120,000 | $75,000 | $95,000 | 9% |
| AA2 606E55150 SPECIAL - CABLE BARRIER, ANCHOR ASSEMBLY (GILBALTA | 32 EACH | $2,400 | $4,120 | $4,250 | 6% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 250 HOUR | $100 | $80.00 | $148 | 2% |
| 659E10000 SEEDING AND MULCHING | 11,214 SY | $1.14 |
| Item | Quantity | R1Rmd Holdings LTD | R2Lake Erie Construction Company | R3John R Jurgensen Company |
|---|---|---|---|---|
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1.00 | $6,500 | $13,371 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1.75 |
| $1.15 |
| 1% |
| 659E00300 TOPSOIL | 1,245 CY | $7.75 | $25.00 | $35.23 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $9,495 | $9,264 | 0% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | 0% |
| 203E10000 EXCAVATION | 1,192 CY | $4.00 | $108 | $59.79 | 0% |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,800 | $3,000 | $2,800 | 0% |
| 626E00118 BARRIER REFLECTOR, TYPE 6 (UNIDIRECTIONAL) | 253 EACH | $10.00 | $14.00 | $5.00 | 0% |
| 659E20000 COMMERCIAL FERTILIZER | 1.51 TON | $700 | $500 | $1,500 | 0% |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $1,000 | $4,500 | $3,880 | 0% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $1,000 | $2,500 | $3,671 | 0% |
| 659E35000 WATER | 61 MGAL | $1.00 | $1.00 | $1.00 | 0% |
| 659E31000 LIME | 2.32 ACRE | $10.00 | $100 | $200 | 0% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 16 SNMT | $1.00 | $350 | $850 | 0% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 16 SNMT | $1.00 | $150 | $725 | 0% |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 690E98300 SPECIAL - 4'' CONCRETE MOW STRIP | 10,851 SY | $55.25 | $600k | 45% |
| AA2 606E55000 SPECIAL - CABLE BARRIER (GILBALTAR) (ALTERNATE 2) | 25,232 FT | $13.5 | $341k | 26% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $120,000 | $120k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $120,000 | $120k | 9% |
| AA2 606E55150 SPECIAL - CABLE BARRIER, ANCHOR ASSEMBLY (GILBALTA | 32 EACH | $2,400 | $77k | 6% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 250 HOUR | $100 | $25k | 2% |
| 659E10000 SEEDING AND MULCHING | 11,214 SY | $1.14 | $13k | 1% |
| 659E00300 TOPSOIL | 1,245 CY | $7.75 | $10k | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $7k | 0% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1 | $5k | 0% |